第一篇:安裝單位應組織安裝技術人員進行現場勘察
安裝單位應組織安裝技術人員進行現場勘察
近些年來,隨著我國經濟的持續穩定發展,工程建設的規模也越來越大,高層建筑大量涌現,建筑施工中投入的建筑起重設備日趨增多,尤其是塔式起重機和施工升降機使用較多,機電方面安全管理的工作量及難度也隨之增加。但由于當前建筑市場還不夠完全規范,部分施工單位對安全管理的形勢和風險認識不足,在資金和人員投入上明顯不足,故監理單位對起重機械安全使用方面的安全監理工作要更加積極主動。下面以本人監理的一個項目為例,和大家一起探討如何做好建筑機電設備安全監理工作。
In recent years, along with our country economy sustained and stable development, the scale of the project construction is becoming more and more big, high-rise buildings springing up, the investment in the construction of construction lifting equipment increasing, especially the tower crane and construction hoist use is more, mechanical and electrical aspects of safety management of the workload and difficulty also will increase.But due to the current construction market is not enough completely specification,part
construction
units
insufficient understanding of the situation of safety management and risk, in money and personnel, so the supervision company for safe use of lifting machinery safety supervision work to be more proactive.Here in my supervision of a project, for example, to discuss with you how to do a www.tmdps.cn安裝單位應組織安裝技術人員進行現場勘察www.tmdps.cn good job of building mechanical and electrical equipment safety supervision.一、工程安全評估及目標
A, engineering safety assessment and goal
本項目由中建系統某下屬公司總承包,雖然總承包單位的資質等級為特級,但報建的項目經理不到位,現場技術及管理人員較少,安全管理人員僅3名,且無專業機電方面人員,施工方的機電管理力量明顯薄弱。本項目總工期較短,投入使用的建筑起重設備多,存在的交叉作業也較多,時有加班搶工現象,很容易出現安全監管漏洞。而建筑起重設備的使用事關公眾安全,近幾年來高層建筑由塔吊、施工升降機不當使用及違規安裝、拆除引發的安全事故不在少數,所以塔吊、人貨電梯的安全監管工作必須扎實、嚴密,來不得半點疏忽。本項目的安全管理目標是自始至終不發生重大安全事故和人身傷亡事故,塔吊、施工升降機的安全監管是不可忽視的一個重要環節。監理機構應充分認識到本項目起重設備安全監管任務的復雜性,對塔吊及升降機等起重設備在安裝、拆除、使用、維護等關健環節要采取積極主動的安全監理,確保本項目所用的塔吊(升降機)等安裝、拆除及使用過程自始至終不出現安全事故及未遂安全事故。www.tmdps.cn安裝單位應組織安裝技術人員進行現場勘察www.tmdps.cn Some subordinate company general contracting this project by the build system, while the overall contractor qualification level as special, but to establish the project manager does not reach the designated position, on-site technical and management personnel is less, only 3 safety management personnel, and no professional mechanical and electrical aspects, construction of mechanical and electrical power management is obvious weak.This total project duration is shorter, put into use of construction lifting equipment, existing cross homework more, also often work overtime to rob workers phenomenon, it is easy to appear safety regulatory loopholes.And the use of construction lifting equipment is a matter of public safety, high-rise buildings in recent years by the tower crane, construction elevator misuse and illegal installation, dismantle safety accident caused by not a few, therefore, tower crane, one cargo lift safety supervision must be solid, closely, which permits no neglect.The safety management objectives of this project is not a major safety accident and casualty accidents, tower crane, construction elevator safety regulation is an important link of cannot be ignored.Supervision agency should fully realize the project hoisting equipment safety supervision of the complexity of the task, for tower crane and hoist and other lifting equipment during the installation, dismantling, operation and maintenance and so on key link to take active safety supervision, to ensure that the tower crane used in this project(elevator)and other www.tmdps.cn安裝單位應組織安裝技術人員進行現場勘察www.tmdps.cn installation, removal and use process from beginning to end not attempted safety accident and safety accidents.二、安全監理工作措施幾點概述
Second, some overview of work safety supervision and management measures
1.總監理工程師親自布置與檢查安全方面的有關工作
1.The general supervision engineer personally arrangement related to check the safety work
