第一篇:鋼筋混凝土心得體會(huì)
學(xué)習(xí)《鋼筋混凝土基本理論》的心得體會(huì)
《鋼筋混凝土基本理論》是學(xué)期我們土木工程本開設(shè)的基本專業(yè)課之一。經(jīng)過三個(gè)星期的學(xué)習(xí),對于鋼筋混凝土這種最常見的建筑材料,它的發(fā)展過程與發(fā)展趨勢、理論研究成果、力學(xué)性能等方面,我也算是有一些膚淺的了解了。
混凝土結(jié)構(gòu)是以混凝土作為主要的建筑材料的構(gòu)件,包括素混凝土、鋼筋混凝土以及預(yù)應(yīng)力混凝土結(jié)構(gòu)。鋼筋混凝土結(jié)合了混凝土抗壓強(qiáng)度高以及鋼筋抗拉強(qiáng)度大這兩大有點(diǎn),大大改進(jìn)了材料的受力性能以及破壞性質(zhì)。材料的變化與革新都會(huì)帶來一場革命,鋼筋混凝土材料使得建筑建設(shè)發(fā)生驚天動(dòng)地的變化,也為人類建筑文明的前進(jìn)帶來無盡的活力。
科技的進(jìn)步是與時(shí)俱進(jìn)的,材料也一樣。像混凝土,人們致力于研究高強(qiáng)、輕質(zhì)、耐久、抗裂性能好、易成型;因?yàn)闀r(shí)代要求更好的更多動(dòng)能混凝土;在鋼筋方面,人們也在研發(fā)鋼筋的高強(qiáng)輕質(zhì)、延性好、低松弛、防腐等優(yōu)勢,我們學(xué)習(xí)土建的學(xué)生應(yīng)該時(shí)刻關(guān)注這些最新的科學(xué)的研究成果,在以后的學(xué)習(xí)和工作中打下堅(jiān)實(shí)的基礎(chǔ)。
鋼筋混凝土雖然在實(shí)際應(yīng)用中已經(jīng)大放異彩,但是我們必須從最根本的方面著手,一步步掌握:比如它在實(shí)際運(yùn)用中受力與破壞的優(yōu)缺點(diǎn),工程中的改進(jìn)措施等,都是要我們在實(shí)際應(yīng)用里一點(diǎn)點(diǎn)摸索與吸取教訓(xùn)獲取的經(jīng)驗(yàn)知識。
鋼筋混凝土是一種復(fù)合材料,了解它就必須先了解鋼筋和混凝土。鋼筋的形式和品種、力學(xué)性能(尤其是應(yīng)以應(yīng)變曲線的各個(gè)階段
和特點(diǎn)以及對應(yīng)的應(yīng)力值)、冷加工和熱處理、蠕變松弛疲勞等特性都有一個(gè)大致的了解;另外,對于混凝土的強(qiáng)度、荷載作用下的變形性能、徐變和收縮等結(jié)構(gòu)特點(diǎn),我們也應(yīng)懂得。只有懂得材料的土建工作者,才能用好材料,才能建造出美觀、實(shí)用、堅(jiān)固的建筑;也只有在實(shí)際工作中,我們才能檢驗(yàn)理論的正確與否。
鋼筋混凝土的構(gòu)造規(guī)定主要由三個(gè)方面:混凝土保護(hù)層的厚度,鋼筋的錨固長度,縱向鋼筋最小配筋率。老師一再要求我們必須切記這三個(gè)要求,不管是現(xiàn)在學(xué)習(xí)還是以后工作。老師講的很詳細(xì),因?yàn)榻Y(jié)構(gòu)的堅(jiān)固就是材料的應(yīng)用是否得當(dāng),而一座建筑最基本就是結(jié)構(gòu)是否牢固,所以這些基礎(chǔ)的知識,我們應(yīng)該牢牢掌握,這不僅僅是對自己負(fù)責(zé),更是對以后工作的業(yè)主與公司,甚至社會(huì)負(fù)責(zé)。
老師講的很慢,也很生動(dòng);在開發(fā)我們思維方式上更是不錯(cuò),因?yàn)槲覀兙窒抻诮淌遥瑹o法在實(shí)際建筑工地里切身體會(huì)。所以老師說思維一定要發(fā)散,而且還建議我們應(yīng)該多一些去工地,哪怕只是感性的認(rèn)識也是不錯(cuò)的。
《鋼筋混凝土基本理論》是我至關(guān)重要的課程,也是我們學(xué)習(xí)土建學(xué)生的最基礎(chǔ)的課程,因此我要端正自己的態(tài)度,扎實(shí)地學(xué)習(xí),虛心請教。這也應(yīng)該該是我們每一個(gè)土木人應(yīng)該有的知識基礎(chǔ),良心責(zé)任。
第二篇:淺談鋼筋混凝土框架結(jié)構(gòu)設(shè)計(jì)的心得體會(huì)
淺談鋼筋混凝土框架結(jié)構(gòu)設(shè)計(jì)的心得體會(huì)
[摘要]在鋼筋混凝土結(jié)構(gòu)設(shè)計(jì)中,由于每個(gè)設(shè)計(jì)者的經(jīng)驗(yàn)不同、對規(guī)范的理解不同,因而在處理某個(gè)設(shè)計(jì)問題時(shí),也就會(huì)采取不同的處理方法。文章對鋼筋混凝土框架結(jié)構(gòu)設(shè)計(jì)中,基礎(chǔ)、梁、柱、板四部分應(yīng)注意的問題,分別提出若干看法。
[關(guān)鍵詞]鋼筋混凝土結(jié)構(gòu)設(shè)計(jì);基礎(chǔ);梁;柱;板
[作者簡介]劉平湘,南寧市建筑設(shè)計(jì)院助理工程師,研究方向:結(jié)構(gòu)工程,廣西南寧, 530022
[中圖分類號] TU375 [文獻(xiàn)標(biāo)識碼] A [文章編號] 1007-7723(2010)05-0111-0002
近年來越來越多的建筑物使用鋼筋混凝土結(jié)構(gòu),故鋼筋混凝土結(jié)構(gòu)在整個(gè)建筑市場的地位越來越重要。在鋼筋混凝土結(jié)構(gòu)設(shè)計(jì)中,由于每個(gè)設(shè)計(jì)者的經(jīng)驗(yàn)不同、對規(guī)范的理解不同,所以在處理某個(gè)設(shè)計(jì)問題時(shí),也就會(huì)采取不同的處理方法。在這幾年的結(jié)構(gòu)設(shè)計(jì)實(shí)踐工作中,筆者積累了一些經(jīng)驗(yàn),下面就鋼筋混凝土框架結(jié)構(gòu)設(shè)計(jì)中的基礎(chǔ)、梁、柱、板四部分,在設(shè)計(jì)時(shí)應(yīng)注意的問題,闡述一下個(gè)人觀點(diǎn)。
一、基礎(chǔ)部分
1.對于柱下擴(kuò)展基礎(chǔ)寬度較寬(大于4m)或地基不均勻及地基較軟時(shí)宜采用柱下條基;并應(yīng)考慮節(jié)點(diǎn)處基礎(chǔ)底面積雙向重復(fù)使用的不利因素,適當(dāng)加寬基礎(chǔ)。
2.建筑地段較好、基礎(chǔ)埋深大于3m時(shí),應(yīng)建議甲方做地下室。當(dāng)?shù)鼗休d力滿足設(shè)計(jì)要求時(shí),地下室底板可不再外伸以利于防水。每隔30~40m設(shè)一后澆帶,并注明兩個(gè)月后用微膨脹混凝土澆注。設(shè)置地下室可降低地基的附加應(yīng)力,提高地基的承載力(尤其是在周圍有建筑時(shí)有用),減少地震作用對上部結(jié)構(gòu)的影響。不應(yīng)設(shè)局部地下室,且地下室應(yīng)有相同的埋深。
3.地下室外墻為混凝土?xí)r,相應(yīng)的樓層處梁和基礎(chǔ)梁可取消。
4.抗震縫、伸縮縫在地面以下可不設(shè),連接處應(yīng)加強(qiáng);但沉降縫兩側(cè)墻體基礎(chǔ)一定要分開。
