第一篇:成都金堂·水城印象7#樓施工組織設(shè)計摘要
【摘要】:本工程為成都宏展房地產(chǎn)開發(fā)有限公司金堂.水城印象1#樓工程,工程通過編制施工組織設(shè)計,能確保資源優(yōu)化配置,施工進(jìn)度合理,施工工藝適當(dāng),排除各種干擾。建筑市場交易活動的特點,決定了承包者要取得施工任務(wù),必須在建筑市場上參加競爭。承包企業(yè)要競爭取勝,就必須進(jìn)行充分籌劃,確定對策,并滿足招標(biāo)方標(biāo)書中有關(guān)組織方面的要求,這就必須編制施工組織設(shè)計。另外,建筑工程施工的復(fù)雜的施工工藝,對施工技術(shù)的特殊都要求具有科學(xué)、嚴(yán)密、有效的施工組織設(shè)計。和高難要求,需要處理好的眾多協(xié)作配合關(guān)系,施工準(zhǔn)備工作的復(fù)雜性、大量性和長時間性,對國民經(jīng)濟(jì)發(fā)展的強(qiáng)相關(guān)性等等,【關(guān)鍵詞】: 施工總體部署;施工準(zhǔn)備工作;施工平面布置;主體施工。
[abstract]: This works for the Chengdu Wang Chin of real estate development company limited Jintang.City impression 1 # building projects, projects through the construction organization design, to ensure that resource optimizes configuration, construction schedule, construction technology appropriate, remove all interference.The building the market trades activity characteristics, determines the contractor must obtain the construction work, must participate in the competition in the construction market.Contracting enterprise to win in the competition, must undertake sufficient planning, decide countermeasure, and meet the tenderee tender organizations concerned requirements, this must be the preparation of construction organization design.In addition, the construction of a complex construction technology, the construction technology of special are required to have the science, rigorous, efficient construction organization design.And high requirements, need has handled numerous cooperation relation, construction preparation work complexity, large quantity and long time of development of the national economy, the strong correlation and so on。
【 Keywords 】:General construction;construction of preparatory work;construction layout;the main construction.
第二篇:成都金堂·水城印象7#樓施工組織設(shè)計感謝信
致謝
三年的學(xué)習(xí)生活即將結(jié)束,回顧三年的學(xué)習(xí)生活,感受頗深,收獲豐厚。在論文的寫作過程中,有很多困難,無論是在理論學(xué)習(xí)階段,還是在論文的選題、資料查四詢、開題、研究和撰寫的每一個環(huán)節(jié),無不得到導(dǎo)師的悉心指導(dǎo)和幫助。借此機(jī)會我向?qū)煴硎局孕牡母兄x!同時,我要感謝四川建筑職業(yè)技術(shù)學(xué)院授課的各位老師,正是由于他們的傳道、授業(yè)、解惑,讓我學(xué)到了專業(yè)知識,并從他們身上學(xué)到了如何求知治學(xué)、如何為人處事。同時我也要感謝我的同學(xué)給予我的幫助,他們?yōu)槲易珜懻撐奶峁┝瞬簧俳ㄗh和幫助。我要感謝,非常感謝我的導(dǎo)師劉老師。他為人隨和熱情,治學(xué)嚴(yán)謹(jǐn)細(xì)心。在閑聊中他總是能像知心朋友一樣鼓勵你,在論文的寫作和措辭等方面她也總會以“專業(yè)標(biāo)準(zhǔn)”嚴(yán)格要求你,從選題、定題開始,一直到最后論文的反復(fù)修改、潤色,老師始終認(rèn)真負(fù)責(zé)地給予我深刻而細(xì)致地指導(dǎo),幫助我開拓研究思路,精心點撥、熱忱鼓勵。正是劉老師的無私幫助與熱忱鼓勵,我的畢業(yè)論文才能夠得以順利完成。還要感謝三年的大學(xué)生活,感謝我的家人和那些永遠(yuǎn)也不能忘記的朋友,他們的支持與情感,是我永遠(yuǎn)的財富。
最后,衷心感謝于百忙之中評閱論文的各位老師專家、教授!