通過安全方面的評估,本項目的安全生產形勢不容樂觀,稍有懈怠,可能會發生安全事故,尤其是起重機械使用方面。總監本人對本項目施工始終緊繃著一根時刻要安全的弦,時刻保持與業主、總包單位的溝通交流,提倡三方每周對施工現場進行一次安全專項檢查。每次周檢查監理人員都積極參加,尤其重視對塔吊、施工升降機的檢查,監理組安排機電專業監理工程師負責塔吊、施工升降機及臨時用電方面的安全監理工作,總監經常對監理組的安全監管工作進行檢查。
Through safety evaluation, the objective of the production safety situation www.tmdps.cn安裝單位應組織安裝技術人員進行現場勘察www.tmdps.cn is not optimistic, fact, safety accident may occur, especially the use of hoisting machinery.Director himself to this project construction always tight string with a moment to safety, keep communication with owner, the contractor unit, advocates the three parties to the construction site safety special inspection once a week.Took an active part in each week inspection supervision personnel, especially the value of tower crane, construction elevator inspection and supervision group of mechanical and electrical professional supervision engineer is responsible for the tower crane, construction elevator and temporary electricity utilization in terms of work safety supervision, director of group supervision often inspect safety supervision work.2.定期組織學習,提高監理人員安全監管水平
2.Organize regular learning, improve the level of supervision personnel safety regulation
監理組通常每半月進行一次安全學習,通過學習,監理人員熟悉了塔吊、施工升降機等的建筑機械的工作原理,另一方面也提高了安全風險意識和法律責任意識,從而提高了對建筑機械設備安全監理的能力和力度。就以通聯QTZ63B塔吊為例,該塔吊額定起重力矩72t.m,最大工作幅度55m,最大起重量為6t,最大起重力矩為84tm,www.tmdps.cn安裝單位應組織安裝技術人員進行現場勘察www.tmdps.cn 最大附著起升高度為140m。為了保證塔機工作的穩定性和整機剛性,減少上部塔身的自由長度,在塔身全高設置四套附著架,四套附著相對位置h1=31.5m,h2=27.5m,h3=25m,h4=25m。每節標準節長度為2.5m。監理學習后就很清楚地知道塔吊安裝附著的具體要求,也就是不超過12個標準節必須安裝首道附著,其后是不得超過11、10、10個標準節應安裝第二、三、四道附著。
Supervision group usually once every half month to safety study, through the study, supervision personnel familiar with the tower crane, construction elevator construction machinery works, on the other hand also improves the security risk consciousness and legal responsibility consciousness, to improve the ability of safety supervision of construction machinery equipment and strength.As tonly QTZ63B tower crane as an example, the crane rated lifting moment 72 t.m, the maximum working range 55 m, maximum weight of 6 t, the largest lifting torque of 84 tm, biggest adherent lifting height is 140 m.In order to ensure the stability of tower crane and the rigidity, reduce the free length of the upper tower, four sets of attachment is set in the towers are all high, four sets of attached relative position h1 = 31.5 m, h2 = 27.5 m, h3 = 25 m, h4 = 25 m.Each section length is 2.5 m.Supervising learning know very well that after the tower crane installation to the specific requirements of the attachment, which is not more than 12 standard attached section must be www.tmdps.cn安裝單位應組織安裝技術人員進行現場勘察www.tmdps.cn installed first, followed by shall not exceed 11, 10, 10 standard section should be installed the second, three, four attachment.3.定期檢查安全漏洞,分析安全形勢,制定安全監理措施。
3.Regularly check the security vulnerabilities, analyze the security situation, make the safety supervision measures.項目監理組通常每月召開一次安全形勢的評估分析會議,重點進行安全形勢分析。對塔吊、人貨電梯的初安裝、加節、附著安裝、拆除施工等關鍵環節可能出現的問題或隱患進行分析,制定安全監理措施。監理人員定期對現場使用的塔吊、人貨電梯的操作使用、運行、維護、保養、人員上崗等情況進行監督檢查,查找施工方在安全監管上漏洞,督促施工完善監管措施,及時消除安全隱患。
Project supervision group are usually held once a month security assessment of the situation analysis meeting, focus on analysis the security situation.For tower crane, cargo elevator installation, add section, at the beginning of such key links as attached installation, demolition of construction possible problems or hidden dangers were analyzed, and the safety supervision measures.Supervisory staff on a regular basis for field use of tower crane and one cargo lift operation, operation, maintenance, www.tmdps.cn安裝單位應組織安裝技術人員進行現場勘察www.tmdps.cn maintenance, staff, and so on and so forth, conducting supervision and inspection to find loopholes in safety supervision, quality supervise construction perfect regulatory measures, timely eliminate safe hidden trouble.4.重點審查塔吊、施工升降機、物料提升機的安裝(拆卸)專項施工方案,在巡視中檢查方案落實情況