5.新建建筑物基礎(chǔ)不宜深于周圍已有基礎(chǔ)。如深于原有基礎(chǔ),其基礎(chǔ)間的凈距應(yīng)不少于基礎(chǔ)高差的2倍;否則應(yīng)打抗滑移樁,防止原有建筑的破壞。建筑層數(shù)相差較大時(shí),應(yīng)在層數(shù)較低的基礎(chǔ)方格中心的區(qū)域內(nèi)墊焦碴來調(diào)整基底附加應(yīng)力。
6.獨(dú)立基礎(chǔ)偏心不能過大,必要時(shí)可與相近的基礎(chǔ)做成柱下條基。兩根柱的柱下條基的荷載重心和基礎(chǔ)底版的形心宜重合,基礎(chǔ)底板可做成梯形或臺(tái)階形,或調(diào)整挑梁兩端的出挑長度。
7.獨(dú)立基礎(chǔ)的拉梁宜通長配筋。拉梁頂標(biāo)高宜較高,否則底層墻體過高。
8.底層內(nèi)隔墻一般不用做基礎(chǔ),可將地面的混凝土墊層局部加厚。
9.基礎(chǔ)底板混凝土不宜大于C3O,一是沒用;二是容易出現(xiàn)裂縫。
二、柱子部分
1.地上為圓柱時(shí),地下部分應(yīng)改為方柱,方便施工。圓柱縱筋根數(shù)最少為8根,箍筋用螺旋箍,并注明端部應(yīng)有一圈半的水平段。方柱箍筋應(yīng)使用井字箍,并按規(guī)范加密。角柱、樓梯間柱應(yīng)增大縱筋并全柱高加密箍筋。幼兒園不宜用方柱。
2.原則上柱的縱筋宜大直徑、大間距,但間距不宜大于200。
3.柱內(nèi)埋管,由于梁的縱筋錨入柱內(nèi),一般情況下僅在柱的四角才有條件埋設(shè)較粗的管。管截面面積占柱截面4%以下時(shí),可不必驗(yàn)算。柱內(nèi)不得穿暖氣管。
4.柱斷面不宜小于450×450,混凝土不宜小于C25,否則梁縱筋錨入柱內(nèi)的水平段不容易滿足0.45La的要求,不滿足時(shí)應(yīng)加橫筋;否則在梁柱節(jié)點(diǎn)處鋼筋太密,混凝土澆筑困難。異型柱結(jié)構(gòu),梁縱筋一排根數(shù)不宜過多,柱端部縱筋不宜過密,否則節(jié)點(diǎn)混凝土澆筑困難。當(dāng)有部分矩形柱部分異型柱時(shí),應(yīng)注意異型柱的剛度要和矩形柱相接近,不要相差太大。
5.柱應(yīng)盡量采用高強(qiáng)度混凝土來滿足軸壓比的限制,減小斷面尺寸。
6.盡量避免短柱,短柱箍筋應(yīng)全高加密,短柱縱筋不宜過大。
7.考慮到豎向地震作用,柱子的軸壓比及配筋宜留有余地。
三、梁部分
1.梁上有次梁處(包括挑梁端部)應(yīng)附加箍筋和吊筋,宜優(yōu)先采用附加箍筋。附加筋一般要有,但不應(yīng)絕對。規(guī)范說得清楚,位于梁下部或梁截面高度范圍內(nèi)的集中荷載,應(yīng)全部由附加橫向鋼筋承擔(dān)。也就是說,位于梁上的集中力如梁上柱、梁上后做的梁如水箱下的墊梁不必加附加筋。位于梁下部的集中力應(yīng)加附加筋。但梁截面高度范圍內(nèi)的集中荷載可根據(jù)具體情況而定。當(dāng)主次梁截面相差不大,次梁荷載較大時(shí),應(yīng)加附加筋。當(dāng)主梁高度很高、次梁截面很小、荷載很小時(shí),如快接近板上附加暗梁,主梁可不加附加筋。還有當(dāng)主次梁截面均很大,如工藝要求形成的主次深梁,而荷載相對不大,主梁也可不加附加筋。
2.當(dāng)外部梁跨度相差不大時(shí),梁高宜等高,尤其是外部的框架梁。當(dāng)梁底距外窗頂尺寸較小時(shí),宜加大梁高做至窗頂。梁也可偏出柱邊一較小尺寸。梁與柱的偏心可大于1/4柱寬,并宜小于1/3柱寬。
3.梁上有次梁時(shí),應(yīng)避免次梁搭接在主梁的支座附近;否則應(yīng)考慮由次梁引起的主梁抗扭,或增加構(gòu)造抗扭縱筋和箍筋。當(dāng)采用現(xiàn)澆板時(shí),抗扭問題并不嚴(yán)重。
4.原則上梁縱筋宜小直徑、小間距,有利于抗裂;但應(yīng)注意鋼筋間距要滿足要求,并與梁的斷面相應(yīng)。箍筋按規(guī)定在梁端頭加密。布筋時(shí)應(yīng)將縱筋等距,箍筋肢距可不等。小斷面的連續(xù)梁或框架梁,上、下縱筋均應(yīng)采用同直徑的,盡量不在支座搭接。
5.端部與框架梁相交或彈性支承在墻體上的次梁,梁端支座可按簡支考慮,但梁端箍筋應(yīng)加密。
6.挑梁宜作成等截面(大挑梁外露者除外)。與挑板不同,挑梁的自重占總荷載的比例很小,作成變截面不能有效減輕自重。變截面挑梁的箍筋,每個(gè)都不一樣,難以施工。變截面梁的撓度也要大于等截面梁。挑梁端部有次梁時(shí),注意要附加箍筋或吊筋。一般挑梁根部不必附加斜筋,除非受剪承載力不足。對于大挑梁,梁的下部宜配置受壓鋼筋以減小撓度。挑梁配筋應(yīng)留有余地。
7.梁上開洞時(shí),不但要計(jì)算洞口加筋,更應(yīng)驗(yàn)算梁洞口下偏拉部分的裂縫寬度。梁從構(gòu)造上能保證不發(fā)生沖切破壞和斜截面受彎破壞。
8.挑梁出挑長度小于梁高時(shí),應(yīng)按牛腿計(jì)算或按深梁構(gòu)造配筋。
9.扁梁寬度不必過大,只要鋼筋能正常擺下及受剪滿足即可。因?yàn)樵趽隙扔?jì)算時(shí),梁寬對剛度影響不大。相對來講,增大鋼筋更經(jīng)濟(jì)。同時(shí)梁的上筋應(yīng)大部分通長布置,以減小混凝土徐變對撓度的增大。
10.梁寬大于350時(shí),應(yīng)采用四肢箍。
四、現(xiàn)澆板部分
1.板的鋼筋宜采用大直徑、大間距,但間距不大于200,間距盡量用200(一般跨度小于6.6m的板的裂縫均可滿足要求)。板上下鋼筋間距宜相等,直徑可不同,但鋼筋直徑類型也不宜過多。
2.相連幾個(gè)房間的同型號、同間距板底鋼筋宜連通。
3.配筋計(jì)算時(shí),可考慮塑性內(nèi)力重分布,將板上筋乘以0.8~0.9的折減系數(shù),將板下筋乘以1.1~1.2的放大系數(shù)。
4.支承在外圈框架梁上的板負(fù)筋不宜過大,否則將對梁產(chǎn)生過大的附加扭距。一般來說,板厚>150時(shí)采用 φ10@200;否則用 φ8@200。
5.當(dāng)厚板與薄板相接時(shí),薄板支座按固定端考慮是適當(dāng)?shù)?但厚板就不合適,宜減小厚板支座配筋,增大跨中配筋。
五、結(jié)語
以上是筆者在這幾年設(shè)計(jì)工作實(shí)踐中關(guān)于鋼筋混凝土框架結(jié)構(gòu)設(shè)計(jì)的幾點(diǎn)心得體會(huì),僅供設(shè)計(jì)人員和施工人員參考。“百年大計(jì)、質(zhì)量第一”不是一句空號。這不但要求廣大設(shè)計(jì)、管理、施工和技術(shù)人員有對國家和人民極端負(fù)責(zé)的態(tài)度和獻(xiàn)身精神,而且要求他們有能勝任工作的業(yè)務(wù)水平。
[參考文獻(xiàn)]
[1]混凝土結(jié)構(gòu)設(shè)計(jì)規(guī)范(GB 50010-2002)[S].[2]建筑抗震設(shè)計(jì)規(guī)范(GB 50011-2001)[S].[3]高層建筑混凝土結(jié)構(gòu)技術(shù)規(guī)程(JGJ3-2002)[S].
