第一篇:鋁合金門窗節(jié)能專項(xiàng)方案
臨 海 湖 畔 尚 城 鋁 合 金 門 窗
節(jié)
能
專
項(xiàng)
方
案
編制人:__________________________ 審核人:__________________________ 審批人:__________________________
浙江正和建筑裝飾有限公司
二OO七年十月
目錄
一、工程概況
····················································· 1
1.1 工程名稱
····················································· 1 1.2 工程內(nèi)容
····················································· 1
二、編制依據(jù)
···················································· 1
2.1 施工圖紙
·····················································
12.2 主要規(guī)范、規(guī)程
··············································· 1
三、施工部署
···················································· 1
3.1 建筑節(jié)能工程技術(shù)質(zhì)量管理體系
································· 1
3.2 質(zhì)量保證體系
················································· 1
3.3 本工程采用的建筑節(jié)能措施
····································· 2
四、主要施工方法
··············································· 2
4.1 材料選用、加工、運(yùn)輸
········································· 2
4.2 產(chǎn)品加工與運(yùn)輸
··············································· 3
4.3 現(xiàn)場(chǎng)安裝
····················································· 3
4.4 鋁合金門窗其他裝配技術(shù)要求
··································· 5
五、安全生產(chǎn)、文明施工措施
································· 6
5.1 安全生產(chǎn)及文明施工措施
······································· 6
5.2 現(xiàn)場(chǎng)文明施工管理制度
········································· 6
5.3 消防制度
····················································· 7
一.工程概況:
1.1 工程名稱: 臨海市湖畔尚城 1.2 工程內(nèi)容: 鋁合金門窗制安工程
二.編制依據(jù):
2.1 施工圖紙
A-2#、3#、4#、5#、6#、7#、8#、9#、10#樓及B-1#、2#、3#、4#、5#、6#、7#、8#、9#、10#、11#樓施工圖紙。2.2 主要規(guī)范、規(guī)程
建筑工程施工質(zhì)量統(tǒng)一驗(yàn)收標(biāo)準(zhǔn)---GB50300-2001
建筑節(jié)能工程施工質(zhì)量驗(yàn)收規(guī)范----GB 50411 – 2007
三.施工部署:
3.1 建筑節(jié)能工程技術(shù)質(zhì)量管理體系
為了貫徹國家建筑節(jié)能的政策,加強(qiáng)建筑節(jié)能工程的施工管理。我項(xiàng)目經(jīng)理部成立了以項(xiàng)目經(jīng)理為組長;項(xiàng)目生產(chǎn)副經(jīng)理、項(xiàng)目總工為副組長的建筑節(jié)能工程施工領(lǐng)導(dǎo)小組,其機(jī)構(gòu)組成、人員編制及責(zé)任分工如下:
組 長:朱明陽——負(fù)責(zé)組織協(xié)調(diào)工作
副組長:戴守偉——技術(shù)總部署、方案編制及交底 組 員:蔣朝輝——現(xiàn)場(chǎng)施工管理
王以敏——現(xiàn)場(chǎng)施工管理、工程資料
3.2 質(zhì)量保證體系
質(zhì)量是我公司的生存之本。我項(xiàng)目經(jīng)理部通過認(rèn)真學(xué)習(xí)建筑節(jié)能工程相關(guān)規(guī)程、規(guī)范、標(biāo)準(zhǔn),強(qiáng)化質(zhì)量意識(shí),建立了行之有效的規(guī)范化質(zhì)量管理體系,能夠使建筑節(jié)能工程的各項(xiàng)工作均處于良好的受控狀態(tài)。
在施工過程中,我項(xiàng)目經(jīng)理部將嚴(yán)格按照相關(guān)規(guī)程、規(guī)范、標(biāo)準(zhǔn)等執(zhí)行。為完成好本工程的建筑節(jié)能工程,根據(jù)本工程的特點(diǎn),我項(xiàng)目經(jīng)理部將對(duì)以下環(huán)節(jié)作為建筑節(jié)能工程的質(zhì)量控制點(diǎn):(1)建筑節(jié)能材料的檢驗(yàn)
A.建筑節(jié)能材料須有檢驗(yàn)報(bào)告及出廠合格證。B.中空玻璃等規(guī)范要求復(fù)試的材料使用前必須經(jīng)復(fù)試合格后方能使用。(3)制定相應(yīng)技術(shù)措施,作好工序過程控制。
A.施工前應(yīng)做好圖紙審查工作,將技術(shù)關(guān)口前移。施工前認(rèn)真編好作業(yè)指導(dǎo)書,做好技術(shù)交底。
B.施工過程中嚴(yán)格執(zhí)行三檢制和樣板引路制度,做好預(yù)測(cè)預(yù)控及全方位的過程控制。
C.做好技術(shù)復(fù)測(cè)及資料整理工作,主要材料及施工過程操作要留有痕跡,具有可追溯性。
D.對(duì)關(guān)鍵部位及特殊工序要責(zé)任到人,從“人、機(jī)、料、法、環(huán)”五個(gè)方面進(jìn)行控制。
3.3 本工程采用的建筑節(jié)能措施主要有:
①選用的門窗的品種、形式符合設(shè)計(jì)要求和相關(guān)的節(jié)能標(biāo)準(zhǔn); ②鋁型材壁厚不小于1.4mm;
③玻璃均采用5+9A+5中空玻璃,室內(nèi)側(cè)玻璃原片為浮法清玻,室外側(cè)玻璃原片為本體著色(灰色)浮法清玻;
④門窗外框與結(jié)構(gòu)墻體間隙采用彈性閉孔材料填充飽滿,并在室外使用硅酮密封膠密封;
⑤窗扇玻璃與鋁合金框下部接觸采用5mm厚橡皮墊塊,四周采用硅酮密封膠密封;
⑥平開窗內(nèi)外扇密封條采用三元乙丙橡膠條,其物理性能應(yīng)符合相關(guān)標(biāo)準(zhǔn); ⑦鋁合金窗氣密性試驗(yàn)應(yīng)達(dá)到3級(jí)或3級(jí)以上標(biāo)準(zhǔn);
四.主要施工方法
4.1 材料選用、加工、運(yùn)輸
(1)材料的選用
本工程使用的各種材料,均根據(jù)施工圖紙要求選定。(2)原材料質(zhì)量控制
在購料前,工程技術(shù)人員首先對(duì)材料的材質(zhì)及性能進(jìn)行詳細(xì)的檢查、檢測(cè),符合要求始進(jìn)行訂貨。材料進(jìn)場(chǎng)后質(zhì)量部門對(duì)材料的表觀質(zhì)量及尺寸按檢驗(yàn)標(biāo)準(zhǔn)進(jìn)行檢驗(yàn),各種材料生產(chǎn)廠家的產(chǎn)品質(zhì)量證明書,檢查確認(rèn)合格后方可進(jìn)行加工。關(guān)鍵性材料(譬如∶密封膠、五金件、中空玻璃等)除檢查上述證明外,還要檢 查其保用年限是否滿足設(shè)計(jì)要求。4.2 產(chǎn)品加工與運(yùn)輸
(1)產(chǎn)品加工
加工前檢查各類量具,確保測(cè)量工具的精度;其他工具定期或隨時(shí)檢查。嚴(yán)格按業(yè)主審批后的設(shè)計(jì)施工圖紙進(jìn)行門窗框、門窗扇加工。
零部件安裝前檢驗(yàn)其質(zhì)量及型號(hào)是否符合現(xiàn)行有關(guān)標(biāo)準(zhǔn)及業(yè)主招標(biāo)文件的規(guī)定,不符合或不合格的禁用。
各構(gòu)件的加工精度允許偏差嚴(yán)格按行業(yè)標(biāo)準(zhǔn)執(zhí)行。
加工完畢的同一品種、類型、規(guī)格的門窗每100樘劃分為一個(gè)檢驗(yàn)批,不足100樘的也為一個(gè)檢驗(yàn)批,每個(gè)檢驗(yàn)批應(yīng)抽查5%,并不少于3樘,不足3樘時(shí)應(yīng)全數(shù)檢查;當(dāng)其中一件不合格時(shí),加倍抽檢,復(fù)檢合格后方可驗(yàn)收。
(2)成品、半成品包裝運(yùn)輸
因?yàn)殇X合金門窗除了通風(fēng)、采光功能之外,也起到裝飾用,因此對(duì)出廠的門窗框、門窗扇等均采取用工程保護(hù)膠帶粘貼在材料表面,帶包裝運(yùn)到現(xiàn)場(chǎng)。以防止在運(yùn)輸、安裝后受到磕、碰、磨損等損害。
所有材料運(yùn)到工地現(xiàn)場(chǎng),都將放在通風(fēng)避雨的地方臨時(shí)存放。
吊運(yùn)組裝門窗,?應(yīng)用非金屬繩索捆綁,嚴(yán)禁碰撞、擠壓,以防門窗損傷和變形。
型材包裝后裝車時(shí),應(yīng)沿車箱長度方向擺放;擺放要嚴(yán)密整齊、不留空隙,防止車輛行駛中發(fā)生攛動(dòng)。型材擺放高度超出車箱板時(shí),須捆扎牢固、防止脫落;型材與鋼件等硬質(zhì)材料混裝時(shí),必須采取有效措施進(jìn)行隔離。
運(yùn)輸途中應(yīng)盡量保持車輛行駛平穩(wěn),路況不好時(shí)應(yīng)注意慢行。4.3 現(xiàn)場(chǎng)安裝
(1)鋁合金門窗施工工藝流程
準(zhǔn)備工作→測(cè)量、放線→確認(rèn)安裝基準(zhǔn)→安裝門窗框→校正→固定門窗框→填充發(fā)泡劑→土建抹灰收口→門窗外周圈打膠→安裝門窗扇→安裝門窗五金件→清理、清洗門窗→檢查驗(yàn)收