4.Focus on review the installation of the tower crane, construction elevator, material hoist(remove)special construction plan, during a tour of inspection scheme to carry out the situation
項目監理機構從安全角度應重點審查以下幾方面內容:1)選用的設備是否滿足項目施工需要2)設備基礎方案、平臺方案是否滿足安裝需要,主要查看計算書;3)安裝(拆卸)單位資質、人員是否符合要求;4)安裝(拆卸)作業對周邊環境設施是否有影響,實施前是否履行告知義務;5)設備安全管理協議、安全交底、應急救援預案等是否齊全,這些方案審查通過后,組織監理人員進行學習、交底,使監理人員掌握設備的關鍵技術指標及有關參數,以便監理人員在巡視時能夠檢查發現問題。
Project supervision mechanism from a security perspective review should www.tmdps.cn安裝單位應組織安裝技術人員進行現場勘察www.tmdps.cn focus on the following aspects: 1)selection of equipment whether meet the needs of the project construction scheme, 2)equipment foundation platform solutions whether meet the requirements of installation, mainly to check the calculations;3)install(remove)unit qualification, personnel is in line with the requirements;4)installation(remove)homework, does this have any impact on surrounding environment facilities, whether before the implementation performance of the inform obligation;5)equipment safety management, safety disclosure agreement, such as contingency plan is complete, these solutions, after the assessment, disclosure supervision personnel for organizational learning, the key technical indicators of supervisory staff to grasp equipment and related parameters, so that when a supervisory staff on patrol inspection found the problem.5.在巡視檢查中注重檢查是否存在安全隱患
5.Pay attention to check whether there is potential safety hazard in the patrol inspection
項目監理機構的每一個成員在巡視檢查時均要關注機電設備的安全情況,在監理工作初期未進行專門的安全隱患巡視記錄,后來總監認為不進行專項的安全記錄(平行檢查),監理人員在巡視中容易www.tmdps.cn安裝單位應組織安裝技術人員進行現場勘察www.tmdps.cn 忽視安全情況,尤其是機電方面的安全。因此在后期實行了專門的安全巡視記錄,專門記錄安全隱患的發現及處理情況,并將有關情況告知業主和施工單位。
Project supervision institutions of every member in the patrol inspection when all attention to the security situation, the mechanical and electrical equipment at the beginning of the supervision work without special security patrol record, then director think without special safety record(parallel)examination, supervision of staff in the tour is easy to ignore the security situation, especially mechanical and electrical safety.So in the later has a dedicated security patrol record, record the safety problems found and processing conditions, and shall inform owner and the construction of the relevant units.三、起重機械設備安全監理監控要點
Three, lifting machinery safety supervision control points
1.監理要點:
1.The supervision key points: www.tmdps.cn安裝單位應組織安裝技術人員進行現場勘察www.tmdps.cn
1.審核塔機(升降機)的特種設備制造許可證、產品合格證、制造監督檢驗證明、備案證明等文件。關鍵點:有下列情況之一的塔機(升降機)嚴禁使用:1)國家明令淘汰的產品;2)超過規定使用年限經評估不合格的產品;3)不符合國家現行相關標準的產品;4)沒有完整安全技術檔案的產品。
1.Review the tower crane(elevator)special equipment manufacturing license, product certification, manufacture supervision and inspection certificate, and other filing documents.Key point: one of the following situations of tower crane(elevator)is strictly prohibited: 1)the product declared obsolete by formal decree of the state;2)in excess of the prescribed use fixed number of year with the unqualified products;3)do not conform to the current national related standards of products;4)no complete safety technical files of product.2.審核塔吊(升降機)安裝單位、使用單位的資質證書、安全生產許可證和特種作業人員的特種作業操作資格證書。關鍵點:拆卸單位必須具有從事5年起重機(升降機)安裝、拆卸業務的資質;塔機(升降機)安裝、拆卸作業應配備下列人員:1)持有安全生產考核合格證書的項目負責人和安全負責人、機械管理人員2)具有建筑施工特種作業操作資格證書的塔機(升降機)安裝拆卸工、起重司機、電工、起重信號工、司索工等特種作業操作人員。www.tmdps.cn安裝單位應組織安裝技術人員進行現場勘察www.tmdps.cn