第三篇:鋼筋混凝土框架結(jié)構(gòu)設(shè)計(jì)的幾點(diǎn)心得體會(huì)
鋼筋混凝土框架結(jié)構(gòu)設(shè)計(jì)的幾點(diǎn)心得體會(huì)
張永濤 姬廣東
(山東省冶金設(shè)計(jì)院有限責(zé)任公司 萊蕪 271104)
摘要:在鋼筋混凝土結(jié)構(gòu)設(shè)計(jì)中,每個(gè)設(shè)計(jì)者的經(jīng)驗(yàn)不同,對規(guī)范的理解不同,所以在處理某個(gè)設(shè)計(jì)問題時(shí),也就會(huì)采取不同的處理方法。對于鋼筋混凝土框架結(jié)構(gòu)設(shè)計(jì)中,基礎(chǔ)、梁、柱、板四部分應(yīng)注意的問題,分別提出了幾點(diǎn)看法。關(guān)鍵詞:結(jié)構(gòu)設(shè)計(jì)基礎(chǔ)梁柱板
現(xiàn)在越來越多的建筑物使用鋼筋混凝土結(jié)構(gòu),故鋼筋混凝土結(jié)構(gòu)在整個(gè)建筑市場起到越來越重要的地位。在鋼筋混凝土結(jié)構(gòu)設(shè)計(jì)中,每個(gè)設(shè)計(jì)者的經(jīng)驗(yàn)不同,對規(guī)范的理解不同,所以在處理某個(gè)設(shè)計(jì)問題時(shí),也就會(huì)采取不同的處理方法。在這十年的結(jié)構(gòu)設(shè)計(jì)工作中,本人也積累了一些經(jīng)驗(yàn),下面就鋼筋混凝土框架結(jié)構(gòu)設(shè)計(jì)中的基礎(chǔ)、梁、柱、板四部分,在設(shè)計(jì)時(shí)應(yīng)注意的問題,闡述一下個(gè)人觀點(diǎn)。1.基礎(chǔ)部分
1.1對于柱下擴(kuò)展基礎(chǔ)寬度較寬(大于4米)或地基不均勻及地基較軟時(shí)宜采用柱下條基。并應(yīng)考慮節(jié)點(diǎn)處基礎(chǔ)底面積雙向重復(fù)使用的不利因素,適當(dāng)加寬基礎(chǔ)。
1.2建筑地段較好,基礎(chǔ)埋深大于3米時(shí),應(yīng)建議甲方做地下室。當(dāng)?shù)鼗休d力滿足設(shè)計(jì)要求時(shí),地下室底板可不再外伸以利于防水。每隔30~40米設(shè)一后澆帶,并注明兩個(gè)月后用微膨脹混凝土澆注。設(shè)置地下室可降低地基的附加應(yīng)力,提高地基的承載力(尤其是在周圍有建筑時(shí)有用),減少地震作用對上部結(jié)構(gòu)的影響。不應(yīng)設(shè)局部地下室,且地下室應(yīng)有相同的埋深。
1.3地下室外墻為混凝土?xí)r,相應(yīng)的樓層處梁和基礎(chǔ)梁可取消。1.4抗震縫、伸縮縫在地面以下可不設(shè),連接處應(yīng)加強(qiáng)。但沉降縫兩側(cè)墻體基礎(chǔ)一定要分開。
1.5新建建筑物基礎(chǔ)不宜深于周圍已有基礎(chǔ)。如深于原有基礎(chǔ),其基礎(chǔ)間的凈距應(yīng)不少于基礎(chǔ)高差的2倍,否則應(yīng)打抗滑移樁,防止原有建筑的破壞。建筑層數(shù)相差較大時(shí),應(yīng)在層數(shù)較低的基礎(chǔ)方格中心的區(qū)域內(nèi)墊焦碴來調(diào)整基底附加應(yīng)力。
1.6獨(dú)立基礎(chǔ)偏心不能過大,必要時(shí)可與相近的基礎(chǔ)做成柱下條基。柱下條形基礎(chǔ)的底板偏心不能過大,必要時(shí)可作成三面支承一面自由板(類似筏基中間開
洞)。兩根柱的柱下條基的荷載重心和基礎(chǔ)底版的形心宜重合,基礎(chǔ)底板可做成梯形或臺(tái)階形,或調(diào)整挑梁兩端的出挑長度。
1.7獨(dú)立基礎(chǔ)的拉梁宜通長配筋,其下應(yīng)墊焦碴。拉梁頂標(biāo)高宜較高,否則底層墻體過高。
1.8底層內(nèi)隔墻一般不用做基礎(chǔ),可將地面的混凝土墊層局部加厚。1.9考慮到一般建筑沉降為鍋底形,結(jié)構(gòu)的整體彎曲和上部結(jié)構(gòu)與基礎(chǔ)的協(xié)同作用,頂、底板鋼筋應(yīng)拉通(多層的負(fù)筋可截?cái)?/2或1/3),且縱向基礎(chǔ)梁的底筋也應(yīng)拉通。
1.10基礎(chǔ)底板混凝土不宜大于C3O,一是沒用,二是容易出現(xiàn)裂縫。1.11基礎(chǔ)底面積不應(yīng)因地震附加力而過分加大,否則地震下安全了而常規(guī)情況下反而沉降差異較大,本末倒置。免費(fèi)論文下載中心 2.柱部分
2.1地上為圓柱時(shí),地下部分應(yīng)改為方柱,方便施工。圓柱縱筋根數(shù)最少為8根,箍筋用螺旋箍,并注明端部應(yīng)有一圈半的水平段。方柱箍筋應(yīng)使用井字箍,并按規(guī)范加密。角柱、樓梯間柱應(yīng)增大縱筋并全柱高加密箍筋。幼兒園不宜用方柱。2.2原則上柱的縱筋宜大直徑大間距,但間距不宜大于200。
2.3柱內(nèi)埋管,由于梁的縱筋錨入柱內(nèi),一般情況下僅在柱的四角才有條件埋設(shè)較粗的管。管截面面積占柱截面4%以下時(shí),可不必驗(yàn)算。柱內(nèi)不得穿暖氣管。2.4柱斷面不宜小于450×450,混凝土不宜小于C25,否則梁縱筋錨入柱內(nèi)的水平段不容易滿足0.45La的要求,不滿足時(shí)應(yīng)加橫筋;否則在梁柱節(jié)點(diǎn)處鋼筋太密,混凝土澆筑困難。異型柱結(jié)構(gòu),梁縱筋一排根數(shù)不宜過多,柱端部縱筋不宜過密,否則節(jié)點(diǎn)混凝土澆筑困難。當(dāng)有部分矩形柱部分異型柱時(shí),應(yīng)注意異型柱的剛度要和矩形柱相接近,不要相差太大。
2.5柱應(yīng)盡量采用高強(qiáng)度混凝土來滿足軸壓比的限制,減小斷面尺寸。2.6盡量避免短柱,短柱箍筋應(yīng)全高加密,短柱縱筋不宜過大。2.7考慮到豎向地震作用,柱子的軸壓比及配筋宜留有余地。
2.8獨(dú)立柱上或柱的中部(半層處)有挑梁時(shí),挑梁長度應(yīng)有限制。3.梁部分
3.1梁上有次梁處(包括挑梁端部)應(yīng)附加箍筋和吊筋,宜優(yōu)先采用附加箍筋。附加筋一般要有,但不應(yīng)絕對。規(guī)范說的清楚,位于梁下部或梁截面高度范圍內(nèi)的集中荷載,應(yīng)全部由附加橫向鋼筋承擔(dān)。也就是說,位于梁上的集中力如梁上柱、梁上后做的梁如水箱下的墊梁不必加附加筋。位于梁下部的集中力應(yīng)加附加筋。但梁截面高度范圍內(nèi)的集中荷載可根據(jù)具體情況而定。當(dāng)主次梁截面相差不大,次梁荷載較大時(shí),應(yīng)加附加筋。當(dāng)主梁高度很高,次梁截面很小、荷載很小時(shí),如快接近板上附加暗梁,主梁可不加附加筋。還有當(dāng)主次梁截面均很大,如工藝要求形成的主次深梁,而荷載相對不大,主梁也可不加附加筋。
3.2當(dāng)外部梁跨度相差不大時(shí),梁高宜等高,尤其是外部的框架梁。當(dāng)梁底距外窗頂尺寸較小時(shí),宜加大梁高做至窗頂。外部框架梁盡量做成外皮與柱外皮平齊。梁也可偏出柱邊一較小尺寸。梁與柱的偏心可大于1/4柱寬,并宜小于1/3柱寬。
3.3梁上有次梁時(shí),應(yīng)避免次梁搭接在主梁的支座附近,否則應(yīng)考慮由次梁引起的主梁抗扭,或增加構(gòu)造抗扭縱筋和箍筋。當(dāng)采用現(xiàn)澆板時(shí),抗扭問題并不嚴(yán)重。
3.4原則上梁縱筋宜小直徑小間距,有利于抗裂,但應(yīng)注意鋼筋間距要滿足要求,并與梁的斷面相應(yīng)。箍筋按規(guī)定在梁端頭加密。布筋時(shí)應(yīng)將縱筋等距,箍筋肢距可不等。小斷面的連續(xù)梁或框架梁,上、下縱筋均應(yīng)采用同直徑的,盡量不在支座搭接。
3.5端部與框架梁相交或彈性支承在墻體上的次梁,梁端支座可按簡支考慮,但梁端箍筋應(yīng)加密。
3.6上反梁的板吊在梁底下,板荷載宜由箍筋承受,或適當(dāng)增大箍筋。梁支承偏心布置的墻時(shí)宜做下挑沿。
3.7挑梁宜作成等截面(大挑梁外露者除外)。與挑板不同,挑梁的自重占總荷載的比例很小,作成變截面不能有效減輕自重。變截面挑梁的箍筋,每個(gè)都不一樣,難以施工。變截面梁的撓度也大于等截面梁。挑梁端部有次梁時(shí),注意要附加箍筋或吊筋。一般挑梁根部不必附加斜筋,除非受剪承載力不足。對于大挑梁,梁的下部宜配置受壓鋼筋以減小撓度。挑梁配筋應(yīng)留有余地。免費(fèi)論文下載中心
3.8梁上開洞時(shí),不但要計(jì)算洞口加筋,更應(yīng)驗(yàn)算梁洞口下偏拉部分的裂縫寬度。梁從構(gòu)造上能保證不發(fā)生沖切破壞和斜截面受彎破壞。
3.9挑梁出挑長度小于梁高時(shí),應(yīng)按牛腿計(jì)算或按深梁構(gòu)造配筋。
3.10扁梁寬度不必過大,只要鋼筋能正常擺下及受剪滿足即可。因?yàn)樵趽隙扔?jì)算時(shí),梁寬對剛度影響不大,加寬一倍,撓度減小20%左右。相對來講,增大鋼筋更經(jīng)濟(jì),鋼筋加大一倍,撓度減小60%左右,同時(shí)梁的上筋應(yīng)大部分通長布置,以減小混凝土徐變對撓度的增大,如果上筋不小于下筋,撓度減小20%。3.11當(dāng)一寬框架梁托兩排間距較小的柱時(shí),可加一剛性挑梁,兩個(gè)柱支承在剛性挑梁的端頭。
3.12梁寬大于350時(shí),應(yīng)采用四肢箍。4.現(xiàn)澆板部分
4.1板的鋼筋宜采用大直徑大間距,但間距不大于200,間距盡量用200。(一般跨度小于6.6米的板的裂縫均可滿足要求)。板上下鋼筋間距宜相等,直徑可不同,但鋼筋直徑類型也不宜過多。
4.2相連幾個(gè)房間的同型號同間距板底鋼筋宜連通。
4.3配筋計(jì)算時(shí),可考慮塑性內(nèi)力重分布,將板上筋乘以0.8~0.9的折減系數(shù),將板下筋乘以1.1~1.2的放大系數(shù)。
——出處:《中國經(jīng)濟(jì)與管理科學(xué)》2009年第7期
Structure design of reinforced concrete frame
Zhang Yongtao Ji Guangdong(Shandong Province Metallurgical Design Institute Co., Ltd.Laiwu 271104)