(2)施工準(zhǔn)備 1)技術(shù)準(zhǔn)備 ① 施工組織準(zhǔn)備
安裝作業(yè)人員在接到圖紙后,先對(duì)圖紙進(jìn)行熟悉了解。不僅要對(duì)門窗施工圖要了解,對(duì)土建建筑結(jié)構(gòu)圖也需了解,主要了解以下幾個(gè)方面內(nèi)容:
對(duì)圖紙內(nèi)容進(jìn)行全面的了解; 對(duì)照土建圖紙驗(yàn)證施工方案及設(shè)計(jì); 了解立面變化的位置、標(biāo)高變化的特點(diǎn)。
② 上墻安裝前,首先檢查洞口表面平整度、垂直度應(yīng)符合施工規(guī)范,對(duì)土建提供的基準(zhǔn)線進(jìn)行復(fù)核。事先與土建施工隊(duì)協(xié)商安裝時(shí)的上墻步驟、技術(shù)要求等,做到相互配合,確保產(chǎn)品安裝質(zhì)量。
③ 根據(jù)土建施工彈出的門窗安裝標(biāo)高控制線及平面中心位置線測(cè)出每個(gè)門窗洞口的平面位置、標(biāo)高及洞口尺寸等偏差。要求洞口寬度、高度允許偏差±10mm,洞口垂直水平度偏差全長最大不超過10mm。
④ 根據(jù)實(shí)測(cè)的門窗洞口偏差值,進(jìn)行數(shù)理統(tǒng)計(jì),根據(jù)統(tǒng)計(jì)結(jié)果最終確定每個(gè)門窗安裝的平面位置及標(biāo)高。
⑤ 逐個(gè)清理洞口。2)人員準(zhǔn)備 ① 施工人員
安裝人員都必須經(jīng)過專業(yè)技術(shù)培訓(xùn)。② 崗前培訓(xùn)
工人進(jìn)場(chǎng)后由項(xiàng)目經(jīng)理對(duì)進(jìn)場(chǎng)全部施工人員講解本工程的重要性,使全體施工人員了解工程大致情況及工地的各項(xiàng)要求。
由施工員向操作工人詳細(xì)講解相關(guān)的標(biāo)準(zhǔn)、規(guī)范及施工現(xiàn)場(chǎng)安全管理有關(guān)規(guī)定及安全生產(chǎn)準(zhǔn)則等。
由技術(shù)員向施工人員進(jìn)行施工方案、技術(shù)、安全等方面的交底,使工人在施工前做到心中有數(shù),熟知各個(gè)環(huán)節(jié)的施工質(zhì)量標(biāo)準(zhǔn),以做到在施工過程中嚴(yán)格控制。
(3)門窗框安裝
門窗框在外墻及室內(nèi)抹灰施工前進(jìn)行。按照施工計(jì)劃將即將安裝的門窗框運(yùn) 到指定位置,同時(shí)注意其表面的保護(hù)。
將鐵腳鑲?cè)虢M裝好的門窗框,固定片的位置應(yīng)距門窗角、中豎框、中橫框150~2OOmm,固定片之間的間距應(yīng)不大于500㎜。
根據(jù)設(shè)計(jì)圖紙及門窗扇的開啟方向,確定門窗框的安裝位置,并把門窗框裝入洞口,并使其上下框中線與洞口中線對(duì)齊。安裝時(shí)應(yīng)采取防止門窗變形的措施。平開門應(yīng)使下框低于地面標(biāo)高線lOmm,當(dāng)下框長度大于0.9m時(shí),其中間用木楔塞緊。然后調(diào)整垂直度、水平度及直角度。
(4)門窗扇、五金件安裝
工藝流程:施工準(zhǔn)備→檢查驗(yàn)收→將門窗扇按層次擺放→初安裝→調(diào)整→固定→自檢→報(bào)驗(yàn)。
門窗扇在外保溫施工完閉后安裝。用垂直升降設(shè)備將門窗扇、玻璃先后運(yùn)輸?shù)叫璋惭b的各樓層,由工人運(yùn)到安裝部位。
上墻前對(duì)組裝的門窗進(jìn)行復(fù)查,?如發(fā)現(xiàn)有組裝不合格者,或有嚴(yán)重碰、劃傷者,缺少附件等應(yīng)及時(shí)加以處理。
門窗附件必須安裝齊全、位置準(zhǔn)確、安裝牢固,開啟或旋轉(zhuǎn)方向正確、啟閉靈活、無噪聲,承受反復(fù)運(yùn)動(dòng)的附件在結(jié)構(gòu)上應(yīng)便于更換。
(5)玻璃安裝及打膠
安裝玻璃時(shí)在玻璃上下用橡膠墊塊塞緊,防止門窗扇變形;裝配后應(yīng)保證玻璃與鑲嵌槽間隙,并在主要部位裝有減振墊塊,使其能緩沖啟閉力的沖擊。
注膠完成后將保護(hù)膠帶撕掉、擦凈門窗主框、窗臺(tái)表面(必要時(shí)可以用溶劑擦拭)。注膠后注意保養(yǎng),膠在完全固化前不要粘灰和碰傷膠縫。最后做好清理工作。
4.4 鋁合金門窗其他裝配技術(shù)要求
門窗構(gòu)件連接應(yīng)牢固,需用填充材料使連接部分密封、防水。門窗結(jié)構(gòu)應(yīng)有可靠的剛性,根據(jù)需要允許設(shè)置加固件。
門窗框、扇配合嚴(yán)密,間隙均勻。其扇與框的搭接寬度允許偏差±1mm。門窗用附件安裝位置正確,齊全牢固,應(yīng)起到各自的作用,具有足夠的強(qiáng)度,啟閉靈活,無噪聲、承受反復(fù)運(yùn)動(dòng)的附件,在結(jié)構(gòu)上應(yīng)便于更換。
門窗用玻璃、五金、密封等附件,其質(zhì)量應(yīng)與門窗的質(zhì)量等級(jí)相適應(yīng)。裝配后應(yīng)保證玻璃與鑲嵌槽間隙,并在主要部位裝有減振墊塊,使其能緩沖啟閉力的沖擊。
門窗的品種、規(guī)格、尺寸、性能、開啟方向、安裝位置、連接方式及鋁合金門窗的型材壁厚應(yīng)符合設(shè)計(jì)要求。
門窗扇安裝必須牢固,并應(yīng)開啟靈活、關(guān)閉嚴(yán)密、無倒翹。
門窗扇固定玻璃的橡膠密封條應(yīng)安裝完好,不得出現(xiàn)皺褶、脫槽、兩方向不交圈等。
門窗框(含拼接料)正、側(cè)面的垂直度偏差每米不大于2mm。門窗框(含拼接料)的水平度偏差每米不大于1.5mm。門窗橫框的標(biāo)高與基線比較偏差不大于5mm。
各層門窗側(cè)面應(yīng)在同一垂直直線內(nèi),總差不大于5mm。平開門窗應(yīng)關(guān)閉嚴(yán)密、扇與框搭接量應(yīng)均勻,允許偏差1mm。
五、安全生產(chǎn)、文明施工措施
5.1 安全生產(chǎn)及文明施工措施
特殊工種(電工)持證上崗。
2人以上共同操作時(shí)應(yīng)協(xié)調(diào)一致,互相合作。
施工安裝時(shí),不得違章操作,遇有特殊情況,須經(jīng)有關(guān)部門領(lǐng)導(dǎo)同意后方可施工。
在使用工具前,檢查其安全性能是否完好,不具備完好標(biāo)準(zhǔn)的工具嚴(yán)禁使用。工地內(nèi)架設(shè)的電線,必須征得有關(guān)部門的同意,并符合用電規(guī)章制度?,F(xiàn)場(chǎng)施工時(shí),應(yīng)嚴(yán)格遵守國家有關(guān)防火條例。5.2 現(xiàn)場(chǎng)文明施工管理制度
在工作現(xiàn)場(chǎng),全體工作人員必須戴安全帽及設(shè)置必要的安全標(biāo)志。施工現(xiàn)場(chǎng)物品要擺放有序,不得亂放。不得任意向下扔擲物品,嚴(yán)防物品傷人。
廢棄物品統(tǒng)一收集,統(tǒng)一處理,要保持工地衛(wèi)生。工作現(xiàn)場(chǎng)嚴(yán)格執(zhí)行防火、消防制度,嚴(yán)防火災(zāi)發(fā)生。工作后清理工作現(xiàn)場(chǎng),檢查有無火源。
與有關(guān)單位配合及協(xié)調(diào)時(shí)應(yīng)注意團(tuán)結(jié),有問題及時(shí)匯報(bào),不得自行其事。工作現(xiàn)場(chǎng)嚴(yán)禁戲耍打鬧。
對(duì)于不聽從管理,不服從指揮,違反現(xiàn)場(chǎng)管理制度者,停止其工作,并清退出場(chǎng)。5.3 消防制度
全體工作人員必須遵守市政府有關(guān)規(guī)定,遵守國家法規(guī)法律,遵守工地規(guī)定,以預(yù)防為主,杜絕火災(zāi)事故發(fā)生。
施工中以預(yù)防為主,工作前檢查現(xiàn)場(chǎng),將一切可燃物品移至工作區(qū)外。易燃易爆物品由專人負(fù)責(zé),工作后統(tǒng)一收回保管。
如遇特殊情況,應(yīng)首先切斷火源,及時(shí)轉(zhuǎn)移可燃物品,聽從指揮,保證國家財(cái)產(chǎn)及人身安全。
工作現(xiàn)場(chǎng)禁止吸煙。
電源電線每天進(jìn)行檢查,嚴(yán)防發(fā)生漏電起火。
第二篇:鋁合金門窗施工安全文明專項(xiàng)方案
鋁合金門窗施工安全文明專項(xiàng)方案
前言
我公司是一支擁有雄厚的鋁門窗、制作施工技術(shù)力量施工經(jīng)驗(yàn)的專業(yè)性建筑施工隊(duì)伍。近年來,我公司先后承建了大量的具有一定社會(huì)影響的高級(jí)住宅的門窗項(xiàng)目, 贏得了一 定的社會(huì)聲譽(yù), 積累了豐富的安全文明施工經(jīng)驗(yàn)和大量的安全文明施工技術(shù)資料, 并配備專業(yè)施工人員現(xiàn)場(chǎng)管理、監(jiān)督、巡査, 對(duì)所有現(xiàn)場(chǎng)施工人員進(jìn)行安全文明施工教育及指導(dǎo)。我們對(duì)該工程鋁合金門窗工程,在施工安全文明方面作出了充分的配備, 對(duì)安全文明完成施工任務(wù)充滿信心。
第一節(jié)
安全生產(chǎn)保證措施
1.1安全保證措施
1、安全控制指標(biāo)
確保工程、設(shè)備安全、施工人員傷亡零指標(biāo),本工程無重大傷亡事故。堅(jiān)持“安全第一、人人有責(zé)”的原則,施工過程中有始有終以“安全第一、人人有責(zé)”為主的基本原則。以人為核心,提高施工人員的安全保護(hù)意識(shí)。以預(yù)防為主, 專人看護(hù)及樓層巡視為主, 把施工過程中所發(fā)現(xiàn)的安全事故隱患及時(shí)處理解決。
2、安全生產(chǎn)管理體系
由于本工程交叉作業(yè)多,安全生產(chǎn)尤為重要,為了有條不紊地組織安全生產(chǎn),必須組織所有施工人員學(xué)習(xí)和掌握安全操作規(guī)程和有關(guān)安全生產(chǎn)、文明施工條例, 成立以項(xiàng)目經(jīng)理為首的安全生產(chǎn)管理小組,按施工區(qū)域分別確定專職安全員,各生產(chǎn)班組設(shè)兼職安全員,建立一整套的安全生產(chǎn)管理體系。
3、項(xiàng)目經(jīng)理安全生產(chǎn)職責(zé)