2.Review the tower crane(elevator)unit installation, use the unit qualification certificate, safety production license of special operations and special operations personnel qualification certificate.Key point: remove the unit must have engaged in 5 years hoist(elevator)installation, remove the business qualifications;Tower crane(elevator)installation, remove operation shall be provided with the following persons: 1)to hold production safety inspection certificate of quality and safety director, project manager of mechanical construction special operations management 2)has the operation qualification certificates of the tower crane(elevator)installation disassembly work, lifting the driver, electrician, lifting bell man, special operations personnel division line engineering, etc.3.審核塔吊(升降機)安裝、拆卸工程專項施工方案;
3.Review the tower crane(elevator)installation, remove engineering special construction plan;
4.監督安裝單位執行塔吊(升降機)安裝、拆卸工程專項施工方案情況; www.tmdps.cn安裝單位應組織安裝技術人員進行現場勘察www.tmdps.cn 4.Supervise installation company executive tower crane(elevator)installation, remove the special engineering construction scheme;
5.監督檢查塔吊(升降機)的使用情況,督促使用單位經常對塔機(升降機)進行保養、維護。
5.Supervise and inspect the tower crane(lift)the usage of supervision unit using often to tower crane(lift)for maintenance, maintenance.6.發現存在生產安全事故隱患的,要求安裝單位、使用單位限期整改,對安裝單位、使用單位拒不整改的,及時向建設單位報告。
6.Production safety accidents are found out, and asks to install unit, the use of rectification within a time limit, the unit installation, use the unit refuses to rectification, report to the construction unit.2.監理人員應了解的塔吊、升降機(井架)安裝(拆除)安全使用注意事項
2.Supervisory personnel should be aware of tower crane, elevator, derrick)installation safety considerations(removed)www.tmdps.cn安裝單位應組織安裝技術人員進行現場勘察www.tmdps.cn
1.安裝前,安裝單位應組織安裝技術人員進行現場勘察,掌握現場的實際情況。.組織安裝人員學習塔機、升降機(井架)安裝技術、規范,對塔機的結構、技術性能做進一步了解。
1.Before installation, the installation unit shall organize technical personnel on-site investigation, grasp the actual situation.Tower crane, elevator installation personnel organizational learning(derrick)installation technology, standard, the structure of tower crane, technical performance for further understanding.2.塔機、升降機(井架)裝拆工作屬于高空作業,危險性較大,裝拆人員必須具有較高的安全意識和較好的技術水平。安裝拆除作業施工前,安裝單位應對現場作業人員進行安全教育和安全技術交底。
2.The tower crane, elevator, derrick)belongs to the work high above the installation work, risk bigger, installation personnel must have a higher level of security awareness and better technology.Removed before operation, installation unit to on-site staff for safety education and safety technical disclosure.3.總包單位應把塔吊和升降機納入重大危險源管理體系,在安裝及拆除和使用過程中落實以下安全技術措施: www.tmdps.cn安裝單位應組織安裝技術人員進行現場勘察www.tmdps.cn
3.The total package units shall incorporate cranes and elevators in major hazards management system, in the process of installation and removal and use to implement the following safety technical measures:
施工作業人員進入施工現場均需戴好安全帽并系好帽帶。
Construction work personnel to enter the construction site must wear safety helmet and fasten good place.高空作業人員要使用安全帶。
Aerial work personnel to use seat belts.高空作業嚴禁穿硬底鞋、易滑鞋。
Aerial work hard are strictly prohibited to wear shoes, sliding shoes easily.嚴禁酒后作業及高空拋物。
No drunken assignments and high altitude parabolic.www.tmdps.cn安裝單位應組織安裝技術人員進行現場勘察www.tmdps.cn
作業人員要相互配合、團結協作。
Homework personnel should cooperate with each other, solidarity and collaboration.施工現場閑人免進,劃定作業區域,專人監督。
No admittance to the construction site, the designated work areas, personnel supervision.雨天、霧天及四級以上大風禁止作業。
Rainy day, fog and wind more than four ban on homework.塔吊、汽車吊吊臂及吊物下方禁止站人。
Tower crane, mobile crane boom and hanging below the standing people is prohibited.在頂升(降落)作業中必須有專人指揮,專人照管電源,專人操作液壓系統和專人緊固螺栓,非有關操作人員,不得登上爬升架的操作平www.tmdps.cn安裝單位應組織安裝技術人員進行現場勘察www.tmdps.cn 臺,更不能擅自啟動操作閥開關或其他電器設備。