Abstract: In the reinforced concrete structure design, each designer's experience is different, different understanding of norms, so in dealing with a certain design issues, it would take a different approach.For the design of reinforced concrete frame structure, foundations, beams, columns, boards should pay attention to the issue of four parts, respectively, made a few observations.Keywords: Structural design of foundation beam plate More and more buildings to use reinforced concrete structure, reinforced concrete structure and therefore the entire construction market play an increasingly important role.In the reinforced concrete structural design, each designer's experience is different, different understanding of norms, so in dealing with a certain design issues, it would take a different approach.In this decade, the structural design work, I have accumulated some experience, the following on the design of reinforced concrete frame structure, the foundation, beams, columns, panels of four parts in the design should pay attention to the problem, elaborate personal views.1.The fundamental elements of The expansion of the basis for the column width under a wide(greater than 4 meters)or the uneven ground and foundation should be adopted when compared with the soft base of the next column.And should consider the basis of node size at the end of a two-way repeated use of unfavorable factors, appropriate widening base.1.2 Building lot better basis for depth greater than 3 meters, should recommend to the Party to do the basement.Bearing capacity of the local base to meet the design requirements, the basement floor can be no overhang to facilitate water.Every 30 ~ 40 meters is located one after the pouring
zone, and indicate the two months after the pouring of concrete with micro-expansion.Setting the foundation of the basement can reduce the additional stress, improve the bearing capacity of foundations(especially in the construction around when useful)to reduce the role of the upper structure of the earthquake impact.Should not be any partial basement, and the basement should have the same depth.1.3 for the concrete basement wall, the corresponding floor beams and foundation beams at cancel.1.4 earthquake seam, expansion joints on the ground below may from time to set up, connections should be strengthened.However, the basis of settlement joint on both sides of the wall must be separated.The basis of 1.5 new buildings should not be darker than the surrounding existing basis.As deeply as the original foundation, based on the basis of inter-spacing of not less than 2 times the height difference, or to fight anti-sliding pile should be to prevent the destruction of the original building.Larger difference between the construction layers should be the basis of the lower layers within the region grid center ballast to adjust the base pad coke additional stress.1.6 Independence-based bias can not be too large, if necessary, the foundation made with similar articles under column base.Column strip foundation under the floor can not be too eccentric, if necessary, could be made on three sides, supporting one side of free(similar to the Raft-based intermediate open hole).Column 2 column article under the base load center of gravity and centroid-based bottom plate should overlap the foundation floor or stairs can be made into trapezoidal shape, or adjusting the length of cantilever beam at both ends of Chutiao.1.7 Independence-based pull-Liang Yi-length reinforcement, under which should focus ballast mat.Top elevation should pull high beam, or the bottom of the wall is too high.1.8 in the bottom wall generally do not have to do based on the concrete floor cushion can be partially thickened.1.9 Taking into account the general settlement of the bottom of the pot-shaped building, the structure of the overall bending and the upper structure and the basis of synergies, top and bottom reinforcement should be raton(multi-layer of negative reinforcement can be cut off 1 / 2 or 1 / 3), and the foundation beam bottom longitudinal reinforcement should also be raton.1.10 foundation slab of concrete should not be larger than C3O, one useless the second is prone to cracks.1.11 The foundation area should not unduly increase the earthquake additional force, otherwise the next earthquake safety, rather the contrary, the settlement, under normal circumstances are quite different cart before the horse.Reposted elsewhere in the paper for free download 2.Column part of the 2.1 on the ground for the cylinder, the underground portion should be replaced by square columns, to facilitate construction.Column longitudinal reinforcement root number at least 8, stirrup with spiral bands, and indicate the end of the horizontal segment should have a lap and a half.Square columns Tic-Tac-hoop stirrups should be used, in accordance with standard encryption.Corner column, stair column longitudinal reinforcement should be increased, and the whole column stirrups high encryption.Kindergarten should not use the square column.2.2 In principle, the vertical column reinforcement should large-diameter large spacing, but the pitch should not be larger than 200.2.3 Column pipe, due to the beam longitudinal reinforcement anchored into the column, the general only in the column under the conditions laid four corners have thick tube.Tube-sectional area of column cross section accounted for less than 4%, it can not checking.Column shall not clothing