1)作為工程項(xiàng)目的安全生產(chǎn)、現(xiàn)場(chǎng)標(biāo)化工作的第一責(zé)任人,負(fù)有領(lǐng)導(dǎo)組織項(xiàng)目人員研究、制定保證施工全過程安全生產(chǎn), 現(xiàn)場(chǎng)標(biāo)化目標(biāo)的對(duì)策措施并組織實(shí)施。
2)每周對(duì)項(xiàng)目現(xiàn)場(chǎng)安全生產(chǎn)執(zhí)行情況進(jìn)行總結(jié)、布置、講評(píng), 經(jīng)常性布置與落實(shí)施工現(xiàn)場(chǎng)標(biāo)化管理工作。
3)授權(quán)項(xiàng)目安全員對(duì)施工班組進(jìn)行安全教育交底, 獎(jiǎng)罰 及安全措施的監(jiān)督檢査。
4)與施工隊(duì)、組簽訂勞務(wù)承包合時(shí),嚴(yán)格執(zhí)行訂立合同同時(shí)訂立安全協(xié)議與治安消防協(xié)議,齊全后安排生產(chǎn)。)正確處理安全生產(chǎn)與其他工作的關(guān)系, 帶頭遵紀(jì)守法, 不違章指揮, 一旦發(fā)生事故苗子,負(fù)責(zé)原因分析、處理,堅(jiān)持“三不放過”的原則。
6)每月組織安全生產(chǎn)檢査,現(xiàn)場(chǎng)標(biāo)化檢査,經(jīng)常聽取項(xiàng)目人員對(duì)安全、標(biāo)化工作及設(shè)施情況的匯報(bào)建議,落實(shí)改進(jìn)措施。
7)監(jiān)督、考核項(xiàng)目部人員的安全職責(zé)的落實(shí),積極支持安全專職人員的工作。
8)無論在白査或上級(jí)檢査中, 檢査人員開出的整改通知, 迅速落實(shí)整改人,按整改期限組織整改,必須做到按通知內(nèi)容逐條整改, 逐條消除, 完畢后交簽發(fā)部門歸檔。
9)一旦發(fā)生工傷事故,立即組織搶救,迅速上報(bào),保護(hù)好現(xiàn)場(chǎng),參加調(diào)査。
4、項(xiàng)目技術(shù)工程師安全生產(chǎn)職責(zé)
1)對(duì)項(xiàng)目勞動(dòng)保護(hù)和安全生產(chǎn)的技術(shù)工作負(fù)責(zé), 負(fù)責(zé)提出改進(jìn)勞動(dòng)防護(hù)措施, 創(chuàng)造安全生產(chǎn)環(huán)境。
2)編制施工組織設(shè)計(jì), 同時(shí)編制適應(yīng)本項(xiàng)目的安全技術(shù)措施,編制現(xiàn)場(chǎng)施工用電組織設(shè)計(jì),編制特殊工作的安全操作規(guī)定,保證施工組織設(shè)計(jì)各級(jí)審批手續(xù)完整。
3)在組織編制施工組織設(shè)計(jì)和采用新技術(shù)、新工藝、新設(shè)備時(shí),應(yīng)制定相應(yīng)的安全技術(shù)措施。)對(duì)現(xiàn)場(chǎng)出現(xiàn)的各種安全技術(shù)質(zhì)量問題及時(shí)協(xié)調(diào)處置, 對(duì)分部主體會(huì)同有關(guān)人員向隊(duì)、組作質(zhì)量安全交底,并做好書面記錄。
5)及時(shí)解決生產(chǎn)中的安全技術(shù)問題,確保安全生產(chǎn)。
6)一旦發(fā)生事故,參與原因分析、處理,堅(jiān)持“三不放過”原則。
7)強(qiáng)化對(duì)項(xiàng)目安全、標(biāo)準(zhǔn)全方位的監(jiān)督,檢査職責(zé)。
5、項(xiàng)目施工協(xié)調(diào)人安全生產(chǎn)職責(zé)
1)認(rèn)真執(zhí)行項(xiàng)目部的安全生產(chǎn),現(xiàn)場(chǎng)標(biāo)化管理的實(shí)施要求。
2)堅(jiān)持貫徹落實(shí)制定的施工組織設(shè)計(jì)中的安全措施,突出安全第一的方針。
3)在安排隊(duì)、組分包作業(yè)中,進(jìn)行每道工序的安全技術(shù)交底,做好書面記錄,由隊(duì)、組分包単位簽字認(rèn)可。
4)按照現(xiàn)場(chǎng)標(biāo)化管理要求,督促考核班組做好工作。
5)對(duì)違章作業(yè)現(xiàn)象及時(shí)指正,采取相應(yīng)防范措施,直到停止其工作實(shí)行罰款或建議清退。
6)組織班組進(jìn)行班前安全講話,參加“三上崗,一講評(píng)”。
7)對(duì)自査及上級(jí)檢査中發(fā)現(xiàn)的隱患或存在的不足之處,應(yīng)組織整改的直接責(zé)任人,必須按期保質(zhì)的落實(shí)整改到位。
6、項(xiàng)目安全員生產(chǎn)職責(zé)
1)認(rèn)真貫徹落實(shí)安全生產(chǎn)制度,協(xié)助項(xiàng)目經(jīng)理針對(duì)現(xiàn)場(chǎng)生產(chǎn)制定安全生產(chǎn)實(shí)施細(xì)則。
2)負(fù)責(zé)對(duì)班組進(jìn)行安全生產(chǎn)宣傳、教育工作,指導(dǎo)工人搭設(shè)好安全防范措施。
3)深入檢査安全措施落實(shí)情況,發(fā)現(xiàn)不當(dāng)之處會(huì)同施工協(xié)調(diào)人員落實(shí)整改, 并向項(xiàng)目經(jīng)理及有關(guān)部門匯報(bào), 有危險(xiǎn)情況,有權(quán)發(fā)出停止作業(yè)指令,保證安全生產(chǎn)。
4)在項(xiàng)目經(jīng)理領(lǐng)導(dǎo)下,加強(qiáng)巡視檢査及整改,并做好書面記錄,對(duì)問題及時(shí)開出整改單,并負(fù)責(zé)整改資料及時(shí)匯報(bào)與歸檔。
5)會(huì)同有關(guān)部門對(duì)吊車、起重設(shè)備、腳手架進(jìn)行驗(yàn)收、掛牌,做到不帶“病”運(yùn)行。
6)對(duì)吊車、腳手架拆除內(nèi)容落實(shí)警戒與監(jiān)護(hù)人。安排施工安全監(jiān)控人員工作,檢査實(shí)施情況。
7)安全管理記錄齊全、清楚,內(nèi)容齊全、記錄準(zhǔn)確、資料完整,組織對(duì)新進(jìn)人員進(jìn)行三級(jí)安全教育。檢査分包工人五證齊全(身份證、勞務(wù)證、居住證、上崗證、健康證), 參加五證驗(yàn)收工作。
8)做好施工現(xiàn)場(chǎng)標(biāo)準(zhǔn)化工作的牽頭組織。
9)對(duì)現(xiàn)場(chǎng)施工中違章指揮,違章作業(yè)者及時(shí)提出批評(píng), 并采取防范措施,實(shí)行對(duì)違章人員的處罰,有權(quán)停止其工作。
10)一旦發(fā)生事故,采取應(yīng)急措施,搶救傷員,保護(hù)現(xiàn)場(chǎng), 參加調(diào)査, 及時(shí)向上一級(jí)匯報(bào)事故情況, 上交原始事故記錄。
7、班組長安全生產(chǎn)職責(zé))對(duì)班組的安全生產(chǎn)負(fù)總的責(zé)任。
2)組織班組安全作業(yè),模范遵守安全生產(chǎn)規(guī)章制度。
3)安排生產(chǎn)任務(wù)時(shí),認(rèn)真進(jìn)行安全技術(shù)交底,嚴(yán)格執(zhí)行本工種安全操作規(guī)程, 有權(quán)拒絕違章指揮。
4)上工前要對(duì)所使用的機(jī)具、設(shè)備、防護(hù)用具及作業(yè)環(huán)境進(jìn)行安全檢査,發(fā)現(xiàn)問題立即采取整改措施,及時(shí)消除事故隱患。
5)組織班組安全活動(dòng),開好班前安全生產(chǎn)會(huì),并根據(jù)作業(yè)環(huán)境和職工的思想、體質(zhì)、技術(shù)狀況合理分配生產(chǎn)任務(wù)。
6)發(fā)生工傷事故立即搶救,及時(shí)報(bào)告并保護(hù)現(xiàn)場(chǎng)。
7)認(rèn)真開展“三上崗一講評(píng)”活動(dòng),做好上崗記錄,并 以此作為任務(wù)單結(jié)算及主要附件。
8、安全工人安全生產(chǎn)職責(zé)
1)白覺遵守勞動(dòng)紀(jì)律和安全生產(chǎn)規(guī)章制度。不違章作業(yè), 有權(quán)拒絕違章指揮, 并應(yīng)及時(shí)制止周圍人員的違章行為。
2)正確使用勞動(dòng)防護(hù)用品和安全防護(hù)裝置,注意愛護(hù)保養(yǎng)好工具、設(shè)備。
3)每天對(duì)本人施工場(chǎng)所進(jìn)行安全檢査,消除事故隱患。
4)參加安全活動(dòng),提出改進(jìn)安全管理、消除事故隱患的 建議。)認(rèn)真學(xué)習(xí)工種安全操作規(guī)程和技術(shù)。
6)發(fā)生工傷事故,及時(shí)進(jìn)行搶救和向上級(jí)匯報(bào)。
7)認(rèn)真參加項(xiàng)目的“周一活動(dòng)”和班組“三上崗”活動(dòng)。
8)根據(jù)工程的具體情況制定安全技術(shù)的具體措施及安全紀(jì)律的獎(jiǎng)懲制度(具體由公司工程部安全總負(fù)責(zé)和項(xiàng)目專職安全員制定);
9)對(duì)各工種和各施工班組制定安全技術(shù)規(guī)程(由項(xiàng)目專職安全員制定), 由安全員對(duì)各工種及各施工班組組長、組員進(jìn)行安全交底, 并做好記錄和組員簽字。
10)對(duì)現(xiàn)場(chǎng)的吊裝設(shè)備、機(jī)械設(shè)備、電氣設(shè)備、腳手架制定安全技術(shù)規(guī)程(由項(xiàng)目專職安全員制定), 由安全員帶隊(duì)定期檢査,并制定完善齊全的安全臺(tái)賬。)認(rèn)真貫徹執(zhí)行國家有關(guān)安全生產(chǎn)法規(guī), 認(rèn)真貫徹執(zhí)行 濟(jì)南市有關(guān)建筑施工安全規(guī)程。同時(shí)結(jié)合本工程特點(diǎn),制定安全生產(chǎn)制度和獎(jiǎng)罰條例, 并認(rèn)真執(zhí)行。
12)樹立“安全第一”的思想,堅(jiān)持預(yù)防為主的方針,對(duì)職工經(jīng)常進(jìn)行安全生產(chǎn)教育,定期開展安全活動(dòng),充分認(rèn)識(shí)安全生產(chǎn)的重要性,掌握一定的安全生產(chǎn)知識(shí),對(duì)職工進(jìn)行安全生產(chǎn)培訓(xùn)。在安全生產(chǎn)上,一定要克服麻痹思想。