第三篇:成都印象(古詩詞)
《春夜喜雨》 唐◎杜甫
好雨知時節(jié),當(dāng)春乃發(fā)生。隨風(fēng)潛入夜,潤物細(xì)無聲。野徑云俱黑,江船火獨明。曉看紅濕處,花重錦官城。《懷錦水居止二首》之二 唐◎杜甫
萬里橋西宅,百花潭北莊。層軒皆面水,老樹飽經(jīng)霜。雪嶺界天白,錦城曛日黃。惜哉形勝地,回首一茫茫。成都竹枝詞
府城隍廟賣燈市,科甲巷中燈若干。萬燭照人笙管沸,當(dāng)頭明月有誰看。
楊奕[清]
錦城竹枝詞
花燈大放鬧喧天,獅子龍燈竹馬全。看到錦城春不夜,愛人惟有彩蓮船。
第四篇:施工組織設(shè)計 畢業(yè)論文 摘要 翻譯
佛山市獅山鎮(zhèn)博愛湖溢流壩工程
施工組織設(shè)計
作者:向洪建 專業(yè)班級:水利水電工程113 指導(dǎo)教師:朱林
摘 要:佛山市獅山鎮(zhèn)博愛調(diào)蓄湖水系整治工程建設(shè)內(nèi)容為:新建博愛調(diào)蓄湖、擋水溢流堰一座、補(bǔ)水泵站一座、整治河涌兩條、排水閘站兩座。獅山鎮(zhèn)博愛調(diào)蓄湖擋水溢流堰工程為博愛調(diào)蓄湖與下游河涌水系建設(shè)工程的組成部分;是該工程重要建筑物之一。本工程位于南海區(qū)獅山鎮(zhèn),獅山鎮(zhèn)西南面為北江,西北面為西南涌。
博愛調(diào)蓄湖建設(shè)包括湖區(qū)約 545 畝的水面及 7.265km 的環(huán)島岸線的建設(shè),新建湖區(qū)擋水溢流堰一座、補(bǔ)水泵站一座及補(bǔ)水管線。博愛湖將其建成一個具有雨洪調(diào)蓄、生態(tài)、景觀、休閑功能于一體的生態(tài)湖區(qū)。
其中擋水溢流堰為新建湖區(qū)主要調(diào)蓄建筑物。該溢流堰為混凝土結(jié)構(gòu),地基為淤泥質(zhì)粘土,采用高壓旋噴樁處理;溢流堰下游設(shè)消力池、海曼、防沖槽等,地基處理采用土方換填措施;下游兩岸混凝土翼墻基礎(chǔ)均采用高壓旋噴樁。
本設(shè)計要求根據(jù)設(shè)計布置和建筑物結(jié)構(gòu)特征、根據(jù)現(xiàn)場地形地質(zhì)條件、氣象水文條件及場內(nèi)外交通、風(fēng)水電供應(yīng)、材料供應(yīng)條件等,確定導(dǎo)流方案,圍堰施工方案,基坑開挖,施工臨時設(shè)施面積,確定溢流壩工程施工方案,進(jìn)行施工總布置,編制施工總進(jìn)度計劃,提出資源配置計劃,作為指導(dǎo)施工管理的綱領(lǐng)、進(jìn)行成施工本核算的依據(jù)。
本次設(shè)計分析現(xiàn)場各種因素對建設(shè)施工的影響,研究各種可能的對策和措施,經(jīng)比選確定采用方案;并對方案進(jìn)行分析計算,使之技術(shù)上可靠,經(jīng)濟(jì)上合理。經(jīng)比較篩選,最后得出博愛湖溢流壩工程施工組織設(shè)計的具體內(nèi)容,并繪制出圖紙。
關(guān)鍵詞:溢流堰;施工組織設(shè)計;條件;施工總進(jìn)度;施工總布置
THE CONSTRUCTION ORGANIZATION OF BO’AI LAKE DAM PROJECT IN SHISHAN TOWN FOSHAN CITY Author:Hongjian Xiang
Major and Class:Water Conservancy and Hydropower Engineering of Class 113
Instructor:Lin Zhu
Abstract:The aim of Bo’ai lake and water system improvement project in Shishan Town Foshan City is build a new Bo’ai lake,a water retaining weir ,a water pump station,the remediation of two rivers,two drainage sluice stations.The Bo’ai retaining weir lake project in Shishan Town is a part of Bo’ai retaining weir and the downstream river construction works;is one of the important buildings of the project.The project is located in Shishan Town, Nanhai District, Shishan town is located on southwest of North River, northwest of the town is southwest River.The project including about 545 acres of water surface and 7.265km of shoreline around the island,to build a new retaining a weir lake,a water pump station and water pipeline.The Bo’ai Lake will be a ecological lake system which can maintain rainwater and flood storage, is a ecological lake, landscape, has leisure functions.The water retaining weir is the main building of the new lake.The water retaining weir is a concrete construction.the base of the weir is sludge clay.Use high-pressure rotary jet grouting pile to process the foundation.In the downstream are stilling pool,the apron, guards against flushes the trough etc.The placement of earth to treat the foundation.The high-pressure rotary jet grouting pile is used to treat the basement of the two sides concrete wing wall.The design requires the determination of the construction scheme and layout,resource allocation plan,construction schedule according to the designed arrangements,the structure characteristics,the site topography and geological conditions, meteorological hydrological conditions,traffic and wind,water,electricity supplement,and material supply conditions, as the guide of the construction management program and the construction of the accounting basis.The design analyses the different influences factors on the construction of the building, do research on different policies and measures, by comparison to determine the scheme,calculate the scheme , make the scheme reliable on technology, reasonable on economic.By comparing, and finally get the the specific content of the project, and draw the blueprint.To work out the diversion scheme, cofferdam construction program, excavation,area of temporary facilities construction.Keywords: water retaining weir,construction organization, conditions,allocation plan, construction layout
第五篇:土樓印象詩歌[推薦]
沒有人知道
你的過去 也
沒有人知道
你的將來 只有
神仙掰著手指細(xì)數(shù)你的窈窕
---
月亮最愛在你的頭上
徜徉 她一定是眷顧
流水般的磚瓦 鋼鐵般的土墻
麻雀很想把家安在你的心中
是因為 你的厚道和包容
能夠涵蓋所有滄桑
---
天很祥和
地很柔軟
人唱著情歌
太陽很溫暖
溪水很活潑
還有那日月不倦的破水車
---
鐵門太啰嗦
水喉太寂寞
槍眼太安靜
坐在門前的老人嘮叨著昨天的艱苦和卓絕
---
臺風(fēng)沒有眼
地震沒有嗓音
火沒有腳
大炮沒有武功
城墻也沒有絕招
傲視是你的金鐘罩
---
烏龜還在不倦的勞動
青苔還在忘情地攀爬
鵝卵石還是那么強(qiáng)壯
大門上的樓匾還是那么
輝煌 遒勁 陽剛
---
沒有炊煙裊裊
沒有荷鋤晚歸
沒有老牛哞叫
只有wi-fi和網(wǎng)絡(luò)
樓里樓外相互追逐
---
樓沒有變
挺拔的身軀
樓主在變
標(biāo)準(zhǔn)的English。