trachea.2.4 column cross-section should not be less than 450 ??450, concrete should not be less than the C25, otherwise the beam longitudinal reinforcement anchored into the column level within the segment is not easy to satisfy the requirements of 0.45La, does not meet the horizontal bars should be added;otherwise reinforced beam-column nodes are too dense, concrete placement difficult.Special-shaped column structure, and beam longitudinal reinforcement should not be too much root number in a row and column longitudinal reinforcement ends should not be too dense, otherwise the node concrete placement difficult.When there is some part of the rectangular column-shaped columns, they should pay attention to special-shaped columns and rectangular column stiffness was similar and not that much difference.2.5 column should be using high-strength concrete to meet the axial load ratio limits, reduce the section size.2.6 try to avoid short columns, short columns stirrup should be full of high encryption, short column longitudinal reinforcement should not be too large.2.7 Taking into account the role of vertical earthquake, columns under axial compression ratio and reinforcement should leave some leeway.2.8 independent of the central column or columns(semi-floor office)are cantilever beam, the cantilever beam length should be limited.3.LIANG part of the 3.1 beam with sub-beam Department(including the cantilever beam ends)should be attached stirrups and hanging bars, should give priority to adopt additional stirrups.Additional tendons in general should be, but not absolute.A clear specification that is located in the lower beam or high beam within the scope of the concentrated load shall be borne entirely by additional transverse reinforcement.In other words, the concentration of power in the beam, such as beam columns, beams after the beam to do under
the pad-like water tanks do not have to add additional muscle.Is located in the lower beam of concentration should be added additional reinforcement.However, a high beam within the concentrated load can be determined according to specific circumstances.When the primary and secondary beam cross-section more or less, sub-beam load is large, additional reinforcement should be added.When the main beam at very high altitudes, sub-beam cross-section is very small, load is very small, such as the approach the board added the dark beam, main beam may from time to add additional muscle.There were significant when the primary and secondary beam, such as the process requires the formation of the primary and secondary deep beam, while the load is relatively small, the main beam or not to add additional muscle.3.2 when the external beam span or less, Liang Gao Yi high, especially outside the frame beam.When the beam away from the outer windows of the top end of small size, it is desirable to do to increase the beam window of a high top.As far as possible outside the framework of beams and columns made of skin skin flush.Liang-chu, may also be missed while a smaller size.Eccentric beam-column may be greater than 1 / 4 columns wide and appropriate less than 1 / 3 of column width.There are times when the beam 3.3 beam should avoid secondary beam overlap in the vicinity of the main beam of the bearing, otherwise, consideration should be given by the second torsion beam caused by the main beam, or increasing the longitudinal reinforcement and stirrup torsional structure.When using in-situ plate, the torsion problem is not serious.3.4 In principle, small-diameter beam longitudinal reinforcement should a small spacing is conducive to cracking, but it should be noted that reinforcement spacing to meet the requirements, and with the corresponding cross-section of beam.Stirrups at the end of the beam according to the provisions of the first encryption.Fabric reinforcement should be
equidistant longitudinal reinforcement, stirrups, etc.from time away from the limb.Small cross-section of a continuous beam or frame beams, the upper and lower longitudinal reinforcement should be using the same diameter as much as possible not to overlap bearings.3.5 end with the frame beams intersect, or elastic support at the wall on the sub-beams, simply supported beam end bearing may be considered, but the end of the beam stirrups should be encrypted.3.6 The panel of anti-beam suspended beneath the beam, plate load appropriate for the stirrups to bear, or an appropriate increase in stirrup.Eccentric arrangement of beams supporting the walls along the opportune time to do the next pick.3.7 pick Liang Yiross-section(large cantilever beam except those exposed).And pick a different panel to pick the beam weight ratio of the total load is small, ariable cross-section can not effectively reduce weight.Variable cross-section cantilever beam of the stirrups, each is different and difficult construction.Variable cross-section beam deflection is also greater than the other beam.Cantilever beam with secondary beam end, attention should be attached stirrups or hanging bars.Generally do not have to add the root