13)用好安全“三寶”,所有進(jìn)入現(xiàn)場(chǎng)人員必須戴安全帽, 高空作業(yè)人員必須系好安全帶,(安全帽、安全帶必須經(jīng)安檢部門檢測(cè)認(rèn)證)穿軟底防滑絕緣鞋。掛安全網(wǎng),設(shè)醒目標(biāo)志。
14)保證安全施工、文明施工,避免在施工過程中發(fā)生任何安全事故, 負(fù)責(zé)按合同中的相關(guān)內(nèi)容。
1, 2施工用電安全措施
保證正確可靠的接地及接零保護(hù)措施。
電氣設(shè)備的裝置、安全、防護(hù)、使用、操作與維修必須符合JGJ46-535《施工現(xiàn)場(chǎng)臨時(shí)用電安全技術(shù)規(guī)范》規(guī)定要求。
醒目的電氣安全標(biāo)志, 操作規(guī)程牌。
必須經(jīng)常對(duì)現(xiàn)場(chǎng)的電氣線路, 各臺(tái)設(shè)備進(jìn)行安全檢査,電氣絕緣、接地電阻、電保護(hù)器、桿保險(xiǎn)等是否完好進(jìn)行檢査。査出的問題要做到定人、定時(shí)、定措施,及時(shí)整改。
夜間施工應(yīng)有足夠的照明且應(yīng)有電工現(xiàn)場(chǎng)值班監(jiān)護(hù), 以防發(fā)生意外。
安裝維修或拆除臨時(shí)用電工程, 必須由電工完成。主管現(xiàn)場(chǎng)電氣的安全技術(shù)檔案的建立與管理。《電工維修工作記錄》由指定電工代管。
配電必須采取絕緣導(dǎo)線,距地面不得小于2.5M,采取防雨措施。
現(xiàn)場(chǎng)設(shè)總配電箱及分配箱,分配電箱連接開關(guān)箱。箱內(nèi)邊接線采用絕緣導(dǎo)線, 接頭不得松動(dòng), 不得有外露帶電部分。
1.3保護(hù)措施及實(shí)施措施
1、認(rèn)真貫徹執(zhí)行各項(xiàng)消防制度, 配備足夠的消防器材。
2、建立切實(shí)可行的防火安全制度,如火源、火種、易燃品使用保管等制度,組織落實(shí)定期、不定期的防火安全檢査, 督促隱患的及時(shí)整改,發(fā)動(dòng)全員做到“辭防、群治”。
3、堅(jiān)持科學(xué)管理、從嚴(yán)管理的原則,制定相關(guān)硬性制度:
a,嚴(yán)禁吸煙并采取罰款措施,發(fā)現(xiàn)吸煙當(dāng)場(chǎng)罰款;
b,禁止私拉電線、亂設(shè)爐灶;
c,堅(jiān)持用火中請(qǐng)制度,動(dòng)用明火或電氣焊作業(yè)時(shí),必須先開動(dòng)火證后作業(yè)的原則,并在用火時(shí)進(jìn)行安全交底,作業(yè)人員必須有操作證并設(shè)專人看火, 動(dòng)用明火或電氣焊作業(yè)時(shí),必須先清除現(xiàn)場(chǎng)的一切易燃物品后再進(jìn)行作業(yè),工作完畢后,認(rèn)真檢査動(dòng)火現(xiàn)場(chǎng),發(fā)現(xiàn)沒有問題方可高去;
d.未經(jīng)批準(zhǔn)禁止在建筑物內(nèi)調(diào)配油漆、汽油等易燃易爆 物品;
e.對(duì)持有勞動(dòng)局特種工證的電工、焊工等工種進(jìn)場(chǎng)前在進(jìn)行防火教育,上崗前進(jìn)行培訓(xùn),經(jīng)考試合格后方可上崗。
第二節(jié)
文明施工技術(shù)組織措施
我公司根據(jù)本工程特點(diǎn)及相關(guān)文件要求, 特制定以下文明施工措施,以確保本工程達(dá)到濟(jì)南市工地管理施工要求。
1.1現(xiàn)場(chǎng)施工文明管理措施
1、各施工隊(duì)在項(xiàng)目經(jīng)理的領(lǐng)導(dǎo)下進(jìn)行施工, 設(shè)專職質(zhì)量檢驗(yàn)員、現(xiàn)場(chǎng)施工技術(shù)員,安裝實(shí)行三檢制即“自檢、互檢、抽檢”,每一單項(xiàng)作業(yè)后要進(jìn)行三次復(fù)査,并做好記錄。
2、分項(xiàng)、分部、分層進(jìn)行自檢質(zhì)量評(píng)定,作好記錄,報(bào)請(qǐng)監(jiān)理及時(shí)復(fù)檢,經(jīng)簽字后妥善保存,以備驗(yàn)收時(shí)使用。
3、嚴(yán)格按照施工工藝規(guī)程安裝,不蠻干,安裝質(zhì)量包干到人或組并做好交底記錄, 以備檢査。
4、做到臨時(shí)設(shè)施齊全、布置合理、場(chǎng)地干凈。
5、作業(yè)現(xiàn)場(chǎng)工完場(chǎng)清,作業(yè)后不遺棄垃圾廢料在現(xiàn)場(chǎng)。
6、施工人員著裝統(tǒng)一,佩帶胸-~,進(jìn)入施工現(xiàn)場(chǎng)必須戴安全帽;
7、各項(xiàng)設(shè)施布置要按照施工總平面圖進(jìn)行規(guī)劃, 并由總包統(tǒng)一安排,做到布置安全及合理,場(chǎng)地干凈;
8、各種材料要分區(qū)堆碼整齊,分列排放,并掛上醒目的標(biāo)志牌,嚴(yán)禁煙火,確保安全,同時(shí)確保通道及出入口暢通無阻;
9、各作業(yè)層要工完料清,未使用完的材料必須堆放整齊, 保持施工現(xiàn)場(chǎng)的整潔;
10、垃圾要集中堆放及集中處理,排水溝要保持暢通;
1、施工現(xiàn)場(chǎng)的各種消防設(shè)施要按要求進(jìn)行設(shè)置, 并有專人管理,嚴(yán)禁抽煙,做到安全無隱患,防污染,防磕碰損傷;
12、進(jìn)出工地的施工人員均佩戴施工現(xiàn)場(chǎng)出入證,穿工作服,絕不帶外來人員進(jìn)入施工現(xiàn)場(chǎng);
13、施工人員要文明待人,嚴(yán)禁打架斗毆及惡語傷人,語言文明, 作風(fēng)端正, 連守當(dāng)?shù)刂伟补芾項(xiàng)l例;
14、宿舍內(nèi)要統(tǒng)一安裝照明設(shè)計(jì), 嚴(yán)禁亂拉亂接用電設(shè)備;
15、積極配合總包方安排的定期文明施工的檢査和評(píng)比,虛心接受批評(píng),并積極改正;與其他專業(yè)公司交又作業(yè)時(shí), 相互配合,加強(qiáng)合作,出現(xiàn)問題時(shí),共同協(xié)商,友好解決。
16、工程材料存放地點(diǎn)應(yīng)選擇通風(fēng)干燥之處,避免材料受潮變質(zhì)以至報(bào)廢。
17、認(rèn)真作好文明施工的各項(xiàng)具體工作,并服從業(yè)主和社會(huì)管理部門的監(jiān)督和管理, 同時(shí)承擔(dān)所需交納的費(fèi)用。
1.2文明施工保證措施
1、員工進(jìn)施工現(xiàn)場(chǎng)前有關(guān)培訓(xùn)。
2、對(duì)每個(gè)施工人員進(jìn)行相關(guān)的法律、法規(guī)教育,使他們都懂法、守法、遵守當(dāng)?shù)氐囊?guī)章制度。
3、根據(jù)文明施工現(xiàn)場(chǎng)的有關(guān)要求組織施工, 并依據(jù)創(chuàng)建衛(wèi)生城及文明施工工地的要求組織生活區(qū)的管理。
4、培養(yǎng)員工言語文明,無打架斗毆現(xiàn)象,工作日不準(zhǔn)飲酒。
5、全員必須堅(jiān)守工作崗位,不允許穿崗,因故離崗時(shí)必須向現(xiàn)場(chǎng)負(fù)責(zé)人請(qǐng)假, 施工時(shí)員工必須精力飽満, 不允許帶思想情緒上崗,有不良精神狀態(tài)者,嚴(yán)禁高空作業(yè)。
6、任何施工人員出入施工現(xiàn)場(chǎng),必須佩帶有效身份標(biāo)志, 未經(jīng)有關(guān)部門批準(zhǔn), 不得私白帶入外人到工地參觀, 拍照。
7、施工人員按規(guī)定統(tǒng)一安排食宿。
8、由技術(shù)人員講解相關(guān)的標(biāo)準(zhǔn)規(guī)范、施工工藝規(guī)范,使每個(gè)施工工人都必須熟知施工圖紙, 了解本工程產(chǎn)品的種類、規(guī)格、技術(shù)難點(diǎn)、質(zhì)量關(guān)鍵部位施工要求,及各工種的特殊性和相互關(guān)系及操作規(guī)程。
9、向所有施工作業(yè)人員進(jìn)行文明施工技術(shù)交底。
第三篇:門窗節(jié)能專項(xiàng)
一、工程概況
豹澥新鎮(zhèn)A地塊四期58#、62#、63#、67#、68#、69#樓位于豹澥新鎮(zhèn)農(nóng)民還建區(qū)。58#樓為6層框架結(jié)構(gòu),建筑面積為4848.6㎡; 62#樓為框剪9層,建筑面積為6473㎡; 63#樓為框剪11層,建筑面積為5312㎡; 67#樓為11層框剪結(jié)構(gòu),建筑面積為 7948㎡; 68#樓為框剪11層,建筑面積為6996.5㎡; 69#樓為框剪11層,建筑面積為7005.22㎡??蚣芸拐鸬燃?jí)四級(jí),抗震設(shè)防烈度為6度,抗震設(shè)防類別為丙類;58#、62#樓基礎(chǔ)為長螺旋鉆孔壓灌砼樁基礎(chǔ)、67#樓基礎(chǔ)為部分人工挖孔樁基及部分獨(dú)立基礎(chǔ),63#68#69#樓為地下室(地下室由其他單位施工)。
二、編制依據(jù)
1、《住宅建筑節(jié)能工程施工質(zhì)量驗(yàn)收規(guī)程》DBJ08-113-2005
2、《夏熱冬冷地區(qū)居住建筑節(jié)能設(shè)計(jì)標(biāo)準(zhǔn)》JGJ134-2001
3、《國家建筑標(biāo)準(zhǔn)設(shè)計(jì)圖集》03J930-1
4、《民用建設(shè)節(jié)能工程施工質(zhì)量驗(yàn)收規(guī)程》DGJ32/J 19-2006
5、《民用建設(shè)節(jié)能工程現(xiàn)場(chǎng)熱工性能檢測(cè)標(biāo)準(zhǔn)》DGJ32/J 23-2006
6、《建筑裝飾裝修工程質(zhì)量驗(yàn)收規(guī)范》GB50210-2001
7、《建筑工程施工質(zhì)量驗(yàn)收統(tǒng)一標(biāo)準(zhǔn)》GB50300-2001
8、《砌體工程施工質(zhì)量驗(yàn)收規(guī)范》GB50203-2002
9、《混凝土結(jié)構(gòu)工程施工質(zhì)量驗(yàn)收規(guī)范》GB50204-2002
10、《外墻內(nèi)保溫板質(zhì)量檢驗(yàn)評(píng)定標(biāo)準(zhǔn)》DBJ01-30-2000
(1)材料的選用 本工程使用的各種材料,均根據(jù)施工圖紙要求選定。