On top of(land)is required in working personnel command, specialist care power, personnel operating hydraulic systems and personnel fastening bolts, the relevant operating personnel, shall not be mounted climbing frame operating platform, cannot do STH without authorization launch more operating valve switch or other electrical equipment.頂升(降落)作業應在白天進行,如遇特殊情況,需在夜間作業時,必須有充足的照明設備。
Jack-up(land)operations shall be carried out during the day, in case of special circumstances, when working in the night, there must be sufficient lighting.至允許在四級風以下進行作業,如在作業中遇到風力加大,必須停止工作,并緊固螺栓使上下塔身連結一體。
To allow to operate under moderate breeze, such as wind more, encountered in the work must be stop working, and fastening bolt to link up and down the tower.www.tmdps.cn安裝單位應組織安裝技術人員進行現場勘察www.tmdps.cn 塔式起重機的力矩限制器、重量限制器、變幅限位器、行走限位器、高度限位器等安全保護裝置不得隨意調整和拆除,嚴禁用限位裝置代替操縱機構。
Tower crane torque limiter, weight limiter, amplitude limiter, stop walking, height limiter and other safety protection devices shall not be arbitrarily adjusted and removal, it is forbidden to use limit device instead of operating mechanism.施工升降機必須安裝防墜安全器。防墜安全器應在一年有效標定期內使用。為確保施工升降機的安全使用,施工升降機應每三個月做一次墜落試驗,并形成記錄。
Construction lifter for safety device must be installed.For safety device should be used during the one year valid calibration period.In order to ensure the safe use of construction hoist, construction hoist shall be once every three months to do drop test, and form a record.施工升降機應安裝超載保護裝置,超載保護裝置在載荷達到額定重量的110%前應能中止吊籠啟動。
Construction lifter overload protective device should be installed, and the www.tmdps.cn安裝單位應組織安裝技術人員進行現場勘察www.tmdps.cn overload protection device before reach 110% of the rated weight load should be suspended crane cage started.施工升降機安裝作業時必須將按鈕盒或操作盒移到吊籠頂部操作。當導軌架或附墻架上有人作業時,嚴禁開動施工升降機。
Construction elevator installation operations button box or operation box must be moved to the hanging basket at the top of the operation.When the guide rail frame or attached to the wall frame on some homework, it is strictly prohibited to start the construction lifter.塔機和施工升降機的安裝作業范圍應設置警戒線及明顯的警示標志。非作業人員不得進入警戒范圍。任何人不得在懸吊物下方行走或停留。
The installation of the tower crane and construction hoist operation scope shall set the stage and the obvious warning signs.The homework personnel must not enter the alert.No one may walk or stay at the bottom of the suspended objects.塔機和升降機在安裝、頂升加節、附墻、拆除等關鍵環節,安裝單位的專業技術人員、專職安全生產管理人員應進行現場監督??偘透鱳ww.tmdps.cn安裝單位應組織安裝技術人員進行現場勘察www.tmdps.cn 標段的安全管理人員也應在現場監督。
Tower crane and hoist in installation, jack-up, such key links as attached, dismantle, installation unit of professional and technical personnel, full-time safety management personnel should be on-site supervision.Total bid packages and the safety management personnel should be on site supervision.塔吊、施工升降機、物料提升機(井架)安裝后須經有資質的檢測機構檢測,取得檢測合格證后方可使用。
Tower crane, construction elevator, material hoist(derrick)after installation shall be certified by a qualified testing agency, have test certificates rear can use.四、結束語
Four, the conclusion
隨著社會的發展,建筑起重機械安全管理存在的新問題將不斷出現,各地建設行政主管部門及安全監督機構、各參建單位要根據相關法律法規,認真落實對施工現場建筑施工起重機械的管理責任,切實www.tmdps.cn安裝單位應組織安裝技術人員進行現場勘察www.tmdps.cn 提高安全生產水平。
Along with the development of the society, new problems of safety management in construction hoisting machinery will appear constantly, around the construction administrative department and safety supervision agencies, the contractors should according to relevant laws and regulations and earnestly implement the responsibility for the management of the construction site construction hoisting machinery, improve the level of safety in production earnestly.