of cantilever beam oblique muscle, unless the lack of shear strength.For large cantilever beam, the beam bottom reinforcement should configure the compression to reduce the deflection.Cantilever beam reinforcement should leave room for the.Reposted elsewhere in the paper for free download 3.8 beam openings, not only to calculate the hole reinforcement, hole should be checking under the partial pull-beam part of the crack width.Beams from the structure does not occur on the punching can guarantee the damage and oblique cross-section flexural damage.3.9 Chutiao cantilever beam is less than the length of beam is high, should be calculated or bracket structure reinforced by deep beams.3.10 flat-beam width not too large, as long as the steel can be placed
under the normal and shear can be met.Because the deflection calculation, the beam width on the stiffness had little impact broadening doubled, the deflection reduced about 20%.Relatively speaking, increasing the steel more economical, steel increased to double the deflection reduced about 60%, while the majority of the beam on the tendon to be a long-pass arrangement to reduce the deflection of concrete creep on the increase, if the tendon not less than under the ribs, deflection reduced by 20%.3.11 As a broad framework of the Beam smaller distance between two rows of columns, it can add a stiff cantilever beam, the two columns supported on rigid cantilever beam of the end of the first.3.12 beam large at the 350 should be used limbs hoop.4.Part Slab 4.1 The board should adopt the large-diameter steel big pitch, but the spacing is not greater than 200, the pitch as far as possible with the 200.(Usually span of less than 6.6 meters cracks in the board can meet requirements).Under the steel plate spacing should equal diameter can be different, but the bar diameter type is also not too much.4.2 connected to a few rooms at the end of the same model reinforced with the pitch plate should connect.4.3 reinforcement calculations, may consider plastic redistribution of internal force will be multiplied by 0.8 to 0.9 bars on-board the discount factor will be multiplied by the plate under the tendons of the amplification factor of 1.1 ~ 1.2.——From: Chinese Economy Management Science Magazine,2009.7
第四篇:鋼筋混凝土課程設(shè)計(jì)
鋼筋混凝土課程設(shè)計(jì)計(jì)算書
遼寧工程技術(shù)大學(xué)力學(xué)與工程學(xué)院
工程力學(xué)09—1 班
第四小組
目錄
一、設(shè)計(jì)資料..............................................................................3
二、結(jié)構(gòu)構(gòu)件選型......................................................................4
三、結(jié)構(gòu)計(jì)算..............................................................................4
四、荷載組合與內(nèi)力組合.........................................................17
五、柱、基礎(chǔ)的配筋計(jì)算.........................................................17
六、基礎(chǔ)設(shè)計(jì).............................................................................24
七、參考資料.............................................................................29
混凝土
結(jié)構(gòu)課程設(shè)計(jì)計(jì)算書
一、設(shè)計(jì)資料
(一)、設(shè)計(jì)題目:金工車間單跨廠房結(jié)構(gòu)設(shè)計(jì)。
(二)、設(shè)計(jì)條件:
1、工藝要求:本工程為某城市郊區(qū)某鑄造車間,工藝要求為一單跨單層廠房,跨度為27m,長度為102m,柱距6m,車間內(nèi)有15/3t 和30/5t 兩臺(tái)A5級工作制吊車,軌頂標(biāo)高10.2m。吊車的有關(guān)參數(shù)見下表 1-1。
2、工程地質(zhì)情況:天然地面下1.2m 處為褐黃色亞粘土老土層,作為基礎(chǔ)持力層,地基承載力設(shè)計(jì)值f=140kPa,初見地下水位在地面以下0.7m,(標(biāo)高-0.85m)。
3、地震設(shè)防烈度:無要求
4、建筑資料和荷載資料:
(1)屋面板采用預(yù)應(yīng)力混凝土大型屋面板,板重(包括灌縫在內(nèi))標(biāo)準(zhǔn)值 為 2kN/m2。
(2)天溝板板重標(biāo)準(zhǔn)值 2kN/m2。
(3)屋架采用預(yù)應(yīng)力混凝土折線形屋架,屋架自重標(biāo)準(zhǔn)值 109kN/榀。
(4)吊車梁采用先張法預(yù)應(yīng)力混凝土吊車梁,吊車梁高 1200mm,自重標(biāo)準(zhǔn)值 50kN/根,軌道及零件重1kN/m,軌道及墊層構(gòu)造高度 200mm。
(5)假設(shè)工業(yè)廠房用期50 年。阜新地區(qū)雪荷載標(biāo)準(zhǔn)值 0.4 KN/m
2、基本風(fēng)壓0.6 KN/m 2。
(6)設(shè)計(jì)任務(wù)排架柱及基礎(chǔ)材料選用情況
①柱
混凝土:采用C35,鋼筋:縱向受力鋼筋采用 HRB400級鋼筋,箍筋采用
HRB335級鋼筋。②基礎(chǔ)
混凝土:采用C25,鋼筋:采用HRB400級鋼筋。
(三)設(shè)計(jì)內(nèi)容:
1.確定縱橫定位軸線,上柱的高度及截面尺寸;下柱的截面尺寸;布置屋蓋支撐,柱及柱間支撐;
2.排架計(jì)算簡圖及進(jìn)行荷載計(jì)算;
3.排架內(nèi)力計(jì)算與內(nèi)力組合; 4.排架柱牛腿設(shè)計(jì);
5.排架柱截面的配筋計(jì)算; 6.預(yù)制柱下基礎(chǔ)設(shè)計(jì);
7.按照學(xué)校有關(guān)規(guī)定標(biāo)準(zhǔn)格式,用 8.繪制施工圖紙(1 #圖 紙一張)
(1)結(jié)構(gòu)布置圖(屋面板、屋蓋支撐布置、吊車梁、柱及柱間支撐、墻體布置)(2)基礎(chǔ)施工圖(基礎(chǔ)平面平面布置圖及基礎(chǔ)配筋圖)(3)柱施工圖
二、結(jié)構(gòu)構(gòu)件選型 :
結(jié)構(gòu)的名稱
屋面板
天溝板 天窗架 屋架
預(yù)應(yīng)力混凝土折線形屋
架 先張法預(yù)應(yīng)力混凝土吊
車梁 表 1.1 主要構(gòu)件選型
選取材料
預(yù)應(yīng)力混凝土大型屋面
板
重力荷載標(biāo)準(zhǔn)值 kN/m 2 kN/m 2 57 kN/ 榀 109 kN/ 榀
m 吊車梁高 1200m,自重標(biāo)
準(zhǔn)值 50 kN/ 根,軌道及零
件重 1 kN/m,軌道及墊層
構(gòu)造高度 200 mm。
A4 紙打印計(jì)算書一份。
吊車梁
吊車 噸位 /3t 30 /5t 吊車有關(guān)參數(shù)表 1-
起 重 吊 車 輪 距 最 大 輪 最 小 輪 起 重 機(jī) 小 車 總 車高
量寬 壓 壓 總重 K H
重 Q1
B(mm)
P
Pmin
max
(K(mm)(KN)(KN)(m)
(KN)N)(KN)
/ 5160 4100 148 33 215 66.1 29.4
294 / 6150 4800 290 70 118 107.8 2.734 49
三、結(jié)構(gòu)計(jì)算
(一)結(jié)構(gòu)計(jì)算簡圖(由于 A、B 柱的對稱性,所以以下計(jì)算過程以
1、排架柱的高度
、基礎(chǔ)的埋置深度及基礎(chǔ)高度:(1)
Q A 柱為例)
0.23 = 5.75 KN / m G = 25×根據(jù)柱的高度、吊車起重量及工作級別等條件,確定柱的截面尺寸,經(jīng)計(jì)算得截 面幾何特征,匯總見表。
柱截面尺寸及相應(yīng)的計(jì)算參數(shù)
表 2-
面積
mm 截面尺寸/ 2 慣性矩/ mm
/ mm
500 矩 500 ×