(2)原材料質(zhì)量控制 在購料前,工程技術(shù)人員首先對(duì)材料的材質(zhì)及性能進(jìn)行詳細(xì)的檢查、檢測(cè),符合要求 始進(jìn)行訂貨。材料進(jìn)場(chǎng)后質(zhì)量部門對(duì)材料的表觀質(zhì)量及尺寸按檢驗(yàn)標(biāo)準(zhǔn)進(jìn)行檢驗(yàn),各種材 料生產(chǎn)廠家的產(chǎn)品質(zhì)量證明書,檢查確認(rèn)合格后方可進(jìn)行加工。關(guān)鍵性材料(譬如∶隔熱 條、五金件、中空玻璃等)除檢查上述證明外,還要檢查其保用年限是否滿足設(shè)計(jì)要求。
(3)產(chǎn)品加工與運(yùn)輸 加工前檢查加工現(xiàn)場(chǎng)使用的各類量具是否均經(jīng)過檢測(cè)部門檢測(cè)并在有效期內(nèi),確保測(cè) 量工具的精度;其他工具定期或隨時(shí)檢查。嚴(yán)格按業(yè)主審批后的設(shè)計(jì)施工圖紙進(jìn)行門窗框、門窗扇及玻璃加工。零部件安裝前檢驗(yàn)其質(zhì)量及型號(hào)是否符合現(xiàn)行有關(guān)標(biāo)準(zhǔn)及業(yè)主招標(biāo)文件的規(guī)定,不符 合或不合格的禁用。各構(gòu)件的加工精度允許偏差嚴(yán)格按行業(yè)標(biāo)準(zhǔn)執(zhí)行。加工完畢的構(gòu)件,按其5%抽樣檢查,且每種不得少于5 件;當(dāng)其中一件不合格時(shí),加倍抽檢,復(fù)檢合格后方可驗(yàn)收。成品、半成品進(jìn)入施工現(xiàn)場(chǎng)時(shí),應(yīng)附有出廠合格證及檢驗(yàn)人員的簽章。
(4)
成品、半成品包裝運(yùn)輸 因?yàn)殇X合門窗是用來作裝飾用的,因此對(duì)出廠的門窗框、門窗扇等均采取用工程保護(hù) 膠帶粘貼在材料表面,帶包裝運(yùn)到現(xiàn)場(chǎng)。以防止在運(yùn)輸、安裝后受到磕、碰、磨損等損害。玻璃運(yùn)到工地現(xiàn)場(chǎng)后,放到作業(yè)棚或倉庫內(nèi)進(jìn)行特殊保護(hù)。所有材料運(yùn)到工地現(xiàn)場(chǎng),都將放在通風(fēng)避雨的地方臨時(shí)存放。吊運(yùn)組裝門窗,應(yīng)用非金屬繩索捆綁,嚴(yán)禁碰撞、擠壓,以防門窗損傷和變形。型材包裝后裝車時(shí),應(yīng)沿車箱長度方向擺放;擺放要嚴(yán)密整齊、不留空隙,防止車輛 行駛中發(fā)生攛動(dòng)。型材擺放高度超出車箱板時(shí),須捆扎牢固、防止脫落;型材與鋼件等硬 質(zhì)材料混裝時(shí),必須采取有效措施進(jìn)行隔離。玻璃裝車時(shí)需要立放,下部墊草墊,兩塊玻璃之間用膠條隔離,根據(jù)需要每20塊左右 的玻璃應(yīng)捆扎一次,以確保車輛行駛中的震動(dòng)和晃動(dòng)不致造成玻璃破損。運(yùn)輸途中應(yīng)盡量保持車輛行駛平穩(wěn),路況不好時(shí)應(yīng)注意慢行。對(duì)于組裝后的門窗框、門窗扇等尺寸較小者可用編織帶包裹,尺寸較大不便包裹者,可用厚膠條分隔,避免相互磕碰。
(5)現(xiàn)場(chǎng)安裝 塑鋼門窗施工工藝流程 準(zhǔn)備工作→測(cè)量、放線→確認(rèn)安裝基準(zhǔn)→安裝門窗框→校正→固定門窗框→土建抹灰 收口→安裝門窗扇→填充發(fā)泡劑→門窗外周圈打膠→安裝門窗五金件→清理、清洗門窗→ 檢查驗(yàn)收
(6)
施工準(zhǔn)備 ① 施工組織準(zhǔn)備 安裝作業(yè)人員在接到圖紙后,先對(duì)圖紙進(jìn)行熟悉了解。不僅要對(duì)門窗施工圖要了解,對(duì)土建建筑結(jié)構(gòu)圖也需了解,主要了解以下幾個(gè)方面內(nèi)容: 對(duì)圖紙內(nèi)容進(jìn)行全面的了解; 找出設(shè)計(jì)的主導(dǎo)尺寸(分格),不可調(diào)節(jié)尺寸和可調(diào)節(jié)尺寸; 對(duì)照土建圖紙驗(yàn)證施工方案及設(shè)計(jì); 了解立面變化的位置、標(biāo)高變化的特點(diǎn)。② 上墻安裝前,首先檢查洞口表面平整度、垂直度應(yīng)符合施工規(guī)范,對(duì)土建提供的 基準(zhǔn)線進(jìn)行復(fù)核。事先與土建施工隊(duì)協(xié)商安裝時(shí)的上墻步驟、技術(shù)要求等,做到相互配合,確保產(chǎn)品安裝質(zhì)量。③ 根據(jù)土建施工彈出的門窗安裝標(biāo)高控制線及平面中心位置線測(cè)出每個(gè)門窗洞口的平面位置、標(biāo)高及洞口尺寸等偏差。要求洞口寬度、高度允許偏差±10mm,洞口垂直水平度偏差全長最大不超過10mm。否則要求土建施工隊(duì)在門窗框安裝前對(duì)超差洞口進(jìn)行修補(bǔ)。④ 根據(jù)實(shí)測(cè)的門窗洞口偏差值,進(jìn)行數(shù)理統(tǒng)計(jì),根據(jù)統(tǒng)計(jì)結(jié)果最終確定每個(gè)門窗安 裝的平面位置及標(biāo)高。a.門窗安裝平面位置的確定 根據(jù)每層同一部位門窗洞口平面位置偏差統(tǒng)計(jì)數(shù)據(jù),求得該部位門窗平面位置偏差值 的平均數(shù)V1(本值有方向);然后統(tǒng)計(jì)出門窗洞口中心線位置偏差出現(xiàn)概率最大的偏差值 Q1。當(dāng)出現(xiàn)概率最大的偏差值Q1的出現(xiàn)概率小于50%時(shí),門窗安裝平面位置為:門窗洞中 心線理論位置加上門窗洞平面位置偏差值的平均數(shù)V1;當(dāng)出現(xiàn)概率最大的偏差值Q1的出現(xiàn) 概率大于50%時(shí),門窗安裝平面位置為:門窗洞中心線理論位置加上出現(xiàn)概率最大的偏差 值Q1。b.門窗安裝標(biāo)高確定 門窗的安裝標(biāo)高,每層一確定,且確保同一層不同類型門窗的門窗楣在同一標(biāo)高。由門窗的標(biāo)高控制線測(cè)出的門窗洞上口標(biāo)高偏差值A(chǔ)。根據(jù)本樓層所有門窗標(biāo)高偏差 值求得偏差值平均數(shù)V2(本值有方向)及出現(xiàn)概率最大的偏差值Q2。當(dāng)出現(xiàn)概率最大的偏 差值Q2的出現(xiàn)概率小于50%時(shí),本樓層門窗的安裝標(biāo)高為:門窗洞理論位置標(biāo)高加上門窗 洞標(biāo)高偏差值的平均數(shù)V2;當(dāng)出現(xiàn)概率最大的偏差值Q2的出現(xiàn)概率大于50%時(shí),本樓層門 窗的安裝標(biāo)高為:門窗洞理論位置標(biāo)高加上出現(xiàn)概率最大的偏差值Q2。⑤ 逐個(gè)清理洞口。
(7)人員準(zhǔn)備 ① 施工人員 安裝人員都必須經(jīng)過專業(yè)技術(shù)培訓(xùn)。② 崗前培訓(xùn) 工人進(jìn)場(chǎng)后由項(xiàng)目經(jīng)理對(duì)進(jìn)場(chǎng)全部施工人員講解本工程的重要性,使全體施工人員了 解工程大致情況及工地的各項(xiàng)要求。由施工員向操作工人詳細(xì)講解相關(guān)的標(biāo)準(zhǔn)、規(guī)范及施工現(xiàn)場(chǎng)安全管理有關(guān)規(guī)定及安全 生產(chǎn)準(zhǔn)則等。由技術(shù)員向施工人員進(jìn)行施工方案、技術(shù)、安全等方面的交底,使工人在施工前做到 心中有數(shù),熟知各個(gè)環(huán)節(jié)的施工質(zhì)量標(biāo)準(zhǔn),以做到在施工過程中嚴(yán)格控制。
(8)門窗框安裝 門窗框在外墻保溫及室內(nèi)抹灰施工前進(jìn)行。按照施工計(jì)劃將即將安裝的門窗框運(yùn)到指 定位置,同時(shí)注意其表面的保護(hù)。將固定片鑲?cè)虢M裝好的門窗框,固定片的位置應(yīng)距門窗角、中豎框、中橫框150~ 2OOmm,固定片之間的間距應(yīng)不大于60O㎜。不得將固定片直接裝在中橫框、中豎框的擋頭 上。根據(jù)設(shè)計(jì)圖紙及門窗扇的開啟方向,確定門窗框的安裝位置,并把門窗框裝入洞口,并使其上下框中線與洞口中線對(duì)齊。安裝時(shí)應(yīng)采取防止門窗變形的措施。無下框平開門應(yīng) 使兩邊框的下腳低于地面標(biāo)高線3Omm。帶下框的平開門或推拉門應(yīng)使下框低于地面標(biāo)高線 lOmm。然后將上框的一個(gè)固定片固定在墻體上,并應(yīng)調(diào)整門框的水平度、垂直度和直角度,用木楔臨時(shí)固定。當(dāng)下框長度大于0.9m時(shí),其中間也用木楔塞緊。然后調(diào)整垂直度、水平度及直角度。
(9)門窗扇、五金件安裝 工藝流程:施工準(zhǔn)備→檢查驗(yàn)收→將門窗扇按層次擺放→初安裝→調(diào)整→固定→自檢 →報(bào)驗(yàn)。門窗扇在外保溫施工完閉、外墻涂料施工前進(jìn)行安裝。門窗扇可以先在地面組裝好,也可以在門窗框安裝完畢驗(yàn)收后再行安裝。用垂直升降設(shè)備將門窗扇、玻璃先后運(yùn)輸?shù)叫璋惭b的各樓層,由工人運(yùn)到安裝部位。上墻前對(duì)組裝的門窗進(jìn)行復(fù)查,如發(fā)現(xiàn)有組裝不合格者,或有嚴(yán)重碰、劃傷者,缺 少附件等應(yīng)及時(shí)加以處理。根據(jù)圖紙要求安裝門窗扇;框與門窗扇配合緊密、間隙均勻;門窗扇與框的搭接寬度 允許偏差±1mm。門窗附件必須安裝齊全、位置準(zhǔn)確、安裝牢固,開啟或旋轉(zhuǎn)方向正確、啟閉靈活、無 噪聲,承受反復(fù)運(yùn)動(dòng)的附件在結(jié)構(gòu)上應(yīng)便于更換。
(10)
玻璃安裝及打膠 固定門窗玻璃,需門窗框抹灰養(yǎng)生后,嚴(yán)格按照《門窗工藝標(biāo)準(zhǔn)》用調(diào)整墊塊將玻璃 調(diào)整墊好。安裝前將合頁調(diào)整好,控制玻璃兩側(cè)預(yù)留間隙基本一致,然后安裝扣條。安裝玻璃時(shí) 在玻璃上下用塑料墊塊塞緊,防止門窗扇變形;裝配后應(yīng)保證玻璃與鑲嵌槽間隙,并在主 要部位裝有減振墊塊,使其能緩沖啟閉力的沖擊。清理和修型。注發(fā)泡劑、打膠等密封工作在保溫面層及主框施工完畢外墻涂料施工前進(jìn)行。首先用壓縮空氣清理門窗框周邊預(yù)留槽內(nèi)的所有垃圾,然后向槽內(nèi)打發(fā)泡劑,并使發(fā) 泡劑自然溢出槽口;清理溢出的發(fā)泡劑并使其沿主框周圈成寬×深為10mm×10mm的凹槽。然后將基層表面塵土、雜物等清理干凈,放好保護(hù)膠帶后進(jìn)行打膠。注膠完成后將保護(hù)膠 帶撕掉、擦凈門窗主框、窗臺(tái)表面(必要時(shí)可以用溶劑擦拭)。注膠后注意保養(yǎng),膠在完 全固化前不要粘灰和碰傷膠縫。最后做好清理工作。