第二篇:安裝現場管理制度
工程項目現場管理制度
一、嚴格服從工程項目經理的管理安排。
二、進場前必須安全教育;要求現場施工人員,必須按照安全條款施工;做到文明施工、安全生產。
三、施工人員要對現場設備、設施產品、成品注意保護。
四、對施工人員進行工作進度計劃安排,目標要求,技術交底。
五、嚴禁在施工現場吸煙。
六、嚴禁在施工過程中打鬧。
七、禁止酒后施工作業。
八、施工過程中,嚴格按照安全操作程序使用工具,禁止一切違章操作。電焊作業必須遠離易燃易爆材質,并配滅火設備器材。
九、嚴禁在無任何安全保護條件下,進行高空作業。
十、特殊工種禁止無證上崗。
十一、嚴格按照施工規范完成每道工序,確保每道工序質量。設備安裝完成后,項目責任人必須親自檢查是否達到要求,并作好記錄。
十二、保證施工現場的整潔有序。
十三、施工現場設備、設施、材料等必須根據現場情況妥善管理以確保其安全。
十四、現場設備、材料、配件必須按施工順序歸類擺放,便于作業。
十五、施工現場必須留置和保持物流主次通道,特別是保證主通道必須暢通。
十六、施工過程中,必須采取有效措施,注意保護原成品設備,設施,裝修飾品以及建筑主體結構。
十七、現場施工用電必須嚴格按規范操作,連接電源必須與現場工程管理確認。由專業持證電工連接。
十八、施工過程中,現場管理人員,必須每日檢查、提醒、監督、重視安全施工,及時排除安全隱患,施工操作者必須按相關安全規定條例執行,不得有誤。
十九、每日施工收工時,必須清理現場,清點相關工具設備配件,材料,作好下次施工準備。
二十、施工中,材料、機具、余料、輔助材料,不得隨意、隨地、雜亂無章的堆放、拋撒。用剩余料必須收放好返回工廠。
二十二、使用電動工具的過程中除電焊外,禁止帶手套操作,嚴禁違規,野蠻操作。
第三篇:設備安裝現場管理制度
設備安裝現場管理制度
為了確保本工程順利進行,按期保質保量的完成工程施工任務,公司特制定以下管理制度,望廣大職工共同遵守、切實執行。
一、本工地的所有員工必須遵守本公司制定的一切規章制度,聽從公司管理 人員的指揮和安排,服從業主單位、工程監理、安全檢查、工程質量監督等部門的指導和檢查。
二、遵紀守法、爭做奉獻求實、愛崗敬業、文明先進的員工。嚴格遵守業主 方企業的一切管理制度,不得違反。
三、堅決遵守工地作息時間,按時上、下班和晚休,不得遲到和早退,有事 要請假,不得擅離職守。保證工程進度加班安排服從項目負責人安排。
四、嚴禁打架斗毆、賭、黃,若有違反者,不論情由,均處以1000元罰款,其醫藥費自理后公司再做處理。對屢教不改、情節嚴重者,送交司法部門處理。
五、對不服從公司管理人員和相關部門的安排,尋釁鬧事、故意制造事端均 處以500元罰款,并開出當事人,情節嚴重者,送交司法部門處理。
六、文明用語、講文明、講禮貌、團結進取、求實創新。
七、對工地材料、設備、機械、工具、用具等設施人人都得關心愛護,不得 損壞和丟失(包括業主方及相鄰單位的財物)。文明工地的設施人人都得關心愛護。對有意損壞公共財物者,賠償原物價值的200%。對不按操作規程操作、無意損壞者賠償其原物價值的50%。愛護公物、人人有責。
八、工地用電要注意安全,所有用電線路、電器均應由工地電工專人負責; 他人不得私自亂**接,否則引起一切不安全事故、機械損壞事故及傷亡事故,均由當事人自行負責及賠償。機械設備的操作應持證的專業人員操作,操作必須按照《機械操作規程》操作,他人不得隨意亂開亂動,否則后果自負。安全駕駛、文明操作。