1000 × 150 × 10 I500 ×
0
2.5 × 10 2.3 ×計(jì)算參數(shù) 柱號
上柱
A,B
下柱)
自重/(kN/m
5.21 ×
6.25 5.75
3.141 ×
3、荷載計(jì)算(1)恒 載計(jì)算
a、屋蓋恒載標(biāo)準(zhǔn)值:
預(yù)應(yīng)力大型屋面板 天溝板 天窗架 屋架自重
則作用于橫向平面排架邊柱柱頂屋蓋結(jié)構(gòu)自重為: G1=(4*6*27/2+57+109/2)=435.5KN
uh
1-200 e
=
mm 作用在軸線的右側(cè)。計(jì)算偏心距 = 500/2 - 200=2
1M 1 A = M 1 B = G
1Ae
A =
435.5*0.05=21.775 KN.m KN m KN m 57 kN/ 榀
kN/ 榀
M 2 A = M 2 B = G 2 A e
2A =
435.5*0.25=108.875 KN.m b.柱自重標(biāo)準(zhǔn)值: 上柱 下柱
G2a=6.25*3.25=20.315KN G3a=5.75*7.75=44.563KN
2M 2 A = G 2 Ae
= 5.078 KN.m
、屋面活載(不上人屋面,取 0.70 KN m 大于屋面雪載 0.4 KN m)故(2)
Q
1A = Q1
B = 0.7*6*27/2=56.7 KN
M 1 A = Q e1
A = 2.835 KN.m
= 14.175 KN.m
2M 2 A = Q Ae A
(3)、吊車梁及軌道連接重力荷載 G 4 A = G 4 B(50+0.4*6)=52.4 KN M 4 A = M 4 A = 52.4*0.4=20.96 G 4 AeKN.m 吊車荷載
QA1 1 = B = 吊車的參數(shù): 吊車有關(guān)參數(shù)表 1-吊車 起 重
吊 車 輪 距
K
B
(mm)
最 大 輪 最 小 輪 起 重 機(jī) 小 車 總 車高
壓 P
max(KN)
壓 Pmin
(KN)70
(KN)
總重
重 Q
1(KN)
(m)H
量寬 Q 噸位
(K(mm)N)/5t
294 / 49 /3t
/ 29.4
5160
4100
6150
4800
290 118 107.8 2.734
33 215 66.1
可算出出吊車梁支座反力影響線中個(gè)輪壓對應(yīng)點(diǎn)的豎向坐標(biāo)值,如圖4所示:
圖4 吊車荷載作用下支座反力的影響線
(1)、吊車的豎向荷載
: 情況(a)
=0.9γ
pmax ∑ y i =0.9×(0.738+0.055)] Dmax
QF
1.4×
[290×
(1+0.2)+148 ×
=585.36 KN
i= 0.9 × 1.4×(1+0.2)+33 ×(0.738+0.055)] Dm in =0.9γ
Q F min ∑ y
[70 ×
=110.17 KN
: 情況(b)
pDm ax =0.9γ
QF max ∑ y i =0.9×
1.4×
[290×
(0.738-0.062)+148×
(1+0.317)]
=492.60 KN
1.4×(0.738-0.062)+33 ×(1+0.317)] Dmin
=0.9γ
Q F min ∑ yi=
0.9
×
[70 ×
=114.38 KN
(1)吊車的橫向荷載
水平剎車力: T1=1/4α β(水平剎車力: T2=1/4α β(× 0.12×
0.9×
(150+215)=9.855 KN Q2+g2)
= 4 × 0.12×
0.9×
(300+118)=11.286 KN Q1+g1)
= 4 吊車橫向荷載設(shè)計(jì)值: Tmax= γ
Q
∑ T ∑ yi
=1.4 × [11.286 × +(0.738+0.055)]
(1+0.2)9.855×
=29.83 KN
風(fēng)荷載(6)
6KN
/ m 2,對于城市地區(qū),風(fēng)壓高度變化系數(shù) μ z 阜新地區(qū)的基本風(fēng)壓 ω 0 = 0.按 B 類地區(qū)考慮高度取值。對 q
1,q 2 按柱頂標(biāo)高 10.2 m 考慮查得 μ z = 1。
風(fēng)荷載體型系數(shù)圖
風(fēng)壓高度變化系數(shù)參照荷載規(guī)范,并用插值法求出不同標(biāo)高時(shí)的系數(shù)。則風(fēng)壓高度變化系數(shù)如表
標(biāo)高(m)
∝ z
10.0 11.834 1.00
1.074 所示。
15.0 1.14
表 2 15.384 1.148
15.99 1.162
17.65 1.198
18.92 1.226 1.25
均布風(fēng)荷載如下表:(序號
z ω 0 l qi
= β z μ sμ)
β
Z
μZ
μs
ω0
q(KN/m)
方向 2 3 1 1
1.074 1.148 1.162
0.8 0.8 — 0.2
0.6 0.6 0.6
3.093 3.307 0.836
→
→
← 1 1.198 0.6 0.6 2.588
→ 1 1.226 — 0.7 — 0.7 — 0.6 — 0.6 — 0.5 — 0.5
0.6 3.090
← 7 8 1 1
1.226 1.198 1.162
0.6 0.6 0.6
3.090 2.588 2.509
←
→
→ 10 1
1.148 1.074
0.6 0.6
2.067 1.933
→
→
排架荷載總圖如圖
3.內(nèi) 力計(jì)算
恒載作用下的內(nèi)力(1)由于單層廠房多屬于裝配式結(jié)構(gòu),柱,吊車,梁及軌道的自重,是在預(yù)制柱吊裝 就位完畢而屋架尚未安裝時(shí)施加在柱子上的,此時(shí)尚未構(gòu)成排架結(jié)構(gòu)。但在設(shè)計(jì)
中,為了與其他荷載項(xiàng)計(jì)算方法一致,并考慮到使用過程的實(shí)際受力情況,在柱,吊車梁及軌道的自重作用下,仍按排架結(jié)構(gòu)進(jìn)行內(nèi)力計(jì)算。1)在 G1(屋架)作用下
A M 1 A = M 1 B = G1
Ae435.5*0.05=21.775 KN.m
= A M 2 A = M 2 B = G 2 A
0.244;
0.166
λ=
已知 n=,e 2
= 435.5*0.25=108.875 KN.m
則有:
λ 1 1? ? ? λ ? ? ? ? ? ? 1
=1.8164)2)活載作用下 1)屋面活荷載作用下的內(nèi)力
Q1 與 G1 作用位置相同,即成比例。則有: Q1 =56.7KN
R = R1
× Q1
G1= 2.678 KN
(→)M 1 = M 11 × Q1
G= 3.969 KN.m 1
M=Q1
2M 12 × G= 119.845K N.m
N1 =
Q1
= 56.7k N
屋面活載作用下的計(jì)算簡圖和內(nèi)力圖分別示于圖 9 和圖13
(10)吊車豎向活載作用下的內(nèi)力 ①最大輪壓作用于 A 柱時(shí) A 柱 B柱
M A
= D maxe
/ m= 585.36×
0.4= 234.144kN
0.4 = 44.068M B
= D min e= 110.17 ×kN
/ m
計(jì)算簡圖如圖 11 所示:
圖 11 吊車豎向荷載作用下的計(jì)算簡圖
與恒載計(jì)算方法相同,可得 A 柱 B柱
C3=
C2=
1.31467
M 4 A
RA
= C 3 = — 24.756(←)
H M 4 B
RB
= C 3 = 4.659(→)
H
A 柱與 B 柱相同,剪力分配系數(shù) ?A = ?B = 0.5,則 A 柱與 B 柱柱頂?shù)募袅Ψ謩e為
A 柱 VA = RA14.708kN
(←)B 柱 VB = RB2.1
+ λ 3 0.n C = =0.703 + λ.? ? ? 0? ? ? 1 1 + λ 3μ Am(RA + RB)
= 3.087k N(←)VB = RB1)n C = = 0.3557 8
λ 1 + 3C11q1H = 0.3557*3.09*12.434 =C11q2 H =0.3557?1.93?12.434=-2 7.361(←)
圖 14
排架單元結(jié)構(gòu)對稱,柱中的軸力為零,計(jì)算簡圖如圖 15 所示
μ = 0.5,則有: VA = R1 + ?(-R1R2 + W)= 10.839 ΚΝ
根據(jù)計(jì)算左來風(fēng)情況下的 M 圖如圖 16 的實(shí)線所示
四、荷載組合與內(nèi)力組合
排架單元結(jié)構(gòu)對稱,可僅考慮 組合。
A 柱的截面。具體情況見表 的匯總和表 4 的
表 3 —荷載匯總表
荷載匯總表
豎向吊車荷載 水平吊車荷載 最大輪壓作用于 水平力作用方向
A B 向左 向右 3 4 5 6
-44.62
-44.64
± 6.90
± 6.90
風(fēng)
左來風(fēng)
64.36 截面 內(nèi)力
恒載 1
活載 2
2.965
右來風(fēng)
-41.78
M
ⅠⅡ
N
-75.28-11.2 189.52 0.56 ± 14.50 ± 14.50 64.36-41.78
508.21 56.7 585.36 110.17 0 0 0 0
M 47.05 6.78 5.26-138.8-265.9 265.88 320.679-284.2
Ⅲ0.5h
+ aˊ
s =(mm)As
= A
ˊ)fˊ
y(h0
-aˊ、x < hˊ
f 時(shí),當(dāng) x > 2 aˊ
s = As
= A
εe
N(-0.5h
+ 0.5 x)2
(mm)
ˊ
y(h0ˊ)f
-a
i
1920.4
842.4
ρ min Ac
(mm)(一側(cè)縱向鋼筋)
500
3Φ
3Φ
2(2081)
460 Φ 16 2 Φ 18(911)一側(cè)被選受拉鋼筋及其面積(mm)
A 柱的上柱和下柱截面的配筋圖見下圖 4-
具體鋼筋的型號見施工圖 23
a / h0
< 0.3,可以不設(shè)彎起筋
@
按構(gòu)造要求布置水平箍 筋,取 φ12,上部 2 / 3h 100
03
? ? ? × 585 = 390mm 范圍內(nèi)水平箍筋
? ? ? 總面積為:
2 a / h0
= 160 / 575 = 0.278
< 0.3,可不設(shè)彎筋 滿足要求。A = 113.1×
390
> = 441.1 mm
As
763 = 381., 滿足要求 = 0.5× 5 mm
牛腿配筋圖見下圖。
4、柱的吊裝驗(yàn)算
柱子吊裝階段驗(yàn)算
荷載:包括上柱,牛腿和下柱的載荷。(1)上柱: 牛腿: 5×÷ 10 × 25 = 6.25(KN / m)
(22)×062 + 0.22)-(1
.0 + 0..0.0.22 ×
? ?? ? ??×
= 20.17
KN / m × 0.25 ÷ 0.6
..2
下柱: 3 × 10 ÷ 10 × 25 = 5.75 KN / m 6
自重:包括上柱,牛腿和下柱的自重。(2)
1.5 6.× 25
= 11.25 KN ? m 上柱自重: g 1 = 1.2 ×
1.20.17 = 36
×.30 KN ? m 牛腿自重: g 2 = 1.2 ×
KN ? m
1.× 5
×.75
= 10.35
下柱自重: g 3 = 1.2 彎矩:(3)M 1 = q1
×
Hu 2
= 11.25
×.034
= 51.78 KN / m
= [(5.5/ 2)-(1/ 2)-1.205]×4-[(4/ 2)-(0.5/ 2)-1.205]2 = 3.88m2