(11)
門窗框、扇配合嚴(yán)密,間隙均勻。其扇與框的搭接寬度允許偏差±1mm。門窗用附件安裝位置正確,齊全牢固,應(yīng)起到各自的作用,具有足夠的強(qiáng)度,啟閉靈 活,無噪聲、承受反復(fù)運(yùn)動(dòng)的附件,在結(jié)構(gòu)上應(yīng)便于更換。門窗用玻璃、五金、密封等附件,其質(zhì)量應(yīng)與門窗的質(zhì)量等級(jí)相適應(yīng)。裝配后應(yīng)保證玻璃與鑲嵌槽間隙,并在主要部位裝有減振墊塊,使其能緩沖啟閉力的 沖擊。門窗的品種、規(guī)格、尺寸、性能、開啟方向、安裝位置、連接方式及塑鋼門窗的型材 壁厚應(yīng)符合設(shè)計(jì)要求。鋁合金門窗框的安裝必須牢固。預(yù)埋件數(shù)量、位置、埋設(shè)方式、與框的連接方式必須 符合設(shè)計(jì)要求。門窗扇安裝必須牢固,并應(yīng)開啟靈活、關(guān)閉嚴(yán)密、無倒翹。門窗扇固定玻璃的橡膠密封條應(yīng)安裝完好,不得出現(xiàn)皺褶、脫槽、兩方向不交圈等。門窗框(含拼接料)正、側(cè)面的垂直度偏差每米不大于2mm。門窗框(含拼接料)的水平度偏差每米不大于1.5mm。門窗橫框的標(biāo)高與基線比較偏差不大于5mm。轉(zhuǎn)角門窗應(yīng)在同一設(shè)計(jì)立面內(nèi),相鄰框在同一立面偏差不大于1mm,相鄰門窗在同一 立面內(nèi)偏差不大于5mm。各層門窗側(cè)面應(yīng)在同一垂直直線內(nèi),總差不大于5mm。門窗框?qū)蔷€里角長度小于或等于2000mm時(shí),對(duì)角線允差不大于1.0mm,對(duì)角線里角 長度大于2000mm時(shí),對(duì)角線之差不大于1.5mm。平開門窗應(yīng)關(guān)閉嚴(yán)密、扇與框搭接量應(yīng)均勻,允許偏差1mm。平開門窗同樘相鄰扇橫端高度允許偏差2mm。型材表面不應(yīng)有新的碰傷,不應(yīng)有腐蝕污染。
四、驗(yàn) 收 每道工序施工時(shí)班組嚴(yán)格自檢。項(xiàng)目質(zhì)檢員隨時(shí)檢查。每一分項(xiàng)安裝完畢提交總包、監(jiān)理、業(yè)主檢查驗(yàn)收。
五、成品保護(hù)措施
(1)加工階段的防護(hù) 型材加工、存放所需臺(tái)架等均墊膠墊等軟質(zhì)物。型材周轉(zhuǎn)車、工具等凡與型材接觸部位均以膠墊防護(hù),不允許型材與鋼質(zhì)件或其他硬 質(zhì)物品直接接觸。加工完的門窗框立放,下部墊木方。玻璃運(yùn)輸用玻璃架上采取墊膠皮等防護(hù)措施。玻璃加工平臺(tái)需平整,并墊毛氈等軟質(zhì)物。(2)包裝階段的防護(hù) 型材包裝采用先貼保護(hù)膠帶,然后外包編織帶的方法實(shí)施保護(hù)。包裝前將其表面及腔 內(nèi)碎屑清凈,防止劃傷型材;當(dāng)包裝過程中發(fā)現(xiàn)型材變形、表面劃傷、氣泡、腐蝕等缺陷 或其他產(chǎn)品質(zhì)量問題時(shí)應(yīng)隨即抽出,單獨(dú)存放,不得出廠。對(duì)于截面尺寸較小的型材,應(yīng)視具體尺寸用編織帶成捆包扎;不同規(guī)格、尺寸、型號(hào) 的型材不能混在一起包裝;包裝應(yīng)嚴(yán)密、避免在周轉(zhuǎn)運(yùn)輸中散包。包裝完成后,如不能立即裝車發(fā)送現(xiàn)場(chǎng),要在指定地點(diǎn)擺放整齊存放。(3)施工現(xiàn)場(chǎng)的防護(hù) 未上墻的框料,在工地臨時(shí)倉庫存放,要求按類別、尺寸擺放整齊。框料上墻前,撤去包裹編織帶;但框料表面粘貼的工程保護(hù)膠帶不得撕掉,以防止室 內(nèi)外抹灰、刷涂料時(shí)污染框料。門窗框、扇表面的保護(hù)膠帶應(yīng)在本層外墻涂料、室內(nèi)抹灰 完畢及外腳手架拆除后撕掉。門窗框與墻面打密封膠及噴涂外墻涂料時(shí),應(yīng)在玻璃、門窗框及窗扇上貼分色紙,防 止污染框料及玻璃。加強(qiáng)現(xiàn)場(chǎng)監(jiān)管,防止拆除腳手架時(shí)碰撞門窗框料表面,以防造成變形及表層損壞。在塑鋼門窗附近進(jìn)行電焊或使用其他熱源,必須采取適當(dāng)措施,以防造成塑鋼型材表 層受損。
六、安全生產(chǎn)、文明施工措施 安全生產(chǎn)
(1)安全生產(chǎn)及文明施工措施 特殊工種(電工)持證上崗。進(jìn)入現(xiàn)場(chǎng)后必須戴好安全帽。在沒有扶手和設(shè)有簡易扶手的樓梯和陽臺(tái)上通過時(shí),應(yīng)先試驗(yàn)其牢固程序,從靠近墻 的一側(cè)通過。2人以上共同操作時(shí)應(yīng)協(xié)調(diào)一致,互相合作。施工安裝時(shí),不得違章操作,遇有特殊情況,須經(jīng)有關(guān)部門領(lǐng)導(dǎo)同意后方可施工。在使用工具前,檢查其安全性能是否完好,不具備完好標(biāo)準(zhǔn)的工具嚴(yán)禁使用。工地內(nèi)架設(shè)的電線,必須征得有關(guān)部門的同意,并符合用電規(guī)章制度。進(jìn)入現(xiàn)場(chǎng)施工時(shí),首先查看現(xiàn)場(chǎng)電源、線路、電閘的保險(xiǎn)裝置。使用帶電工具應(yīng)按使 用說明書接好地線,接通電源后,經(jīng)電工檢查后方可使用?,F(xiàn)場(chǎng)施工時(shí),應(yīng)嚴(yán)格遵守國家有關(guān)防火條例。收工時(shí)要切斷電源,并檢查施工現(xiàn)場(chǎng),消除隱患。(2)現(xiàn)場(chǎng)文明施工管理制度 在工作現(xiàn)場(chǎng),全體工作人員必須戴安全帽及設(shè)置必要的安全標(biāo)志。任何人不得隨地大小便,不得在墻上及建筑物內(nèi)寫畫。工作時(shí)間禁止喝酒,施工現(xiàn)場(chǎng)及公共場(chǎng)所嚴(yán)禁吸煙。施工現(xiàn)場(chǎng)物品要擺放有序,不得亂放。不得任意向下扔擲物品,嚴(yán)防物品傷人。廢棄物品統(tǒng)一收集,統(tǒng)一處理,要保持工地衛(wèi)生。工作現(xiàn)場(chǎng)嚴(yán)格執(zhí)行防火、消防制度,嚴(yán)防火災(zāi)發(fā)生。工作現(xiàn)場(chǎng)嚴(yán)格執(zhí)行安全制度、安全技術(shù)操作規(guī)程,杜絕人身事故發(fā)生。注意用電安全,防止觸電事故發(fā)生。工作后清理工作現(xiàn)場(chǎng),檢查有無火源。與有關(guān)單位配合及協(xié)調(diào)時(shí)應(yīng)注意團(tuán)結(jié),有問題及時(shí)匯報(bào),不得自行其事。工作現(xiàn)場(chǎng)嚴(yán)禁戲耍打鬧。對(duì)于不聽從管理,不服從指揮,違反現(xiàn)場(chǎng)管理制度者,停止其工作,并清退出場(chǎng)。(3)施工安全制度 安全為了生產(chǎn),生產(chǎn)必須安全,凡參加施工人員,要熟悉本工種安全技術(shù)規(guī)程,在操 作中,應(yīng)堅(jiān)守工作崗位,嚴(yán)禁酒后操作。進(jìn)入施工現(xiàn)場(chǎng),必須戴安全帽,禁止穿拖鞋。高空作業(yè)必須系好安全帶。在安全措施不落實(shí),存在安全隱患時(shí),工人有權(quán)拒絕施工。不得擅自拆動(dòng)施工現(xiàn)場(chǎng)腳手架、防護(hù)設(shè)施、安全標(biāo)志和警示牌。施工現(xiàn)場(chǎng)嚴(yán)禁吸煙以防火災(zāi)發(fā)生。施工現(xiàn)場(chǎng)嚴(yán)禁戲耍打鬧,以防碰撞現(xiàn)象發(fā)生。高空作業(yè)人員衣著要靈便,所放材料要擺放平穩(wěn),工具要隨手放入工具袋內(nèi),上下傳 遞物件禁止拋擲。惡劣氣候影響施工安全時(shí),禁止露天高空作業(yè)。玻璃運(yùn)輸及大件整體裝卸必須指定專人負(fù)責(zé),嚴(yán)格遵守玻璃施工及裝卸有關(guān)規(guī)定。電焊時(shí)應(yīng)嚴(yán)格遵守有關(guān)規(guī)定,注意防火,并清除易燃易爆物品。所有人員應(yīng)牢固樹立安全第一的思想,遵守安全技術(shù)操作規(guī)程。對(duì)于不聽從指揮,盲目操作,違章作業(yè),安全人員有權(quán)停止其工作。(4)消防制度 全體工作人員必須遵守市政府有關(guān)規(guī)定,遵守國家法規(guī)法律,遵守工地規(guī)定,以預(yù)防 為主,杜絕火災(zāi)事故發(fā)生。施工中以預(yù)防為主,工作前檢查現(xiàn)場(chǎng),將一切可燃物品移至工作區(qū)外。施工中設(shè)專兼職消防員各1名。專職消防員負(fù)責(zé)工作前的消防器材的準(zhǔn)備及工作中器 材的使用;兼職消防員負(fù)責(zé)工作前易燃物品的轉(zhuǎn)移與防護(hù),工作中的及時(shí)檢查,工作后的 現(xiàn)場(chǎng)清理。易燃易爆物品由專人負(fù)責(zé),工作后統(tǒng)一收回保管。工作現(xiàn)場(chǎng)禁止吸煙。電源電線每天進(jìn)行檢查,嚴(yán)防發(fā)生漏電起火。
第四篇:鋁合金門窗工程 施工方案
鋁合金門窗工程
施工方案
編制: 審核: 批準(zhǔn):
一、工程概況
本工程為位于八冶公租房,鋁合金門窗面積約為1300平方米。
二、工程進(jìn)度計(jì)劃
1.合同簽訂后,現(xiàn)場(chǎng)具備安裝條件,窗外框配合土建進(jìn)度進(jìn)場(chǎng)安裝。窗扇安裝根據(jù)甲方總進(jìn)度計(jì)劃要求,并爭取提前竣工。
2.施工期間,若因甲方或業(yè)主的要求須作設(shè)計(jì)變更,工程數(shù)量有所增加或減少,或工作品質(zhì)有所改變等,則其工期將相應(yīng)進(jìn)行增減。
3.施工期間,若工程未如甲方代表的要求,我方將24小時(shí)內(nèi)加派人手或機(jī)械等加開夜班或節(jié)假日施工以補(bǔ)償落慢之進(jìn)度。
三、施工準(zhǔn)備