九、工地所有員工必須樹立“安全第一”的思想,嚴格按照各項安全施工要 求執行操作,確保安全施工。堅持“預防為主,防消結合”的原則,杜絕火災隱患在施工現場發生。
十、進入施工現場的所有人員必須佩帶安全帽,嚴禁穿拖鞋及高跟鞋;嚴禁 從高空拋東西,高空作業必須系好安全帶。嚴格遵守《設備施工安全操作規程》,若有違章操作,所發生的一切不安全事故及傷亡事故,公司概不負責,其醫療費、護理費及誤工費等,均由本人自理。若在工地以外發生的一切不安全事故,其后果由本人負責自理,公司概不負責。高高興興上班,平平安安下班。
十一、工地所有員工應妥善保管好自己所攜帶的行李、物品。嚴禁在本工地、業主單位、相鄰單位及他人處盜竊財物或伙同外界人員盜竊本工地財物,若有發現,不問情由均處以1000元以上罰款或處以原價值二十倍以上罰款,情節嚴重者送交司法部門處理。遵紀守法、做文明使者。
十二、工地應做到文明施工,要求同事之間禮貌用語,搞好自身衛生及環境衛 生,施工現場應經常保持衛生良好,施工機械設備及現場材料布置井井有條,做好工地面貌及個人面貌完全符合文明工地的標準。講文明禮貌、樹良好風氣。
十三、工地所有員工、各施工班組應保管、保養好其所用的一切財物,如有損 壞、丟失等應照價賠償。設備為我創效益、我為設備搞整潔。
十四、為了公司榮譽和職工利益、以上各條款,望廣大員工切實執行、嚴格遵 守,以充分體現:“我為人人、人人為我”的精神!預祝師傅們圓滿完成本次安裝任務
為了認真貫徹落實“安全第一,預防為主”的方針,切實加強安全生產和勞動保護工作,保障職工的安全和健康。
本工程的安全管理目標為:安全事故為零,創安全生產標準化管理達標工地。
(1)項目經理、班組長是項目施工安全生產第一責任人,應遵循認定的目標,認真貫徹執行國家和政府部門的安全生產方針、政策、法規和上級指示,結合企業實情制訂各項制度,貫徹各項措施,并檢查執行情況。
(2)項目經理、班組長對所負責的施工項目,負有安全生產直接責任,不違 章指揮冒險作業。
(3)根據新的標準規范和安全管理目標,齊全各項施工生產的安全措施,遇 到生產與安全發生矛盾時,堅持生產服從安全的原則。
施工負責人要制定設備安裝計劃,每天要總結當天任務完成情況,制定明天的工作安排,施工順序考慮要細致,工具及材料準備要充分。
安全帽 絕緣鞋 安全帶 手套等安全設備
第四篇:單位安裝電話申請書
單位安裝電話申請書
單位安裝電話申請書一:單位安裝電話申請書
某某電信公司:
我公司因工作需要,現需安裝一部固定電話機,請貴公司安排有關工作人員前來安裝為盼。地址:*** 聯系人:** 聯系電話:***
**公司
日期:**
>單位安裝電話申請書二:單位安裝電話申請書>>(60字)
**電信公司:
我公司因工作需要,需安裝一門電話,裝機地址****,聯系人:****
懇請辦理為謝。
**公司(加蓋公章)
日期
>單位安裝電話申請書三:單位安裝電話申請書>>(139字)
關于安裝辦公用電話的請示(標題居中)
XXXX單位(或部門名稱,頂格寫):
由于辦公需要……(盡量寫明安裝電話的必要性和急迫性,比如業務快速發展,電話聯系增多,原有電話不能滿足現在的工作需要,等等),急需安裝辦公電話一部(或幾部)。
望盡快批準辦理為盼。
XXXX部門
二Q一二年X月X日
第五篇:木門窗現場安裝工藝流程
現場安裝工藝流程
一、進場材料檢驗
1、門部分:門框、門扇:成品無損壞,數量無誤。
2、配件部分:合頁、天地插: 按照送貨清單清點數量。
3、門鎖部分:門鎖把手、鎖體、鑰匙、鎖心、門鎖螺絲。