A2 =(bc + h0)h0 =(0.5+1.205)×1.205 = 2.05m2 Fl = pn,max A1 =105.34×3.88 = 408.12KN
0.6 f1 A2 = 0.6×1.27 ×2.05×103 =1562.1 >Fl(滿足要求)
(2)驗(yàn)算變階處沖切
bc =1.25m,ac =1.75m,h0 =0.905m
A1 = [(5.5/ 2)-(1.75/ 2)-0.905]×4ac)2(2b+ bc)=1/ 48×(105.34 +84.32)(5.5-1)2(2×4 +0.5)= 680.11KN / m ASΙ =(MΙ / 0.9h0 f y)=(680.11×10)/(0.9×1205×360)=1741.99
[]
mm2
(2)截面Ι′— Ι′ p′nΙ =88.21KN
MΙ′=1/ 48×(105.34 +88.21)(5.50.5)(2×5.5 +1)= 491.29
mm2
/((0
(h
×0
×120512
< AS ΙΙS
= M ΙΙ / [.= 1271.02 mm
0)×
360 ] = 1113.77.故配置 φ12@160
(mm)A
= 1357.2 S
參考文獻(xiàn)
⑴ 建筑結(jié)構(gòu)制圖標(biāo)準(zhǔn)(G B/T 50105-2001).北京 : 中國建筑工業(yè)出版社 ,2001 ⑵ 鋼筋混凝土結(jié)構(gòu)設(shè)計(jì)規(guī)范(GB50010-2002
.北京 : 中國建筑工業(yè)出版社 ,2002)⑶ 建筑荷載設(shè)計(jì)規(guī)范(GB50009-2001
.北京 : 中國建筑工業(yè)出版社 ,2002)⑷ 建筑地基基礎(chǔ)設(shè)計(jì)規(guī)范(GB50007-2002
.北京 : 中國建筑工業(yè)出版社 ,2002)⑸ 徐占發(fā)主編.建筑結(jié)構(gòu)與構(gòu)件設(shè)計(jì).北京 : 中國建材工業(yè)出版社 ,1996 ⑹ 蘇小卒主編.砌體結(jié)構(gòu)設(shè)計(jì).上海同濟(jì)大學(xué)出版社 ,2002
⑺ 沈蒲生主編.混凝土結(jié)構(gòu)設(shè)計(jì)原理.北京 : 高等教育出版社 ,2002
第五篇:鋼筋混凝土底板(本站推薦)
鋼筋混凝土底板、墻的鋼筋施工工藝標(biāo)準(zhǔn) 材料及主要機(jī)具:
1.1 鋼筋:應(yīng)有出廠合格證,按規(guī)定作力學(xué)性能復(fù)試。當(dāng)加工過程中發(fā)生脆斷等特殊情況,還需作化學(xué)成分檢驗(yàn)。鋼筋應(yīng)無老銹及油污。
1.2 鐵絲:可采用20~22號鐵絲(火燒絲)或鍍鋅鐵絲(鉛絲)。鐵絲的切斷長度要滿足使用要求。
1.3 控制混凝土保護(hù)層用的砂漿墊塊、塑料卡、各種掛鉤或撐桿等。1.4 工具:鋼筋鉤子、撬棍、扳子、綁扎架、鋼絲刷子、手推車、粉筆、尺子等。
作業(yè)條件:
2.1 按施工現(xiàn)場平面圖規(guī)定的位置,將鋼筋堆放場地進(jìn)行清理、平整。準(zhǔn)備好墊木,按鋼筋綁扎順序分類堆放,并將銹蝕進(jìn)行清理。
2.2 核對鋼筋的級別,型號、形狀、尺寸及數(shù)量是否與設(shè)計(jì)圖紙及加工配料單相同。
2.3 當(dāng)施工現(xiàn)場地下水位較高時(shí),必須有排水及降水措施。
2.4 熟悉圖紙,確定鋼筋穿插就位順序,并與有關(guān)工種作好配合工作,如支模、管線、防水施工與綁扎鋼筋的關(guān)系,確定施工方法,作好技術(shù)交底工作。3 工藝流程: 劃鋼筋位置線→運(yùn)鋼筋到使用部位→綁底板鋼筋→綁墻鋼筋
3.1 劃鋼筋位置線:按圖紙標(biāo)明的鋼筋間距,算出底板實(shí)際需用的鋼筋根數(shù),一般讓靠近底板模板邊的那根鋼筋離模板邊為5cm,在底板上彈出鋼筋位置線(包括基礎(chǔ)梁鋼筋位置線)。
3.2 綁基礎(chǔ)底板及基礎(chǔ)梁鋼筋
3.2.l 按彈出的鋼筋位置線,先鋪底板下層鋼筋。根據(jù)底板受力情況,決定下層鋼筋哪個(gè)方向鋼筋在下面,一般情況下先鋪短向鋼筋,再鋪長向鋼筋。3.2.2 鋼筋綁扎時(shí),靠近外圍兩行的相交點(diǎn)每點(diǎn)都綁扎,中間部分的相交點(diǎn)可相隔交錯(cuò)綁扎,雙向受力的鋼筋必須將鋼筋交叉點(diǎn)全部綁扎。如采用一面順扣應(yīng)交錯(cuò)變換方向,也可采用八字扣,但必須保證鋼筋不位移。
3.2.3 擺放底板混凝土保護(hù)層用砂漿墊塊,墊塊厚度等于保護(hù)層厚度,按每1m左右距離梅花型擺放。如基礎(chǔ)底板較厚或基礎(chǔ)梁及底板用鋼量較大,擺放距離可縮小,甚至砂漿墊塊可改用鐵塊代替。
3.2.4 底板如有基礎(chǔ)梁,可分段綁扎成型,然后安裝就位,或根據(jù)梁位置線就地綁扎成型。3.2.5 基礎(chǔ)底板采用雙層鋼筋時(shí),綁完下層鋼筋后,擺放鋼筋馬凳或鋼筋支架(間距以1m左右一個(gè)為宜),在馬凳上擺放縱橫兩個(gè)方向定位鋼筋,鋼筋上下次序及綁扣方法同底板下層鋼筋。
3.2.6 底板鋼筋如有綁扎接頭時(shí),鋼筋搭接長度及搭接位置應(yīng)符合施工規(guī)范要求,鋼筋搭接處應(yīng)用鐵絲在中心及兩端扎牢。如采用焊接接頭,除應(yīng)按焊接規(guī)程規(guī)定抽取試樣外,接頭位置也應(yīng)符合施工規(guī)范的規(guī)定。
3.2.7 由于基礎(chǔ)底板及基礎(chǔ)梁受力的特殊性,上下層鋼筋斷筋位置應(yīng)符合設(shè)計(jì)要求。
3.2.8 根據(jù)彈好的墻、柱位置線,將墻、柱伸入基礎(chǔ)的插筋綁扎牢固,插入基礎(chǔ)深度要符合設(shè)計(jì)要求,甩出長度不宜過長,其上端應(yīng)采取措施保證甩筋垂直,不歪斜、傾倒、變位。3.3 墻筋綁扎:
3.3.1 在底板混凝土上彈出墻身及洞口位置線,再次校正預(yù)埋插筋,如有位移時(shí),按洽商規(guī)定認(rèn)真處理。墻模板宜采用“跳間支模”,以利于鋼筋施工。3.3.2 先綁2~4根豎筋,并畫好橫筋分檔標(biāo)志,然后在下部及齊胸處綁兩根橫筋定位,并畫好豎筋分檔標(biāo)志。一般情況橫筋在外,豎筋在里,所以先綁豎筋后綁橫筋。橫豎筋的間距及位置應(yīng)符合設(shè)計(jì)要求。
3.3.3 墻筋為雙向受力鋼筋,所有鋼筋交叉點(diǎn)應(yīng)逐點(diǎn)綁扎,其塔接長度及位置要符合設(shè)計(jì)圖紙及施工規(guī)范的要求。
3.3.4 雙排鋼筋之間應(yīng)綁間距支撐或拉筋,以固定鋼筋間距。支撐或拉筋可用φ6或φ8鋼筋制作,間距1m左右,以保證雙排鋼筋之間的距離。
3.3.5 在墻筋外側(cè)應(yīng)綁上帶有鐵絲的砂漿墊塊,以保證保護(hù)層的厚度。3.3.6 為保證門窗洞口標(biāo)高位置正確,在洞口豎筋上劃出標(biāo)高線。門窗洞口要按設(shè)計(jì)要求綁扎過梁鋼筋,錨入墻內(nèi)長度要符合設(shè)計(jì)要求。
3.3.7 各連接點(diǎn)的抗震構(gòu)造鋼筋及錨固長度,均應(yīng)按設(shè)計(jì)要求進(jìn)行綁扎。如首層柱的縱向受力鋼筋伸入地下室墻體深度;墻端部、內(nèi)外墻交接處受力鋼筋錨固長度等,綁扎時(shí)應(yīng)注意。
3.3.8 配合其他工種安裝預(yù)埋管件、預(yù)留洞口等,其位置,標(biāo)高均應(yīng)符合設(shè)計(jì)要求。4 保證項(xiàng)目:
4.1 鋼筋的品種和質(zhì)量、焊條、焊劑的牌號、性能及使用的鋼板,必須符合設(shè)計(jì)要求和有關(guān)標(biāo)準(zhǔn)的規(guī)定。進(jìn)口鋼筋焊接前,必須進(jìn)行化學(xué)成分檢驗(yàn)和焊接試驗(yàn),符合有關(guān)規(guī)定后方可焊接。
4.2 鋼筋表面必須清潔,帶有顆粒狀或片狀老銹,經(jīng)除銹后仍有麻點(diǎn)的鋼筋,嚴(yán)禁按原規(guī)格使用。
4.3 鋼筋的規(guī)格、形狀、尺寸、數(shù)量、間距、錨固長度、接頭設(shè)置,必須符合設(shè)計(jì)要求和施工規(guī)范的規(guī)定。
4.4 焊接接頭機(jī)械性能,必須符合鋼筋焊接規(guī)范的專門規(guī)定。5 基本項(xiàng)目:
5.1 綁扎鋼筋的缺扣、松扣數(shù)量不得超過綁扣數(shù)的10%,且不應(yīng)集中。5.2 彎鉤的朝向應(yīng)正確,綁扎接頭應(yīng)符合施工規(guī)范的規(guī)定,搭接長度不小于規(guī)定值。
5.3 用Ⅰ級鋼筋制作的箍筋,其數(shù)量應(yīng)符合設(shè)計(jì)要求,彎鉤角度和平直長度應(yīng)符合施工規(guī)范的規(guī)定。
5.4 對焊接頭無橫向裂紋和燒傷,焊包均勻。接頭處彎折不得大于4°,接頭處鋼筋軸線的偏移不得大于0.1d,且不大于2mm。
5.5 電弧焊接頭焊縫表面平整,無凹陷、焊瘤,接頭處無裂紋、氣孔、灰渣及咬邊。接頭尺寸允許偏差不得超過以下規(guī)定:
5.5.1 綁條沿接頭中心的縱向位移不大于0.5d,接頭處彎折不大于4°。5.5.2 接頭處鋼筋軸線的偏移不大于0.1d,且不大于3mm。5.5.3 焊縫厚度不小于0.05d。5.5.4 焊縫寬度不小于0.1d。5.5.5 焊縫長度不小于0.5d。5.5.6 接頭處彎折不大于4°。
5.6 成型鋼筋應(yīng)按指定地點(diǎn)堆放,用墊木墊放整齊,防止鋼筋變形、銹蝕、油污。
5.7 綁扎墻筋時(shí)應(yīng)搭臨時(shí)架子,不準(zhǔn)蹬踩鋼筋。
5.8 底板上、下層鋼筋綁扎時(shí),支撐馬凳要綁牢固,防止操作時(shí)踩變形。5.9 嚴(yán)禁隨意割斷鋼筋。5.10 墻、柱預(yù)埋鋼筋位移:墻、柱主筋的插筋與底板上、下筋要固定綁扎牢固,確保位置準(zhǔn)確。必要時(shí)可附加鋼筋電焊焊牢。混凝土澆筑前應(yīng)有專人檢查修整。5.11 露筋:墻、柱鋼筋每隔1m左右加綁帶鐵絲的水泥砂漿墊塊(或塑料卡)。5.12 搭接長度不夠:綁扎時(shí)應(yīng)對每個(gè)接頭進(jìn)行尺量,檢查搭接長度是否符合設(shè)計(jì)和規(guī)范要求。
5.13 鋼筋接頭位置錯(cuò)誤:梁、柱、墻鋼筋接頭較多時(shí),翻樣配料加工時(shí),應(yīng)根據(jù)圖紙預(yù)先畫出施工翻樣圖,注明各號鋼筋搭配順序,并避開受力鋼筋的最大彎矩處。
5.14綁扎接頭與對焊接頭未錯(cuò)開:經(jīng)對焊加工的鋼筋,在現(xiàn)場進(jìn)行綁扎時(shí),對焊接頭要錯(cuò)開搭接位置。因此加工下料時(shí),凡距鋼筋端頭搭接長度范圍以內(nèi)不得有對焊接頭。
本工藝標(biāo)準(zhǔn)應(yīng)具備以下質(zhì)量記錄:
鋼筋出廠質(zhì)量證明書或檢驗(yàn)報(bào)告單。2 鋼筋力學(xué)性能復(fù)試報(bào)告。
進(jìn)口鋼筋應(yīng)有化學(xué)成分檢驗(yàn)報(bào)告和可焊性試驗(yàn)報(bào)告。國產(chǎn)鋼筋在加工過程中發(fā)生脆斷、焊接性能不良和力學(xué)性能顯著不正常時(shí),應(yīng)有化學(xué)成分檢驗(yàn)報(bào)告。4 鋼筋焊接接頭試驗(yàn)報(bào)告。5 焊條、焊劑出廠合格證。
鋼筋分項(xiàng)工程質(zhì)量檢驗(yàn)評定資料。7 鋼筋分項(xiàng)隱蔽工程驗(yàn)收記錄