1.門窗安裝應(yīng)在洞口尺寸符合規(guī)定且驗(yàn)收合格,并辦好工種間交接手續(xù)后,方可進(jìn)行,具體注意情況如下: ① 門窗應(yīng)采用預(yù)留洞口法安裝,不得采用邊安裝邊砌口或先安裝后砌口的施工方法。安裝前洞口需進(jìn)行一道水泥砂漿的粉刷,以避免雨水滲入磚墻內(nèi),同時(shí)得到光潔的洞口表面和規(guī)整的洞口尺寸,便于窗框的安裝和保溫材料的填充。門窗洞口尺寸應(yīng)符合現(xiàn)行國家標(biāo)準(zhǔn)《建筑門窗洞口尺寸系列》(GB5824)的規(guī)定。② 門窗及玻璃的安裝應(yīng)在墻體濕作業(yè)且硬化后進(jìn)行,當(dāng)需要在濕作業(yè)前安裝時(shí),應(yīng)采取保護(hù)措施。③ 當(dāng)門窗采用預(yù)埋小紅磚法與墻體連接時(shí),其位置應(yīng)滿足設(shè)計(jì)要求。④ 對(duì)于同一類型的門窗及其相鄰的上、下、左、右洞口應(yīng)保持通線,洞口應(yīng)橫平豎直;對(duì)于高級(jí)裝飾工程及放置過梁的洞口,應(yīng)做洞口樣板。⑤ 洞口寬度與高度的允許尺寸偏差應(yīng)符合表1的規(guī)定。洞口寬度與高度的允許偏差(mm)洞口寬度高度 <2400 2400~4800 >4800 未粉刷墻面 ±10 ±15 ±20 已粉刷墻面 ±5 ±10 ±15預(yù)埋件的數(shù)量應(yīng)和固定片的數(shù)量一致;其標(biāo)高和坐標(biāo)位置應(yīng)正確。預(yù)埋件的標(biāo)高偏差不大于10mm,預(yù)埋件位置和設(shè)計(jì)位置的偏差不大于20 mm。
2.門窗應(yīng)放置在清潔平整的地方,且應(yīng)避免日曬雨淋,并不得與腐蝕性物質(zhì)接觸。門窗不應(yīng)直接接觸地面,下部應(yīng)放置墊木,墊高不小于5cm。并均應(yīng)立放,不得平放或斜放,立放角度不應(yīng)小于70度,并防止傾倒。
3.貯存門窗的環(huán)境溫度應(yīng)小于50℃并離熱源距離不小于1000mm。門窗在安裝現(xiàn)場(chǎng)放置時(shí)間不應(yīng)超過兩個(gè)月。安裝門窗時(shí),環(huán)境溫度不應(yīng)低于5℃,當(dāng)環(huán)境溫度小于零度時(shí),安裝前應(yīng)在室溫下放置24小時(shí)。
4.裝運(yùn)門窗的運(yùn)輸工具應(yīng)設(shè)有防雨措施并保持清潔。運(yùn)輸時(shí)應(yīng)豎直立放并車體用繩索攀牢,防止因車輛顛震面損壞。樘與樘之間應(yīng)用非金屬軟質(zhì)材料隔開;五金配件應(yīng)相互錯(cuò)開,必要時(shí)襯以墊層隔開,以避免相互磨損和碰撞窗扇。確保玻璃無損傷。
5.裝卸門窗時(shí),應(yīng)輕拿慢放,不得撬、甩、摔。吊運(yùn)時(shí),起吊點(diǎn)應(yīng)選擇窗框外沿,其表面應(yīng)采用非金屬軟質(zhì)材料隔開,不得在框扇內(nèi)插入抬杠起吊。
6.安裝門窗的構(gòu)件和零附件的材料品種、規(guī)格、色澤和性能應(yīng)符合設(shè)計(jì)要求。門窗安裝前,應(yīng)按設(shè)計(jì)圖紙的要求檢查門窗的數(shù)量、品種、規(guī)格、開啟方向、外型等。門窗的五金件、密封條、緊固件應(yīng)齊全。如發(fā)現(xiàn)型材有碰裂等情況,不得安裝上墻;五金配件有松動(dòng)現(xiàn)象者,應(yīng)進(jìn)行修理調(diào)整。
四、施工組織 1.任命 田巍 同志為該工程的施工負(fù)責(zé)人,全面負(fù)責(zé)工程施工的組織領(lǐng)導(dǎo),協(xié)調(diào)現(xiàn)場(chǎng)技術(shù)的指導(dǎo)和處理及其它各方面的工作。
2.設(shè)立施工隊(duì)長一名,施工工藝員一名,質(zhì)檢員一名,安檢員一名,全面負(fù)責(zé)工程的施工組織、施工質(zhì)量及安全工作的實(shí)施。
五、施工工藝
1.窗的安裝
⑴根據(jù)施工圖紙將各種規(guī)格的門窗搬運(yùn)到相應(yīng)的洞口旁豎放。若發(fā)現(xiàn)保護(hù)膜脫落,應(yīng)補(bǔ)貼保護(hù)膜。在窗框上下邊劃中線。
⑵如果玻璃已裝上窗扇,應(yīng)卸下玻璃和窗扇,并作好標(biāo)記。
⑶檢查窗框上下邊的位置及其內(nèi)外朝向,未裝滑輪的窗扇,應(yīng)保證橡膠條口朝上。
⑷固定片的安裝 A.安裝固定片應(yīng)采用直徑為Ф3.2的鉆頭,然后將十字槽盤頭自攻螺絲擰入M4×20,不得直接錘擊釘入。B.固定片的位置應(yīng)距離窗角、中豎框、中橫框200mm,固定片之間的距離應(yīng)小于或等于600mm,不得將固片直接裝在中橫框、中豎框檔頭上。C.固定片的安裝除特殊注明外,均應(yīng)按圖紙配置,固定片鐵腳向內(nèi)固定。
⑸測(cè)出各洞口中線,并逐一作出標(biāo)記。多層建筑,可以從高層一次垂吊。
⑹將窗框裝入洞口,其上下框中線應(yīng)與洞口中線位置對(duì)齊;窗的上下框四角及橫框的對(duì)稱位置應(yīng)用木塞作臨時(shí)固定。當(dāng)下框長度大于0.9米時(shí),其中央也應(yīng)用木塞緊。然后應(yīng)按設(shè)計(jì)圖紙確定窗框在洞口墻體厚度方向的安裝位置,并用水平尺、吊線錘、規(guī)尺調(diào)整窗框的垂直度,水平度及直角度,水平度及直角度,其允許偏差應(yīng)符合以下的規(guī)定。門窗安裝的允許偏差(mm)項(xiàng) 目 允許偏差mm 檢驗(yàn)方法 門窗框兩對(duì)角線長度差 ≤2000mm ±3.0 用3m卷尺檢查,量內(nèi)角 門窗框(拼樘料正側(cè)面的垂直度)≤2000mm ±2.0 用線墜、水平靠尺檢查 ≥2000mm ±2.0 門窗框(含拼樘料)的水平垂直度 ≤2000mm ±2.0 用水平靠尺檢查 >2000mm平開門(窗)及推拉窗 ±3.0 推拉門 ±2.5 門窗下橫框的標(biāo)高 ±5.0 用鋼尺檢查,與基準(zhǔn)線比較 雙層門窗內(nèi)外框、框(含拼樘料)中心距 ±4.0 用鋼板尺檢查 門窗豎向偏離中心 ±5.0 用線墜、鋼板尺檢查平開窗 扇與框搭接寬度 ±2.0 用深度尺或鋼板尺檢查 同樘門窗相鄰扇的橫角高度差 ±2.0 用拉線或鋼板尺檢查 門窗框鉸鏈部位的配合間隔 ±2.0-1.0 用楔塞尺檢查 推拉門窗 扇與框搭接寬度 ±2.5 用深度尺或鋼板尺檢查 門扇與框或相鄰扇立邊平行度 ±2.0 用1m鋼板尺檢查
⑺在窗與墻體固定時(shí),應(yīng)先固定上下框,后固定兩側(cè)邊框,其固定方法應(yīng)符合下列要求: A.混凝土墻洞口,應(yīng)采用射釘固定;B.加氣混凝土洞口,應(yīng)采用木螺釘將固定片固定在預(yù)留的小紅磚上。
⑻將兩窗框與拼樘料卡接時(shí),應(yīng)先清除連接處窗角的焊渣,卡接后應(yīng)用堅(jiān)固雙向擰緊,期間距應(yīng)不大于600mm;距兩端間距不大于200mm;緊固件端頭及拼樘料與窗框間的縫隙應(yīng)采用嵌縫膏進(jìn)行密封處理。
⑼當(dāng)需要裝窗臺(tái)板時(shí),應(yīng)按設(shè)計(jì)要求將其插入窗下框,并應(yīng)使窗臺(tái)板與下邊框結(jié)合緊密,其安裝的水平精度應(yīng)與窗框一致。
⑽窗洞口內(nèi)外側(cè)與窗框之間縫隙的處理應(yīng)符合下列要求。A.普通單玻窗:其洞口內(nèi)外測(cè)與窗框之間應(yīng)采用水泥砂漿或麻刀白灰漿填實(shí)抹平;靠近鉸鏈一側(cè),灰漿壓住窗框珠厚度宜以不影響扇的開啟為限,待水泥砂漿硬化后,其外側(cè)應(yīng)采用嵌縫膏進(jìn)行密封處理。B.保溫、隔聲窗:其洞口內(nèi)外測(cè)與窗框之間應(yīng)采用水泥砂漿填實(shí)抹平;當(dāng)外側(cè)抹灰時(shí),應(yīng)采用片材將抹灰層與窗框臨時(shí)隔開,其厚度宜為5mm,抹灰時(shí),應(yīng)超出窗框,其厚度以不影響扇的開啟為限。待外抹灰層硬化合,應(yīng)撤去片材,并將密封膠擠入抹杰層與窗框縫隙內(nèi)。保溫、隔聲等級(jí)要求較高的工程,洞口內(nèi)側(cè)與窗框之間也就采用密封膠密封。C.注密封膠時(shí)應(yīng)均勻不間斷,并不可超出邊框。
⑾窗(框)扇上若粘有水泥砂漿,應(yīng)在其硬化前,用濕布擦拭干凈,不得使用硬質(zhì)材料鏟、擦窗框(扇)表面。
⑿安裝玻璃應(yīng)符合下列規(guī)定。A.應(yīng)按照窗扇內(nèi)口實(shí)際尺寸計(jì)劃用料,合理裁割玻璃。B.玻璃不得與玻璃槽直接接觸,并應(yīng)在玻璃四邊根據(jù)玻璃與框扇的間隙墊上不同厚度的玻璃墊塊。C.邊框上的墊塊,應(yīng)采用聚乙烯膠加以固定。D.將玻璃裝入框扇內(nèi),然后應(yīng)用玻璃壓條將其固定,安裝玻璃壓條應(yīng)先短后長。相鄰兩條間隙不大于1mm。E安裝雙層玻璃時(shí),玻璃夾層四周應(yīng)嵌入中隔條,中隔條應(yīng)保證密封、不變形、不脫落;玻璃槽及玻璃內(nèi)表面應(yīng)干燥、清潔。F.鍍膜玻璃應(yīng)裝在玻璃的最外層;單面鍍膜層應(yīng)朝向室內(nèi)。G.當(dāng)保溫要求三級(jí)及三級(jí)以上時(shí),應(yīng)采用中空玻璃,中空玻璃安裝方法與單層玻璃相同。
⒀ 裝紗窗(門)、紗窗鉸鏈及鎖扣,整理紗網(wǎng)和壓實(shí)壓條。安裝五金配件。
六、施工安全
1.施工現(xiàn)場(chǎng)成品及輔料應(yīng)堆放整齊、平穩(wěn),并應(yīng)采取防火等安全措施。
2.施工人員應(yīng)配備安全帽、安全帶、工具袋。
3.在高層門窗安裝與上部結(jié)構(gòu)施工交叉作業(yè)時(shí),結(jié)構(gòu)施工層下方應(yīng)架設(shè)防護(hù)網(wǎng),在離地面3m高處,應(yīng)搭設(shè)挑出6m的水平安全網(wǎng)。
4.安裝門窗、玻璃或擦拭玻璃時(shí),嚴(yán)禁使窗框、窗扇和窗撐受力;操作時(shí),應(yīng)系好安全帶,嚴(yán)禁把安全帶掛在窗撐上。
5.施工工具在使用前應(yīng)進(jìn)行嚴(yán)格檢查。電動(dòng)工具應(yīng)作絕緣電壓試驗(yàn),確保無漏電現(xiàn)象;當(dāng)使用射釘時(shí)應(yīng)采取安全保護(hù)措施。
七、安裝后的保護(hù)