4、安裝材料及配件:合頁螺絲、門框螺絲、固定片螺絲、小鐵釘、射釘(膠粒螺絲釘)門框固定片、密縫膠條、扇底膠條、門檻膠條。
5、安裝工具:電鉆電錘、水平儀、鐵錘、螺絲刀(十字和平口)、鑿刀(10mm)、卷尺(5m)、電纜線。
6、修補材料部分:水性膩子、底漆、面漆、色漆、砂紙(標號)、修補毛筆、碎布條。
二、門框門扇的安裝位置對應圖紙對號入座,搬運歸類
在搬運過程中,要輕拿輕放。在擺放門扇的時候,門扇合頁位朝下,靠墻壁擺放(扇與扇之間應用紙皮或海綿隔墊)。拆裝門框平放地面(底層用木條墊起至少與地面保持50mm),避免直立擺放,以免碰倒摔壞。整裝門框把未做油漆面朝下擺放靠墻即可(底層用木條墊起至少與地面保持50mm)。
三、門框的組裝、安裝
1、準備工作
①、確認門的開啟方向、安裝垂直中心的確認,測量
門洞的大小。
②、工具:電鉆(電錘)、水平儀、門框固定片、門
框固定螺絲(射釘、膠塞)、膨脹膠、三角木屑(規
格)、小鐵釘(規格)、鐵錘。
2、門框組裝,必須按照門框圖紙內徑尺寸組裝,上下內空
大小一樣,接頭處打白乳膠(拆裝的門框),加固定自攻釘(50mm),保證門框的牢固性。
3、門框安裝
①、安裝門框固定片,固定片通常間隔350mm~400mm一個,固定片兩端固定面必須大于墻面50mm固定,才能保證門框牢固受力(墻垛為混凝土結構:用射釘槍,墻垛為磚結構或加氣磚必須用膠塞固定)。②、安裝前確認門的開啟方向和高度水平線和開啟角度,待甲方確定后方可進行安裝。
內開:A、開啟180度;門框放入門洞后,門框靠平室內墻壁安裝。
B、開啟90度;門框放入門洞后,門框靠門洞墻壁的中間位置安裝(需確認)。
外開:A、開啟180度,門框放入門洞后,門框靠平室外墻壁安裝。
B、開啟90度,門框放入門洞后,門框靠門洞墻壁的中間位置安裝(需確認)。
③ 門框放入門洞,并用三角木屑找中心位,用水平尺校正門框的水平度,垂直度,縫隙均勻。水平度以下框為基準(完成面即1米線),垂直度以邊框為基準,直角度以對角線為基準。確認無誤后射釘(膠粒螺絲釘)固定。附:若墻壁是混泥土,用30mm的射釘。若墻壁是水泥磚,用40mm的膠塞螺絲。若墻壁是空心磚,用50mm的膠塞螺絲。
④ 在門框和門洞之間的縫隙里填充發泡膠(聚氨酯泡沫填充劑)。在使用前用力搖1分鐘以上。打發泡膠要把握好力道和移動的速度,以免導致多打或漏打。膨脹出縫隙之外的發泡膠,過5-10分鐘表干之后,用手按進縫隙里面(膠面平滑)。
四、門扇的安裝,裝合頁,按合頁位安裝
合頁擺放要統一。打合頁位螺絲:若是在木質比較硬,螺絲不好打進,可用3mm鉆頭引孔。電鉆鎖螺絲時,擺正壓緊電鉆打,防止螺帽打圓頭和螺帽高出合頁面。(門扇膠條與門寬截斷,用小鐵釘固定在門厚的分中位置)
五、門鎖的安裝
對照門鎖的安裝說明書進行安裝,做好成品保護。
六、門縫的調節
常規情況下門扇合頁位靠門框的縫隙是4mm,門鎖的縫隙是6mm。若是現場變更或別的因素導致門縫不在常規縫隙,確保門縫均勻。(南方地區門縫預留5mm,北方預留3mm)門扇開啟流暢:門扇開啟到任何一個角度,門是保持著定位的狀態。門鎖開關無異樣:門關閉之后鎖舌開關不碰撞,兩扇門在一條平行線(雙開門)。
七、門的衛生清理,掉油漆,損壞的維修,成品的保護
1、對安裝好的門進行清掃檢查,掉油漆、碰壞的門上顏色、補木灰、砂紙打磨進行修補。
2、門鎖把手可用珍珠棉、薄膜包裝好,以免碰壞。
3、現場所造成的垃圾,清理到垃圾堆。鎖好門,將鑰匙移
交給甲方工程部或總包。