1.門窗安裝完成后,應(yīng)及時(shí)制定清掃方案,清除表面粘附物,避免排水孔堵塞,并采取防護(hù)措施,不得使門窗受污損。
2.已裝門窗框、扇的洞口,不得再作運(yùn)料通道。
3.嚴(yán)禁在門窗框、扇上安裝腳手架、懸掛重物、外腳手架不得頂壓在門窗框、扇或窗撐上,嚴(yán)禁蹬踩門窗框、扇或窗撐。
4.應(yīng)防止利器劃傷門窗表面,并應(yīng)防止電、氣焊火花燒傷或燙傷面層。
5.立體交叉作業(yè)時(shí),門窗嚴(yán)禁被碰撞。
6.清洗玻璃的中性清潔劑,應(yīng)進(jìn)行腐蝕性檢驗(yàn),用中性清潔劑清洗后應(yīng)及時(shí)清水沖洗干凈。
八、工程驗(yàn)收
1.門窗工程驗(yàn)收前應(yīng)去掉保護(hù)膜,將其表面擦洗干凈。
2.在安裝過程中,施工單位應(yīng)按工序進(jìn)行自檢,在自檢合格的基礎(chǔ)上,申報(bào)驗(yàn)收部門檢驗(yàn)
第五篇:鋁合金門窗合同樣本
彩鋁門窗制作安裝合同
發(fā)包方:(以下簡稱甲方)承包方:(以下簡稱乙方)
根據(jù)甲乙雙方友好協(xié)商,甲方委托乙方承擔(dān) 鋁合金門窗項(xiàng)目的設(shè)計(jì)、制作、安裝工作,依照《合同法》、《中華人民共和國建筑法》及其他有關(guān)法律、法規(guī),經(jīng)雙方協(xié)商一致,訂立本合同。
第一條 概況
一、項(xiàng)目名稱:
二、地 址:
三、項(xiàng)目概況: 總建筑面積: m2;
四、工程范圍: 鋁合金門窗(材質(zhì)為鋁合金,包括 等)面積約 m2。
第二條
工程承包方式
本工程為固定單價(jià)合同方式,單價(jià)包括制作、運(yùn)輸、保管、稅金、保險(xiǎn)、管理費(fèi)、利潤、安裝、保修、防腐、防水等一切所需費(fèi)用。結(jié)算時(shí)按實(shí)際工程量乘以相應(yīng)的單價(jià)進(jìn)行結(jié)算。
第三條 工期要求
本項(xiàng)目總工期為 天(日歷天);
自甲方下達(dá)全面施工指令單起 天內(nèi)完成全部鋁合金門窗安裝施工。第四條 工程質(zhì)量等級(jí)
合格 第五條 工程合同價(jià)款
本項(xiàng)目鋁合金門窗工程量約為 m2。工程總價(jià)暫定為 萬元(大寫:人民幣 元);其單價(jià)詳報(bào)價(jià)匯總表。
共 6 頁 · 第 1 頁
第六條 工程款的支付1、2、3、4、第七條 主要材料的確定
1、鋁型材:
2、玻璃:
3、五金配件:
4、密封膠: 中性硅酮密封膠。
第八條 雙方責(zé)任 甲 方:
1、甲方全面負(fù)責(zé)現(xiàn)場(chǎng)的指導(dǎo)工作,安排生產(chǎn)計(jì)劃和施工前的圖紙會(huì)審,向乙方提供建筑施工圖紙壹套。
2、甲方向乙方提供施工圖紙要求的洞口尺寸。
3、甲方提供現(xiàn)場(chǎng)垂直運(yùn)輸機(jī)械及外墻腳手架。
4、甲方給乙方提供水源、電源,其費(fèi)用由乙方負(fù)責(zé)。
5、甲方協(xié)調(diào)處理各單位的配合工作,負(fù)責(zé)解決乙方人員的現(xiàn)場(chǎng)住宿及材料堆放、加工場(chǎng)地。
6、甲方向乙方按進(jìn)度及時(shí)支付工程款。
7、現(xiàn)場(chǎng)代表: 聯(lián)系電話: 乙 方:
1、乙方必須負(fù)責(zé)該鋁合金工程技術(shù)指標(biāo)試驗(yàn)工作。
2、負(fù)責(zé)編制該鋁合金工程的施工方案,編制該鋁合金工程技術(shù)資料和竣工資料。
3、負(fù)責(zé)教育本班組工人遵守有關(guān)安全施工規(guī)定,若違規(guī),責(zé)任由乙方負(fù)責(zé)。班組進(jìn)場(chǎng)前應(yīng)與甲方另簽安全施工協(xié)議書。
共 6 頁 · 第 2 頁
4、乙方所有工作人員,必須按照相關(guān)要求具備上崗證。
5、乙方必須精心選購符合國家標(biāo)準(zhǔn)的工程材料,并經(jīng)甲方和業(yè)主認(rèn)可后方能用于工程施工,乙方配備該鋁合金工程施工的一切工具。
6、乙方必須對(duì)所有鋁合金門窗安裝的框四周進(jìn)行塞縫處理,乙方應(yīng)進(jìn)行認(rèn)真自檢,經(jīng)甲方、監(jiān)理單位和建設(shè)方三方檢查合格后才能進(jìn)行下道工序,否則造成的質(zhì)量問題由乙方承擔(dān)。
7、嚴(yán)格按圖紙施工,必須文明施工、確保安全、確保質(zhì)量、確保工期,對(duì)因乙方原因造成的質(zhì)量、安全事故乙方應(yīng)承擔(dān)責(zé)任和法律責(zé)任。
8、如因乙方對(duì)安裝鋁材的保護(hù)、維護(hù)工作未做好,而發(fā)生的鋁材銹蝕、變形等,由乙方根據(jù)甲方要求自行清理或更換,達(dá)到甲方要求。
9、安全:乙方在施工過程中,自己造成的大小安全事故,由乙方自行負(fù)責(zé)。
10、現(xiàn)場(chǎng)負(fù)責(zé)人:
聯(lián)系電話: 第九條 工程的中間驗(yàn)收與竣工驗(yàn)收
為保證工程質(zhì)量,本工程的驗(yàn)收分三步進(jìn)行:
1、門窗及材料進(jìn)場(chǎng)施工前驗(yàn)收,主要對(duì)窗材質(zhì)厚度等進(jìn)行質(zhì)量驗(yàn)收;
2、施工過程各分項(xiàng)工程驗(yàn)收(含隱蔽工程驗(yàn)收),主要對(duì)安裝質(zhì)量進(jìn)行驗(yàn)收,安裝數(shù)量平方米數(shù)只作登記不作最終驗(yàn)收結(jié)果;
3、竣工驗(yàn)收,全面對(duì)門窗進(jìn)行質(zhì)量及安裝面積進(jìn)行驗(yàn)收。
以上前兩步本合同通稱為中間驗(yàn)收,所有驗(yàn)收應(yīng)嚴(yán)格按照國家現(xiàn)行施工、監(jiān)理、質(zhì)量驗(yàn)收規(guī)范執(zhí)行,關(guān)于中間或竣工驗(yàn)收的程序?yàn)椋?/p>
1、工程具備中間或竣工驗(yàn)收條件兩天內(nèi),乙方按國家關(guān)于工程中間或竣工驗(yàn)收規(guī)定向甲方提供完整的交工資料及驗(yàn)收?qǐng)?bào)告。
2、甲方收到乙方中間(竣工)驗(yàn)收?qǐng)?bào)告之日起48小時(shí)(兩天)內(nèi)給予認(rèn)可或提出整改意見;乙方按要求整改,并承擔(dān)由于自身原因造成的整改費(fèi)用,并重新提交驗(yàn)收?qǐng)?bào)告。
3、甲方收到乙方送交的中間(竣工)驗(yàn)收?qǐng)?bào)告之日起48小時(shí)(兩天)內(nèi)不組織驗(yàn)收或
共 6 頁 · 第 3 頁
驗(yàn)收后48小時(shí)(兩天)沒有提出修改意見,視為驗(yàn)收?qǐng)?bào)告已被甲方認(rèn)可。
4、工程竣工日期的確定:當(dāng)工程一次通過驗(yàn)收,以乙方送交驗(yàn)收?qǐng)?bào)告的日期為實(shí)際竣工日期;否則以最后通過驗(yàn)收所送交的驗(yàn)收?qǐng)?bào)告日期為實(shí)際竣工日期。
5、窗樣品驗(yàn)收、中間驗(yàn)收、竣工驗(yàn)收,必須有甲方主管工長、質(zhì)量總監(jiān)、指揮長初驗(yàn)合格后組織監(jiān)理方監(jiān)理工程師、建設(shè)單位主管工程師、總工程師、主管副總聯(lián)合驗(yàn)收,合格后再報(bào)質(zhì)量監(jiān)督站、技術(shù)監(jiān)督局驗(yàn)收。
5、乙方在工程通過驗(yàn)收之日起三天內(nèi)與甲方辦理交接手續(xù)。第十條 關(guān)于工程變更(返工)的約定
工程在施工中,由于雙方的原因造成工程的變更(返工)具體規(guī)定為:
1、因甲方主動(dòng)提出的變更,其費(fèi)用甲方按實(shí)際情況在工期或費(fèi)用上予以簽證并按實(shí)結(jié)算。
2、由于乙方的原因?qū)δ骋徊糠肿鳂I(yè)無法達(dá)到合同規(guī)定的質(zhì)量要求或由于這部分質(zhì)量原因影響到另一部分必須處理的,則由乙方全部負(fù)責(zé)修整或返工,直至完全滿足合同要求為止,由此發(fā)生的一切費(fèi)用和工期延誤均由乙方負(fù)責(zé),甲方不負(fù)任何補(bǔ)償?shù)呢?zé)任。第十一條 工期順延
施工過程中遇有下列情況,工期相應(yīng)順延:
1、非乙方原因造成影響工程施工的,任何一天有連續(xù)四小時(shí)以上的停水、停電。
2、因甲方變更而停止。
3、不可抗力因素。第十二條 違約
1、合同生效后,任何一方在未違約的情況下,甲、乙雙方均不得單方終止合同,否則視為違約,違約方除需向?qū)Ψ街Ц侗竞贤們r(jià)款的20%的違約金,還需賠償對(duì)方因此造成的所有損失。
2、甲方需嚴(yán)格按本合同約定的時(shí)間向乙方支付工程款,否則每延誤一天應(yīng)償付未支付工程款的萬分之三滯納金,按日累計(jì)。
共 6 頁 · 第 4 頁
3、乙方按所約定的時(shí)間完成本合同,否則每延期一天,應(yīng)罰款每日貳仟元,按日累計(jì)。
4、乙方所供的門窗在進(jìn)場(chǎng)后,經(jīng)甲方技術(shù)人員及 工程師檢查出有質(zhì)量問題的窗,甲方有權(quán)退貨并由乙方立即組織重新進(jìn)貨,乙方承擔(dān)由此產(chǎn)生的所有責(zé)任。
中途毀約處理:
乙方中途毀約,則已完成的工程量歸甲方所有,甲方按已完成的工程量及已購進(jìn)的材料總額50%支付乙方工程款。
甲方中途毀約,則甲方支付所有乙方已完成部分工程量的工程款及已購買屬本工程所用但尚未使用材料款。
第十三條 爭議
合同履約過程中如發(fā)生爭議,雙方應(yīng)及時(shí)友好協(xié)商解決,協(xié)商不成任何一方可向海口市仲裁委員會(huì)申請(qǐng)仲裁。
第十四條 其他事項(xiàng)
1、本工程嚴(yán)禁乙方轉(zhuǎn)包或變相轉(zhuǎn)包,或者肢解以后以其他名義分別轉(zhuǎn)包他人。否則一經(jīng)發(fā)現(xiàn)均視為乙方中途毀約,甲方有權(quán)單方解除合同。
2、雙方在工程開工前均須向?qū)Ψ綍孢f交本方主要管理人員及其在本工程中分管工作及權(quán)限的名單。
3、本合同未盡事宜,雙方在履約過程中可另簽訂補(bǔ)充協(xié)議。
4、本合同一式肆份,均具有同等法律效力,雙方各執(zhí)貳份,經(jīng)雙方簽字蓋章即生效。
5、工程竣工交接,雙方結(jié)清工程尾款后本合同自行終止。